Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19318A386 + (02:02:55, 2 January 2025)
- ML19318A385 + (02:02:56, 2 January 2025)
- A01043, Responds to Open Items Noted in NRC Re Requirements for Auxiliary Feedwater Sys.Each Feedwater Train Will Have Two Operators Verifying Proper Valve Alignment.New Level Instrumentation Sys Installed by 810101 + (02:02:57, 2 January 2025)
- ML19318A382 + (02:03:02, 2 January 2025)
- ML19318A381 + (02:03:03, 2 January 2025)
- ML19318A380 + (02:03:04, 2 January 2025)
- AECM-80-131, Outlines Recent Organizational Changes.Title of Director of Power Production Changed to Assistant Vice President,Nuclear Production.Production Engineering Section Renamed Nuclear Plant Engineering Section.Notification Per QA Manual + (02:03:05, 2 January 2025)
- ML19318A378 + (02:03:07, 2 January 2025)
- ML19318A375 + (02:03:08, 2 January 2025)
- ML19318A377 + (02:03:08, 2 January 2025)
- ML19318A374 + (02:03:10, 2 January 2025)
- ML19318A373 + (02:03:11, 2 January 2025)
- ML19318A372 + (02:03:12, 2 January 2025)
- ML19318A369 + (02:03:15, 2 January 2025)
- 05000368/LER-1980-030, Forwards LER 80-030/03L-0 + (02:03:16, 2 January 2025)
- ML19318A366 + (02:03:17, 2 January 2025)
- ML19318A365 + (02:03:18, 2 January 2025)
- ML19318A364 + (02:03:20, 2 January 2025)
- ML19318A363 + (02:03:21, 2 January 2025)
- ML19318A361 + (02:03:23, 2 January 2025)
- ML19318A360 + (02:03:24, 2 January 2025)
- ML19318A359 + (02:03:35, 2 January 2025)
- ML19318A358 + (02:03:36, 2 January 2025)
- ML19318A357 + (02:03:38, 2 January 2025)
- ML19318A355 + (02:03:41, 2 January 2025)
- ML19318A353 + (02:03:42, 2 January 2025)
- ML19318A352 + (02:03:43, 2 January 2025)
- ML19318A351 + (02:03:43, 2 January 2025)
- ML19318A349 + (02:03:45, 2 January 2025)
- ML19318A345 + (02:03:46, 2 January 2025)
- ML19318A346 + (02:03:46, 2 January 2025)
- ML19318A344 + (02:03:48, 2 January 2025)
- ML19318A342 + (02:03:49, 2 January 2025)
- 05000302/LER-1980-023-03, /03L-0:on 800517,radioactive Matl in Form of Bagged Contaminated Waste & Poly Wrapped Scrap Lumber Was Taken to Site Dump.Caused by Apparent Communication Problem Between Health Physics Personnel & Bldg Servicemen + (02:03:50, 2 January 2025)
- B10015, Forwards Large Break Loca/Eccs Performance Results. Analysis Showed double-ended Cold Leg Guillotine Break at Pump Discharge to Be Limiting Large Break.Review of Results Determined That Applicable Fee Was Submitted 800509 + (02:03:51, 2 January 2025)
- 05000302/LER-1980-023, Forwards LER 80-023/03L-0 + (02:03:53, 2 January 2025)
- ML19318A336 + (02:03:54, 2 January 2025)
- ML19318A334 + (02:03:55, 2 January 2025)
- ML19318A333 + (02:03:57, 2 January 2025)
- ML19318A332 + (02:03:58, 2 January 2025)
- ML19318A330 + (02:03:59, 2 January 2025)
- ML19318A329 + (02:04:00, 2 January 2025)
- ML19318A326 + (02:04:01, 2 January 2025)
- ML19318A324 + (02:04:02, 2 January 2025)
- ML19318A322 + (02:04:03, 2 January 2025)
- ML19318A321 + (02:04:04, 2 January 2025)
- IR 05000445/1980012 + (02:04:05, 2 January 2025)
- ML19318A319 + (02:04:07, 2 January 2025)
- ML19318A318 + (02:04:08, 2 January 2025)
- ML19318A316 + (02:04:09, 2 January 2025)
- ML19318A315 + (02:04:10, 2 January 2025)