Docket No. 50-309
S
R gc/ Mfg
.
,
s
Maine Yankee Atomic Power Company
-
EEBg4 IOS2a i
,
S
"'"Mr
ATTN:
Mr. Robert H. Groce
NP
Senior Engineer - Licensing
- " "t
',
1671 Worcester Road
y
4
/, (Mj;
Framingham, Massachusetts 01701
'
It c; )
Gentlemen:
Subject:
Inspection No. 50-309/81-18
This refers to the routine safety inspection conducted by Mr. K. Plumlee of
this office on July 27-30, 1981 of activities at the Maine Yankee Nuclear
Power Station authorized by NRC License No. DPR-36 and to the discussions of
our findings held by Mr. K. Plumlee with Mr. E. Wood and others of your staff
at the conclusion of the inspection.
Areas examined during tofs inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by
the inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
No reply to this letter is required; however, if you have any questions concerning
this inspection, we will be pleased to discuss them with you.
Sincerely,
WY
M Thomas T. Martin, Chief,
Division of Engineering and
Technical Inspection
K$f
S
(f ,
f
RI:DETI
RITDETI
HI:UETI
RD I
Plumlee/ gwc
Kagpp
Joyner
Ma
in
0FFICIAL RECORD COPY
l
M
8202250249 820211
f6
DR ADOCK 05000
f
o
.
Maine Yankee Atomic Power Company
2
FEB 11 E62
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-309/81-18
cc w/ encl:
E. Wood, Plant Superintendent
E. W. Thurlow, President
J. H. Garrity, Director, Nuclear Engineering & Licensing
State of Maine
NRC Resident Inspector
bcc w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
Director, Division of Resident and Project Inspection
OFFICIAL RECORD COPY
J