ML20041B867

From kanterella
Jump to navigation Jump to search
Forwards Saxton Nuclear Experimental Corp Annual Rept for Jan-Dec 1981, in Compliance W/Paragraph B.5.b of Tech Specs
ML20041B867
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 02/16/1982
From: Cindy Montgomery
SAXTON NUCLEAR EXPERIMENTAL CORP.
To: Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML20041B868 List:
References
SNEC-100, NUDOCS 8202250277
Download: ML20041B867 (1)


Text

.

SAXTON NUCLEAR EXPERIMENTALCORPORATION uE G EN ER AL P U B LIC U TIL ITI ES SY S T E M P SNE JEasEY CENTRAL POWER R LIG HT CO MPANY PEN N S YLVA NI A ELECTRIC COM PANY MET ROPOLITAM EDIS CN COMPANY PE JC g AILING A D D R E S 5 *.

TELEPH O N E i 10 0 INTERPACE PARKWAY 201-263-6500 PARSIPPANY, N.J. 070 54 e

February 16, 1982

'V File: SNEC-100

g, Docket No. 50-146 a

FEB 241982a_ l-License No. DPR-4 g-s: u.au uzrir w.

C2 DQci nux,r f M DC p

9 s/

Mr. Robert L. Tedesco 4>

to Assistant Director for Licensing United States Nuclear Regulatory Commission Washington, DC 20545

Dear Mr. Tedesco:

The Saxton Technical Specifications require that Saxton submit to the Commission, on an annual basis, a written report covering the status of the decommissioned facility.

In compliance with Paragraph B.5.b of the Technical Specifications, Saxton herewith sub-mits a report for the period January 1,1981, through December 31, 1981.

Forty copies of the report are enclosed.

Very truly yours, Mi bb%

C. R. Montgomery President Enclosure CC:

R. B. Heist w/ enclosure S

//

8202250277 820216 PDR ADOCK 05000146 R

PDR

--