ML20032B309

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-289/81-24 on 810813 & 0901-1002.No Noncompliance Noted
ML20032B309
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/21/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
METROPOLITAN EDISON CO.
Shared Package
ML20032B310 List:
References
NUDOCS 8111050419
Download: ML20032B309 (2)


See also: IR 05000289/1981024

Text

_

- - - - . - . - -

- - -

l

\\

,

.

ym

7

,4-

g

,

'g

-

-

+

g',

c

~

OCT 21 I33}

,

Docket No. 50-289

e, e

,4

jY

AG

Y~Q

Metropolitan Edison Company

2 NOVO 4 Jggy 1

d

.

ATTN: M:

H. D. Hukill

Vice President and Director of THI-1

b. , u.s, %m m m %sas p

-

^

~~

P.O. Box 480

Middletown, Pennsylvania 17057

9

d

w

5

Gent 1emen :

Subject: Inspection 50-239/81-24

This refers to the routine safety inspection conducted by Mr. D. Haverkamp

of this office on August ,13,1981 and September 1 through October 2,1981,

of activities huthorized by' NRC License DPR-50 and to the discussions of

our findings held by Mr. Haverkamp with Messrs R. Toole and C. Stephenson

of the GPU Nuclear staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with 10 CFR 2.790 of the Commissio. 's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within 10 days from the date of this letter of your intention

to file a request for withholding; and (b) submit within 25 days from

the date of this letter a written application to this office to withrold

such infomation.

Consistent with section 2.790(b)(1), any such application

must be accompanied by an affidavit executed by the owner of the information

which ideAtifies the document or part sought to be withheld, and which

contains a full statement of the reasons on the basis which it is clained

that the infomation should be withheld from public disclosure.

This

section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4). The infornation sought to

be withheld shall be incorporatrd as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, the report will be placed in the

Public Document Room.

The telephone notification of your intent to

t AtW>W ,-cr any reque:t fer an extensier of the 10 day

.

req ='d which you believe necessa'ry, should be hade to the Sdpervisor,"" t

9

omcr >!

I

perio

s,,Q

' Mss l,"Rdil"and ' rec 6rds,"'05MC' Re gisf T,"at" (215)"337"5227.

'"

,

' '" > L

8111050419 811021

'

,j[T

l

{DRADOCK05000g

,

, , , ,

werow m eso e c"' "

OFFICIAL RECORD COPY

  • * mm

!

.

.

'

OCT 21 I30

'

lietropolitan Edison Company

-2-

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely.

Orisisal signed By,;

g

.

.

JV

v

f.

R.

. Keinig, Chief

Projects Branch 12, Division of

Resident and Project Inspection

Enclosure: Office of Insp : tion and Enforcement Inspection

Report Num!"

20-289/81-24

cc w/ enc 1:

R. J. Toole, Operations and Maintenance Director TMI-1

C. W. Smyth, Supervisor TMI-1 Licensing

E. G. Wallace, Manager PWR Licensing

J. B. Liberman, Esquire

G. F. Trowbridge, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (KSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment

(wo/ enc 1)

bcc w/ encl:

Region I Docket Room (w/ concurrence)

L. Barrett, Deputy Program Director, TMI Program Office

D. Swanson, OELD:HQ

Chief, Operational Support Section (wo/ enc 1)

Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment

A

.1

DRPI#2

omer) TM

.}

aa~ ~ > M.a,ve,r , a m e.,

,,6. s,an,9,,,,, ,,,,se.i .

. . . .

,,...

,

,. .

... ,

.

,

..

... .. .. ,,,

,,,,,,,/,ro/ 81

10

=> 19h.tL81. ....

10/f!;a1

,,

, , , , , , , , , ,

,,,,,, , , , , , , , , , ,

,,,,,

,

, , , , , ,,

, , , ,,, ,,

..

, ,,,,,

" " " " " ' ' ' " ' ' ' " " " " * '

OFFICIAL RECORD COPY

)