Text
e i
4 800seso 7 & T f HiRIBU7iC A Gentral Filey, PSB READING MAR ?.51980 FIM0RAfiDUM FOR:
G. Lainas, Chief, Plant Systems Branch, DOR T11RU:
E. Adensam Section Leader 8, Plant Systems Branch, 00R FROM:
S. MacKay, Section B, Plant Systems Branch, DOR
SUBJECT:
WATER HAf0ER EVEflTS Enclosed is a brief description of water hadiner events that have occurrad since June 8, 1979. No attempt has been made to differentiate these events with respect to licensee, type of water hamer, systems effected, consequences or any other parameter. We will continue to monitor these l
events in this manner and periodically classify them in the format given in table 3.2 in NUREG-0582 (copy attached).
If a steam generator water hammer occurs in the future, we will myiew l
the event in detail and determine whether additional correctim measures are needed.
i
\\S S. MacKay Section B Plant Systems Branch Division of Operating Reactors
Enclosure:
As stated l
cc w/enclosum:
D. Eisenhut W. Gamill j
S. Hanauer E. Adensam i
S. Colmar
~
- 5. NacKay
'4~:
/
DOR h DGhifAMSL SMa % 5s'a'h EAke'dsam
.u S /2.f/80 3_fp.g80
ENCLOSURE WATER HAMMER EVENTS REPORTED SINCE SEPTEMBER 1978 PLANT EVENT DATE REPORTED REMARKS Zion 1 9/14/78 Ltr to R-III 12/11/78; Steam Generator Water Hammer LER 50-295/78-95 occurred 12 min. after reactor trip resulting in no damage but false AP causing Safety Injection.
Zion 1 12/5/78 Ltr to R-III 1/22/79; Main F.W. Reg. valve " snapped" LER 50-295/78-130 open after 40% demand = near zero open;45% demand = snapped open to i
' Rancho Seco 12/15/78 Ltr to R-V 1/3/79 Suction valve opening in "B" decay heat system after pump start.
Oyster Creek 1/15/79 Operations Summary 1/79.
W3terhamer occurred while valving in cleanup system.
Zion 1 3/16/79 LER 50-295/79-19 Waterhamer in SG 1C feedwater line.
No structural damage.
Some valves failed to close.
Safety injection occurred.
Sol e-noid valve replaced, valve operator repaired.
Robinson 2 5/8/79 Ltr to R-il 5/22/79; On the cold leg SI line, six of 10 LER 50-261/79-12.
supports on 130' pipe run failed.
Replaced with stronger supports.
San Onofre 1 5/14/79 Ltr 7/3/79 to D.L.
F.W. flow was interrupted after Ziemann; ltr 7/3/79 unit trip because FW valve went to to R-V; LER 50-206/
full closed instead of 5% open as 79-9 intended.
Reg. valve control circuit was reset. One snubber was damaged (sheared lock nut).
It was repaired.
Zion 1 6/8/79 Ltr to R-III 7/30/79; Steam generator water hammer and LER 50-295/79-44 dtd manual safety injection signal (60 7/30/79 sec).
Steam generator ID low level and feed flow mismatch due to feedpump trip.
Rancho Seco Ltr to V. Stello dtd When F.W. cleanup was reduced, the 7/27/79, re Feedwater FW line downstream of control valve Piping was subjected to condenser vacuum.
Cleanup line was moved upstream of Reg. valve.
s
. PLANT EVENT DATE REPORTED REMARKS Salem 1 9/7/79 Ltr to R-I 9/20/79; S.I. system and CVC system 3 LER 50-272/79-57 hangers found broken.cause under investigation.
Quad Cities 1 9/21/79 9/25/79, Resident Insp. Water hammer on moisture separator Daily Report drain tank cracked a weld.
P.
Repaired weld.
Duane Arnold 9/27/79 Ltr to R-III 10/19/79; Apparently a water hammer in the LER 50-331/79-025 RHR caused damage to seismic restraints and. pipe hanger.
Radio-graphy of RHR to fuel pool line a and investigation in progress.
Dresden 3 10/5/79 LER 50-249/79-28 Damaged supports for LPCI drywell spray header.
Repaired and ECCS Jockey Pump system installed.
Brunswick 1 12/12/79 LER 50-325/79-107 Safety-Relief Valve operation with a water slug damaged valve and exhaust header.
