Forwards Info Re Seismic re-evaluation Requested by NRC During 790516 Meeting.Previous Seismological Determination of DBE Unaffected
ML19309E066
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/07/1980
From: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
Shared Package
ML19309E067 List:
References
TASK-03-06, TASK-3-6, TASK-RR NUDOCS 8004180346
Download: ML19309E066 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _

s*

CONNECTICUT YANKEE ATOMIC POWER COMPANY BERLIN, CO N N ECTIC U T P. O. BOX 270 H ARTFORD. CONN A.CTICUT 06101 T at s enoess 203 666-6911 April 7, 1980 Docket No. 50-213 Director of Nuclear Reactor Regulation Attn:

Mr. D. L. Ziemann, Chief Operating Reactors Branch #2 U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Reference:

(1)

W. G. Counsil letter to D. L. Ziemann dated January 17, 1980.

Gentlemen:

Haddam Neck Plant Systematic Evaluation Program (SEP)

Seismic Reevaluation During a meeting between the NRC Staff and Connecticut Yankee Atomic Power Company (CYAPCO) on May 16, 1979, the Staff raised questions regarding recent developments in the available information concerning the regional geology /

seismology in r,he Moodus vicinity.

In Reference (1), CYAPCO identified that an extensive research effort was in progress to respond to these concerns. CYAPCO's consultant, Weston Geophysical Corporation, has prepared the attached summary of its investigations. This summary is divided into three sections: Geology, Stress, and Seismology. This report addressed all of the Staff's requests with the exception of gravity data for the site area. This data was recently acquired and is currenting being processed.

It is our current intention to docket the requested gravity information at a later date.

The pertinent conclusion from this investigation is that previous seismological determinations of the design basis earthquake for the Haddam Neck Plant are unaffected. No Pleistocene movements can be demonstrated in the Haddam site area, and no evidence of capable faults exists.

L4 8004180

..J

. We trust you find the attached information demonstrative of this conclusion.

Very truly yours, CONNECTICUT YANKEE A'IOMIC POWER COMPANY f.

b.

W. G. CounYil Vice President e