Forwards IE Insp Rept 70-1257/80-02 on 800129-31 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790)
ML19309E137
Person / Time
Site: Framatome ANP Richland
Issue date: 03/19/1980
From: Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Nilson R
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
NUDOCS 8004180443
Download: ML19309E137 (2)


Text

,

[panc, c

o UNITED STATES 8\\-

'g NUCLEAR REGULATORY COMMISSION

,y nj REGION V 0,

g 1990 N. CALIFORNIA BOULEVARD

,e SUITE 202, WALNUT CREEK PLAZA WALNUT CR E E K, CAllFORNI A 94596 UAT: 13 1930 Docket No. 70-1257 Erxon Nuclear Company 2101 Horn Rapids Road Richland, Washington 99351 Attention:

Dr. Roy Nilson, Manager Quality Assurance and Licensing Department Gentlemen:

Subject:

NRC Inspection This letter refers to the inspection of your activities authorized under NRC License No. SNM-1227 conducted by Messrs. L. W. Ivey and W. P. Mortensen of this office on January 29-31, 1980.

It also refers to the discussion of our inspection findings held by the inspectors with Mr. R. Nilson and members of his staff on January 31, 1980.

The inspection included examination of activities related to physical protection against industrial sabotage and against theft of special nuclear material in accordance with applicable requirements of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials," your security plan, and license conditions pertaining to physical protecticn as described in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and records, interviews with personnel and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities was not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.

The item of noncompliance is categorized into the level as described in our correspondence to you dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within 20 days of your receipt of this notice, a written statement of explanation 8 004180 fh

MA?. le 1930 Exxon Nuclear Company in reply, including:

(1) steps which have been or will be taken by you to correct the violation, and the results achieved; (2) steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility security procedures are exempt from disclosure; therefore, the enclosure to this letter, the inspection report, and your response to the item listed in the enclosure to this letter will not be placed in the Public Document Room and will receive limited distribution.

Should you heve any questions concerning this letter, we will be glad to discuss ther. with you.

f Sincerely, l

l l/ f /

$ ] V' /,

l 7l'LdR9R.Nrderhaug, Chief /.

Safeguards Branch e

Enclosures:

/',.

L i

Appendix A - Nctice of Violation IE Inspection Report No. 70-1257/80-02(IE-V-362) cc w/ enclosures:

R. Purcell, Manager Auxiliary Operations 9