ML19316A726

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-0036/80-01 on 800226-28.No Noncompliance Noted
ML19316A726
Person / Time
Site: 07000036
Issue date: 04/16/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Lichtenberger H
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML19316A727 List:
References
NUDOCS 8005270417
Download: ML19316A726 (2)


Text

l

[

'o UNITED STATES l

[',g:g/'

NUCLEAR REGULATORY COMMISSION MSlC ly n

/.r REGION lli o,

f 799 ROOSEVELT ROAD

% *'.b'.../

GLEN ELLYN,lLLINolS 60137 APR 161980 Docket No. 70-36 Combustion Engineering, Inc.

ATTN:

Mr. H. V. Lichtenberger

~

Vice President - Manufacturing Nuclear Power Systems Windsor, CT 06095 Gentlemen:

This refers to the inspection conducted by Mr. C. C. Peck of this office on February 26-28, 1980, of activities at Hematite, M0 authorized by NRC Special Nuclear Material T,icense No. SNM-33 and to the discussion of our findings with Mr. J. A. L de and other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, obser-vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors believe to be proprietary, you must apply in writing to this office, within twenty days of your receirt of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the information is con-sidered proprietary, and should be prepared so that proprietary informa-tion identified in the application is contained in an enclosure to the application.

t B 0052 70

5 2-APR 161980 Combustion Engineering, Inc.

8 We will gladly discuss any questions you have concerning this inspection.

Sincerely, i

ON A. B. Davis, Chief Fuel Facility and Materials Safety Branch

Enclosure:

IE Inspection Report No. 70-036/80-01 cc w/ encl:

Mr. J. A. Rode, Plant Manager Central Files Reproduction Unit NRC 20b PDR NSIC

-l 4

I 4

,h k

t' 1

l 1

4 g,

%qq e

.=**"s**e-p%.**

9},

s.k. *

=

' - = -

e a