TOLEDO EDISON Docket No. 50-346 Rcrano P. caouse License No. NPF-3
(*]j" Serial No. 607 April 11, 1980 Director of Nuclear Reactor Regulation Attention:
Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Connission Washington, D. C.
20555
Dear Mr. Reid:
On December 22, 1979 Toledo Edison requested a revision to License Condition 2C(3)h that would delay the completion schedule of current fire protection modifications at the Davis-Besse Nuclear Power Station, Unit i from April 22, 1980 until September 30, 1980. This delay was based on revised estimates of work scopes and manpower limitations to support these modifications.
To aid in your evaluation of this request we have attached a description of the work currently projected to be complete on April 22, 1980. The listing is cross-referenced to Table 1 of the " Fire Protection Safety Evaluation Report" with Amendment No. 18 to Facility Operating License No. NPF-3 for Davis-Besse Unit 1 issued July 26, 1979 (Log No. 409).
It is Toledo Edison's intention, based on approval of the requested delay, to complete all fire protection modifications work required in areas normally inaccessible during power operation during the present refueling / maintenance outage.
This would then allow Davis-Besse Unit 1 to return to operation while the remaining work is being completed.
This information will be updated as revised. As always, we are available to discuss any questions you may have.
Very trul yours, o
RPC:TJM: cts Attachment 004 s
i i
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8004180h
Docket No. 50-346 License No. NPF-3 Serial No. 607 April 11, 1980 Davis-Besse Nuclear Power Station Unit 1 Fire Protection System Modifications Scheduled for Completion By April 22, 1980 (NOTE: Item numbers are consistent with Table 1 of the DB-1 " Fire Protection System Safety Evaluation Report: Issuad July 26, 1979).
The following items are or will be 100 percent complete and in-service by April 22, 1980:
Section A 1.
Service water pump and valve room fire protection system modifications.
3.
Procedures on Fire Fighting Procedures (preplans).
Section B 1.
Fire extinguishers - all identified locations 2.
Sprinkler systems in the following areas:
Corridor (Room 209)
- I Service Water Pump and Valve Room (Latake structure)
Clean Waste Receiver Tank Room (Room 124) 3.
Not complete
+
4.
Concrete Curbing - all identified locations 5.
Hose Stations - one additional hose station at each of the following locations:
Latake structure 6.
Not complete 7.
Fire Doors a) three hour fire rated door assemblies in the following openings:
Door opening in the southwest corner of the ECCS Ptunp Room (Room 115)
HVAC openings in Room 516 I
b) replace door assemblies with UL listed fire rated door assemblies rated for t
lh hours.
Door 503 in the Control Room Complex 8.
Fire Rated Dampers
(
Install UL listed, hour fire rated door type dampers La the following floor slab l
duct penetrations I
l Penetration room 402 to the radwaste fuel handling area air supply equipment area, Room 500 at the 623' elevation floor slab.
Docket No. 50-346 License No. NPF-3 Serial No. 607 April 11, 1980 Page Two 9.
Not ccmplete 10.
Not complete
- 11. Not complete 12.
Emergency Lighting Install 8-hour emergency battery pack lights in the following rooms:
ECCS Pump Room (Room 105)
ECCS Pump Room (Room 115)
Decay Heat Cooler Room (Room 113)
Pipe Tunnel (Room 101)
Auxiliary Feed Pump Unit Room (Room 238)
Boric Acid Evaporator Room (Room 234)
Boric Acid Evaporator Room (Room 235)
Waste Gas Compressor Room (Room 243)
Demineralizer Filter Room (Room 230)
No. 1 Mechanical Penetration Room (Room 208)
Corridor (Room 209)
Monitor Tank Transfer Pump Room (Room 203)
Filter Room (Room 204)
Clean Liquid Waste Monitor Tank Room (Room 201)
Clean Liquid Waste Monitor Tank Room (Room 202)
Valve Room (Room 212)
Valve Room (Room 211)
Lube Oil Storage Tank Room (Room 249)
Corridor (Room 304)
Passage (Room 322)
Component Cooling Water Heat Exchangers & Pump Room (Room 328)
Passage and Hatch Area (Rooms 310)
No. 2 Electrical Penetration Room (Room 427)
Corridor (Room 404)
Storage (Room 405)
Hot Instrument Shop (Room 406)
Low Voltage Switchgear Room (Room 428)
Low Voltage Switchgear Room (Room 429)
Fuel Handling Exhaust Unit Room (Room 401)
Battery Room A (Room 429B)
No. 2 Electrical Isolation Room (Room 429A)
Purge Exhaust Equipment Room (Room 515)
Radwaste Exhaust Equipment & Main Station Exhaust Fan Room (Room 501)
Air Supply Equipment, Radwaste' Fuel Handling Areas (Room 500)
No. 1 Main Steam Line Area (Room 601)
No. 2 Main Steam Line Area (Room 602)
Purge Inlet Equipment Room (Room 600) 13.
Not complete 15.
Not complete
-