La Salle 1/25/80 PNO III-80-19 Accidental closing of a valve in the cooling lake blowdown line caused a rupture 16x40 feet.
Browns Ferry 2 R-II Daily Report Cracks found in the bearing 2/21/80 support pedestals of the HPCI turbine were probably caused by water slugs in the HPCI steam supply line.,
TABLE 3.2 OTHER WATER HAMMER EVENTS Reactor Commercial Event Water Hanmer Type System Plant Type Operation Date Damage Pump Startup w/ inadvertently RilR Duane Arnold BWR 02/01/75 04/06/77 Yes V:ided Discharge Lines RHR llatch 1 BWR 12/31/75 12/15/74 Yes RHR Quad Cities 1 BWR 02/18/73 04/04/72 Yes RHR Brunswick 1 BWR 03/18/77 11/09/77 Yes RilR Brunswick 2 BWR 11/03/75 09/05/75 Yes RHR Brunswick 2 BWR 11/03/75 09/30/75 Yes RHR Fitzpatrick BWR 07/28/75 03/21/75 Yes RiiR fitzpatrick BWR 07/28/75 05/24/75 Yes RHR Brunswick 2 BWR 11/03/75 09/30/75 No Core Spray Dresden 2 BWR 06/09/72 03/29/71 Yes Core Spray Dresden 2 BWR 06/09/72 07/11/76 Yes Core Spray Dresden 3 BWR 11/16/71 11/27/74 Yes Core Spray Duane Arnold BWR 02/01/75 04/10/74 Yes Core Spray Duane Arnold BWR 02/01/75 02/11/77 Yes Core Spray Oyster Creek BWR 12/69 05/25/71 Yes SSI Discharge San Onofre 1 PWR 11/01/68 10/20/73 Yes Line
,3, HPCI Brunswick 2 BWR 11/03/75 03/24/78 Emergency Brown Ferry 1,2,3 BWR 08/01/74 Equipment 03/01/75 Cooling Water 03/01/77 RilR Service Fitzpatrick BWR 07/28/75 04/10/74 Yes Water Service Water Salem 1 PWR 06/30/77 1977 Main FW Oconee 3 PWR 12/16/74 Yes LPSI Palisades 1 PWR 12/31/71 05/14/74 Yes Expected Transients in Main Steam Robinson PWR 03/07/71 04/70 Yes Initially Empty Lines Safety Valve Press. Relief Surry 1 PWR 12/22/72 01/73 Yes Valve Dischasge line
y-
. Jc3
.~
TABLE 3.2 01HER WATER HAMMER EVENTS (Cont'd)
Reactor Commercial Event Water Hammer Type System Plant Type Operation Date Damage Valve Opening, Closing and Main Steam Arkansas 1 PWR 12/19/74 06/15/76 Yes Yes Instability Main Steam Millstone 1 BWR 03/71 Main Steam Oconee 1 PWR 07/15/73 03/21/75 No Yes Main Steam Oconee 2 PWR 09/09/74 Main Steam Turkey Point 3 PWR 12/14/72 11/05/75 Yes Main Steam Millstone 1 BWR 03/71 12/28/70 Yes Main Steam San Onofre i PWR 01/01/68 01/14/74 Yes Main Steam Oyster Creek i BWR 12/69 1971 Yes Main Steam Dresden 2 BWR 06/09/72 09/28/71 Main Steam Pilgrim 1 BWR 12/72 07/24/72 Yes Main FW Beaver Valley 1 PWR 10/01/76 12/27/76 Yes Main FW Beaver Valley 1 PWR 10/01/76 11/05/76 Yes Main FW Beaver Valley 1 PWR 10/01/76 01/05/77 Yes Main FW Quad Cities 2 BWR 03/10/73 06/10/74 Yes Main FW Quad Cities 2 BWR 03/10/73 08/12/75 Yes u
Main FW Quad Cities 2 BWR 03/10/73 08/31/75 Yes 7"
