Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309E146 + (08:06:10, 2 January 2025)
- ML19309E144 + (08:06:11, 2 January 2025)
- 05000327/LER-1980-021-03, /03L-0:on 800308,while in Mode 6,flow Rates from Auxiliary Bldg Ventilation Sys Flow Rate Monitor Were Not Recorded for Three Shifts.Caused by Misreading of Notation Used in Surveillance Instruction.Temporary Change Issued + (08:06:13, 2 January 2025)
- ML19309E140 + (08:06:14, 2 January 2025)
- 05000327/LER-1980-021, Forwards LER 80-021/03L-0 + (08:06:16, 2 January 2025)
- ML19309E137 + (08:06:17, 2 January 2025)
- ML19309E135 + (08:06:18, 2 January 2025)
- ML19309E133 + (08:06:20, 2 January 2025)
- ML19309E132 + (08:06:21, 2 January 2025)
- ML19309E128 + (08:06:23, 2 January 2025)
- ML19309E126 + (08:06:24, 2 January 2025)
- ML19309E124 + (08:06:25, 2 January 2025)
- ML19309E122 + (08:06:26, 2 January 2025)
- ML19309E123 + (08:06:26, 2 January 2025)
- 05000271/LER-1980-013-03, /03L-0:on 800326,while Performing Surveillance Test on Hpci,Turbine Speed Would Not Increase Above 800 Rpm. Caused by Failure of Flow Controller.Flow Controller Was Replaced + (08:06:28, 2 January 2025)
- 05000271/LER-1980-013, Forwards LER 80-013/03L-0 + (08:06:36, 2 January 2025)
- 05000327/LER-1980-017-03, /03L-0:on 800310,while in Mode 6,turbine Bldg Sump Monitor O-RM-90-212 Alarm Kept Coming In.Monitor Was Declared Inoperable.Caused by Malfunctioning Flow Switch Not Allowing Sufficient Flow Through Monitor + (08:06:40, 2 January 2025)
- ML19309E113 + (08:06:42, 2 January 2025)
- 05000336/LER-1980-011-03, /03L-0:on 800313,following Full Power Plant Trip, Two Broken Saddle Clamp Bolts Were Found on Hydraulic Snubber Hanger 490008 on Ms Lead to HP Turbine.Caused by Fatigue Cracking Due to High Vibration & Shear on Trips + (08:06:43, 2 January 2025)
- ML19309E111 + (08:06:45, 2 January 2025)
- ML19309E110 + (08:06:46, 2 January 2025)
- 05000327/LER-1980-017, Forwards LER 80-017/03L-0 + (08:06:47, 2 January 2025)
- 05000336/LER-1980-011, Forwards LER 80-011/03L-0 + (08:06:49, 2 January 2025)
- ML19309E104 + (08:06:51, 2 January 2025)
- ML19309E103 + (08:06:52, 2 January 2025)
- ML19309E101 + (08:06:53, 2 January 2025)
- 05000306/LER-1980-011-03, /03L-0:on 800312,motor Breaker of Charging Pump 22 Would Not Stay Closed.Pump Stopped.Caused by Failed Tfk Breaker.Breaker Replaced + (08:06:54, 2 January 2025)
- ML19309E099 + (08:06:56, 2 January 2025)
- ML19309E098 + (08:06:57, 2 January 2025)
- ML19309E095 + (08:06:58, 2 January 2025)
- 05000306/LER-1980-011, Forwards LER 80-011/03L-0 + (08:06:59, 2 January 2025)
- ML19309E091 + (08:07:01, 2 January 2025)
- ML19309E092 + (08:07:01, 2 January 2025)
- ML19309E090 + (08:07:03, 2 January 2025)
- ML19309E088 + (08:07:03, 2 January 2025)
- ML19309E086 + (08:07:04, 2 January 2025)
- ML19309E084 + (08:07:05, 2 January 2025)
- ML19309E082 + (08:07:06, 2 January 2025)
- ML19309E080 + (08:07:07, 2 January 2025)
- ML19309E079 + (08:07:08, 2 January 2025)
- ML19309E078 + (08:07:09, 2 January 2025)
- ML19309E074 + (08:07:10, 2 January 2025)
- ML19309E076 + (08:07:10, 2 January 2025)
- ML19309E073 + (08:07:11, 2 January 2025)
- ML19309E072 + (08:07:12, 2 January 2025)
- ML19309E071 + (08:07:12, 2 January 2025)
- ML19309E070 + (08:07:17, 2 January 2025)
- ML19309E069 + (08:07:17, 2 January 2025)
- ML19309E068 + (08:07:19, 2 January 2025)
- ML19309E066 + (08:07:20, 2 January 2025)
- ML19309E065 + (08:07:21, 2 January 2025)