Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- A02207, Advises That Odyn Analysis Will Not Be Performed for Current Cycle,As Permitted in NRC 810911 & 1229 Ltrs.First Reload Application Will Be Submitted Using Odyn for Transient Analyses in Support of Cycle 9 Submittal + (01:07:36, 20 December 2024)
- ML20041B899 + (01:07:38, 20 December 2024)
- ML20041B898 + (01:07:38, 20 December 2024)
- ML20041B896 + (01:07:39, 20 December 2024)
- ML20041B897 + (01:07:39, 20 December 2024)
- ML20041B895 + (01:07:43, 20 December 2024)
- IR 05000329/1982001 + (01:07:46, 20 December 2024)
- ML20041B892 + (01:07:48, 20 December 2024)
- ML20041B889 + (01:07:49, 20 December 2024)
- ML20041B890 + (01:07:49, 20 December 2024)
- ML20041B888 + (01:07:50, 20 December 2024)
- ML20041B884 + (01:07:51, 20 December 2024)
- ML20041B882 + (01:07:53, 20 December 2024)
- ML20041B883 + (01:07:53, 20 December 2024)
- 05000331/LER-1982-008-03, /03L-0:on 820121,LPCI Sys & RHR Svc Water Sys a Declared Inoperable Due to Piping Stress in Excess of Code Allowables.Cause Unknown.Snubber GBC-1-SS-56 & RHR Sys Valve Replaced + (01:07:55, 20 December 2024)
- ML20041B879 + (01:07:57, 20 December 2024)
- PNO-I-82-021, on 820218,Washington,DC Bank Opened Safe Deposit Box in Which Glass Ampules Containing Radium Paint & Small Quantities of Co-60,Pb-210 & Polonium Were Found. Matl Presented No Hazard to Persons While Stored in Vault + (01:07:59, 20 December 2024)
- ML20041B877 + (01:08:00, 20 December 2024)
- 05000331/LER-1982-008, Forwards LER 82-008/03L-0 + (01:08:01, 20 December 2024)
- ML20041B874 + (01:08:03, 20 December 2024)
- ML20041B871 + (01:08:04, 20 December 2024)
- ML20041B873 + (01:08:04, 20 December 2024)
- ML20041B870 + (01:08:05, 20 December 2024)
- ML20041B867 + (01:08:06, 20 December 2024)
- ML20041B869 + (01:08:06, 20 December 2024)
- ML20041B864 + (01:08:07, 20 December 2024)
- ML20041B863 + (01:08:08, 20 December 2024)
- ML20041B862 + (01:08:09, 20 December 2024)
- IR 05000289/1981027 + (01:08:13, 20 December 2024)
- ML20041B857 + (01:08:15, 20 December 2024)
- ML20041B856 + (01:08:17, 20 December 2024)
- ML20041B855 + (01:08:20, 20 December 2024)
- ML20041B850 + (01:08:24, 20 December 2024)
- ML20041B849 + (01:08:25, 20 December 2024)
- ML20041B848 + (01:08:26, 20 December 2024)
- ML20041B847 + (01:08:27, 20 December 2024)
- IR 05000309/1981018 + (01:08:31, 20 December 2024)
- ML20041B841 + (01:08:36, 20 December 2024)
- ML20041B840 + (01:08:37, 20 December 2024)
- 05000237/LER-1982-002-03, /03L-0:on 820122,reactor Bldg to Torus Vacuum Breaker valve,2-1601-20B,failed to Open During Surveillance, Dis 1600-3.Caused by Solenoid Valve VGS-4522 Failure Due to Hardened O Rings.Solenoid Valve Replaced + (01:08:38, 20 December 2024)
- ML20041B838 + (01:08:40, 20 December 2024)
- ML20041B836 + (01:08:41, 20 December 2024)
- ML20041B835 + (01:08:41, 20 December 2024)
- ML20041B833 + (01:08:42, 20 December 2024)
- ML20041B832 + (01:08:43, 20 December 2024)
- 05000249/LER-1982-006-03, /03L-0:on 820122,quarterly Storage Battery Surveillances Not Performed for Third Quarter 1981. Caused by Miscoordination Between Implementing New Battery Check Procedure & Revising Computer Program + (01:08:45, 20 December 2024)
- 05000237/LER-1982-002, Forwards LER 82-002/03L-0 + (01:08:47, 20 December 2024)
- ML20041B828 + (01:08:48, 20 December 2024)
- ML20041B827 + (01:08:50, 20 December 2024)
- 05000254/LER-1981-019-03, While Testing HPCI Operability,During Motor Speed Changer Control Linkage Adjustments,Torus Level Approached Tech Spec Limit.Testing Continued Until Operability Verified + (01:08:51, 20 December 2024)
- 05000249/LER-1982-006, Forwards LER 82-006/03L-0 + (01:08:53, 20 December 2024)