No Main FW Turkey Point 3 PWR 12/14/72 No Main FW Turkey Point 4 PWR 09/07/73 Main FW Pilgrim 1 BWR 12/72 01/06/76 Yes Main FW Dresden 2 BWR 06/09/72 12/05/74 Yes Main FW Dresden 2 BWR 06/09/72 02/18/76 Yes Main FW Quad Cities 2 BWR 03/10/73 10/17/75 Yes Main FW Dresden 3 BWR 11/16/71 06/23/74 Yes Main FW Dresden 3 BWR 11/16/71 09/04/74 Yes No Main FW Oconee i PWR 07/15/73 Yes Main FW Oconee 2 PWR 09/09/74 Yes l
Main FW Oconee 3 PWR 12/16/74 Main FW Ginna PWR 07/70 07/22/73 Yes Main FW Millstone 1 BWR 03/11 12/26/74 Yes Main FW Zion 1 PWR 12/31/73 06/20//6 No Main FW Zion 2 PWR 09/17/74 03/18/75 Yes CVCS Maine Yankee PWR 12/28/72 06/02/77 No
TABLE 3.2 OTHER WATER HAMMER EVENTS (Cont'd)
Reactor Commercial Event Water Hamer Type System Plant Type Operation Date Damage Check Valve Closure and Main Steam Surry 1 PWR 12/22/72 10/05/73 Yes Delayed Opening Main Steam Surry 2 PWR 05/01/73 12/02/72 Yes Main Steam Point Beach 2 PWR 10/01 04/08/73 Yes Cooling Calvert Cliffs 1 PWR 05/08/75 04/25/77 Yes System for Reactor Auxiliaries Main Steam Maine Yankee PWR 12/28/72 12/02/72 No Recirculation Surry 1 PWR 12/22/72 11/29/74 Yes Spray Containment Surry 1 PWR 12/22/72 12/27/74 Yes Spray Recirculation Surry 2 PWR 05/01/73 12/27/74 Yes n
- ~
and 4
Containment Spray Core Spray Millstone 1 03/71 04/17/78 Yes Water Entrainmer.1 in Steam HPCI Browns Ferry 1 BWR 08/01/74 10/14/72 Yes Lines HPCI Browns Ferry 1 BWR 08/01/74 04/14/74 Yes HPCI Brunswick 2 BWR 11/03/75 08/30/76
. Yes HPCI Duane Arnold BWR 12/01/75 06/11/74 Yes HPCI Fitzpatrick BWR 07/28/75 07/20/75 Yes HPCI Fitzpatrick BWR 07/28/75 07/28/75 Yes HPCI Dresden 2 BWR 06/09/72 05/28/70 Yes RCIC Browns Ferry 1 PWR 08/01/74 10/14/72 Yes Yes Aux. FW Palisades PWR 12/31/71 Turbine Aux. FW Zion 1 PWR 12/31/73 06/16/74 Yes Turbine Isolation Millstone 1 BWR 03/71 03/11/78 Yes Condenser
- -....-. ~... - - - - -.....
TABLE 3.2 OTHER WATER HAMMER EVENTS (Cont'd) 3 Reactor Commercial Event Water Hammer Type System Plant Type Operation Date Damage Steam Bubble Collapse and Plant Steam Big Rock Point 1 BWR 03/29/63 10/31/77 No Mixing of Subcooled Water Steam Heating from Inter-connected systems System HPCI Monticello BWR 06/30/71 1972 Yes No Main FW Oconee 1 BWR 07/15/73 RHR Brunswick i BWR 03/18/77 03/18/77 Yes RHR Brunswick 2 BWR 11/03/75 12/29/76 Yes RHR Dresden 2 BWR 06/09/72 09/28/71 Yes Yes RHR Monticello BWR 06/30/71 SIS Surry 1 PWR 12/22/72 11/20/74 Yes Accumulator SIS Surry 2 PWR 05/01/73 1974 Yes Accumulator RHR Brunswick 2 BWR 11/03/75 04/18/77 Yes y
HPCI Brunswick 1 BWR 03/18/77 05/20/77 Yes 7
Main FW Zion 1 PWR 12/31/73 12/31/73 No e'
Main FW Rancho Seco PWR 04/17/75 1974 Yes Steam Haddam Neck 1*
PWR 01/01/6 03/17/78 Yes Generator Blowdown Line Pump Startup HPCI Browns Ferry 3 BWR 03/01/77 01/18/77 Yes RHR Pilgrim 1 BWR 12/72 10/17/75 Yes Yes Not Identified Steam Indian Point 2 BWR 08/73 Generator Blowdown Line RHR steam line Brunswick I BWR 03/18/77 12/20/77 Yes
--