Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19316A780 + (05:24:20, 2 January 2025)
- ML19316A777 + (05:24:22, 2 January 2025)
- ML19316A778 + (05:24:22, 2 January 2025)
- ML19316A776 + (05:24:23, 2 January 2025)
- 05000254/LER-1980-013-03, /03L-0:on 800415,while Performing High,Low & low-low Reactor Water Level Functional Test,Procedure Qis 10-1,reactor Water Level Switch LIS-1-263-57A Was Found to Trip Below Tech Spec Limit.Caused by Instrument Drift + (05:24:27, 2 January 2025)
- 05000348/LER-1980-028-03, /03L-0:on 800424,during Test Start,Diesel Generator 1B Started W/O Output Voltage Indication,Tripping Generator on Overspeed.Caused by Two Blown Fuses.Fuses Replaced & Generator Returned to Svc + (05:24:29, 2 January 2025)
- ML19316A772 + (05:24:31, 2 January 2025)
- 05000254/LER-1980-013, Forwards LER 80-013/03L-0 + (05:24:32, 2 January 2025)
- ML19316A769 + (05:24:37, 2 January 2025)
- 05000348/LER-1980-028, Forwards LER 80-028/03L-0 + (05:24:38, 2 January 2025)
- ML19316A765 + (05:24:43, 2 January 2025)
- ML19316A763 + (05:24:44, 2 January 2025)
- IR 05000206/2019003 + (05:24:53, 2 January 2025)
- ML19316A761 + (05:24:53, 2 January 2025)
- ML19316A760 + (05:24:55, 2 January 2025)
- ML19316A759 + (05:24:56, 2 January 2025)
- ML19316A758 + (05:24:57, 2 January 2025)
- IR 05000334/1979175 + (05:25:05, 2 January 2025)
- ML19316A756 + (05:25:09, 2 January 2025)
- ML19316A755 + (05:25:11, 2 January 2025)
- 05000368/LER-1980-022, Forwards LER 80-022/03L-0 + (05:25:15, 2 January 2025)
- ML19316A750 + (05:25:19, 2 January 2025)
- 05000254/LER-1980-014-03, /03L-0: on 800415,while Performing High Drywell Pressure Calibr & Functional Test,Procedure QIS-6,pressure Switch PS-1-1001-88A Was Found to Trip Above Allowable Limits.Caused by Instrument Setpoint Drift.Switch Recalibr + (05:25:24, 2 January 2025)
- 05000254/LER-1980-014, Forwards LER 80-014/03L-0 + (05:25:28, 2 January 2025)
- ML19316A746 + (05:25:32, 2 January 2025)
- RS-19-108, Fifth Inservice Inspection Interval Relief Request 15R-04, Revision 2 + (05:25:36, 2 January 2025)
- ML19316A744 + (05:25:40, 2 January 2025)
- 05000368/LER-1980-024-03, /03L-0:on 800408,while Performing Testing on Plant Protection Sys,A Spray Pump Started & a Containment Spray Header Isolation Valve Opened,Spraying Boric Acid Solution Into Reactor Bldg.Caused by Low Voltage Condition + (05:25:41, 2 January 2025)
- ML19316A740 + (05:25:43, 2 January 2025)
- ML19316A738 + (05:25:44, 2 January 2025)
- 05000368/LER-1980-024, Forwards LER 80-024/03L-0 + (05:25:45, 2 January 2025)
- ML19316A732 + (05:25:50, 2 January 2025)
- ML19316A730 + (05:25:52, 2 January 2025)
- ML19316A729 + (05:25:53, 2 January 2025)
- ML19316A728 + (05:25:54, 2 January 2025)
- ML19316A726 + (05:25:55, 2 January 2025)
- ML19316A724 + (05:25:56, 2 January 2025)
- ML19316A723 + (05:25:57, 2 January 2025)
- ML19316A722 + (05:25:58, 2 January 2025)
- ML19316A720 + (05:25:59, 2 January 2025)
- ML19316A718 + (05:26:03, 2 January 2025)
- ML19316A715 + (05:26:04, 2 January 2025)
- ML19316A717 + (05:26:04, 2 January 2025)
- ML19316A713 + (05:26:05, 2 January 2025)
- ML19316A712 + (05:26:08, 2 January 2025)
- ML19316A711 + (05:26:08, 2 January 2025)
- ML19316A710 + (05:26:09, 2 January 2025)
- ML19316A709 + (05:26:10, 2 January 2025)
- ML19316A708 + (05:26:13, 2 January 2025)
- ML19316A706 + (05:26:16, 2 January 2025)
- ML19316A705 + (05:26:17, 2 January 2025)