SAXTON NUCLEAR EXPERIMENTAL CORPORATION ANNUAL REPORT FOR THE PERIOD JANUARY 1, 1981 - DECEMBER 31, 1981 i

8202250280 820216 i

PDR ADOCK 05000146 R

t

/

PDR

Annual Report in compliance with Paragraph B.S.b of the Technical Specifications:

1.

"Information relating to changes in those staff positions that are designated as being responsible for the deactivated facility."

During 1981, a Radiological and Environmental Monitoring Program was established for Saxton, and a Manager for this Program was appointed.

In addition, a SNEC Radioation Safety Officer was appointed and a SNEC Dosimetry Supervisor was ap-pointed.

2.

"A summary of entries into the Containment Vessel oe Radioactive Waste Disposal Facility and reasons for entry."

Entries were made into the Containment Vessel and Radioactive Waste Disposal Facility as follows:

Date Purpose 3/19/81 Site Inspection 3/24/81 Quarterly Inspection 4/1/81,4/20/81,4/21/81 Radioative and Photographic Surveys for Dismantling

. Study 6/9/81,6/10/81 Containmental Vessel Sump Water Removal 6/12/81 Quarterly Inspection 7/14/81 Tour for Dismantling Study Bidders 7/27/71,7/28/91 Radiation Surveys for Dismantling Study 9/2/81,9/3/81 Tour for Burns & Roe for Dismantling Study 9/17/81 Quarterly Inspection 9/28/81 Steam Generator Crud Sample 12/23/8,1 Quarterly Inspection "A summ!ary of maintenance and design changes made to the deactivated facility."

3.

Broken 'coof drains in the Control and Auxiliary Building were repaired.

4.

"Results of surveys of radioactivity levels and of water sample analyses."

The results of the 1981 Quarterly Inspections of the facility are as follows:

Radiation levels at the exclusion area fence were less than 0.1 mR/hr; radiation levels on the Containment Vessel breather pipe filter were less than 0.15 mR/hr; radiation levels of the 20 permanently marked survey points in the Containment Vessel ranged from less then 0.05 to 0.18 mR/hr (fixed) and from less than 500 dpm to 1780 dpm (loose); radiation levels in the Containment Vessel above elevation 812' were less than 0.1 mR/hr.

Analysis of water samples taken from the RWDF, Tunnel and Containment sump are as follows:

Sample Location Date Nuclide Activity (uCi/ml)

Tunnel 3/24/81 Cs-134

< l.59E-7 Cs-137 6.82E-7 + 2.llE-7 Co-58

< l.4 7E-7 Co-60

< l. 97E-7 RWDF 3/24/81 Cs-134

< l. 37E-7 Cs-137 7.29E-7 + 2.01E-7 Co-58

< l. 02E-7 Co-60

< 2.14E-7 d

2 4.

(continued)

Sample Location Date Nuclide Activity (uCi/ml)

Tunnel 6/12/81 Cs-134

< 2.7E-7 Cs-137 2.0E-7 1 6.2E-8 Co-58

< 2.5E-7 Co-60

< 3.6E-7 RWDF 6/12/81 Cs-134

< 2.6E-7 Cs-137

< 3.7E-7 Co-58

< 2.5E-7 Co-60

< 3.6E-7 Containment Sump 6/10/81 Cs-134 6.5E-5 1 1.2E-6 Cs-137 3.0E-3 1 7.9E-6 (Note: water removed Co-58

< 6.3E-7 from sump on 6/10/81)

Co-60 2.lE-6 1 2.5E-7 Tunnel 9/17/81 Cs-134

< 2.6E-7 Cs-137 3.0E-7 9.3E-8 Co-58

< 2.4E-7 Co-60

< 3.6E-7 RWDF 9/17/81 Cs-134

< 1.5E-7 Cs-137 3.0E-7 1 5.8E-8 Co-58

< l.4E-7 Co-60,

< 2.0E-7 Containment Sump 9/17/81 No water present.

Tunnel 12/23/81 Cs-134

< l.5E-7 Cs-137 5.lE-7 1 1.0E-7 Co-58

< l.4E-7 Co-60

< 2.0E-7 RWDF 12/23/81 Cs-134

< 1.5E-7 Cs-137 3.4E-7 1 6.9E-8 Co-58

< 1.4E-7 Co-60

< 2.0E-7 i

l Containment l

Sump 12/23/81 Insufficient water present to take sample.

Inspection of the Containment Vessel lower levels indicates the vessel is dry and free of water.

i 5.

"A summary of the performance of security and surveillance measures."

There were no observed attempted break-ins, vandalism or other unusual events at the facility during 1981.

I The water in the Containment Vessel sump, reported by SNEC letter to NRC Office of l

Inspection and Enforcement dated May 20, 1981, was removed, solidified and shipped off-site for burial in June 1981.

f t

i

3 The drums of contaminated soil stored in the Control and Auxiliary Building were shipped off-site for burial in June 1981.

l i

i f

I l

l l

l l

l 2/16/82 CRM/1s

,