i
+
w/
OPER AllNC DATA REPORT DOCKET.NO. 50-312 DdE _80-05-31 COS!PLETED I;Y R. C. Colombo TELEPil0NE 916-452-3211 OPERATING ST \\TI'S
- 1. Unit Name:
Rancho Seco Unit 1 Note $
degan Cycle 4 on
- 2. Reportin; Period:
11ay 1980 May 12 at 0109
- 3. Licensed Thenval Power ts!%t :
2772
- 4. Namephte Ratin; #Grens 3the,.
963
- 5. Desi.;n Electrical Retin; # Net '.! Wet 918
- 6. >!nimum Dependab:e Capacity egress 31We):
N7
- 7. Siuiraum Dependable Cspacity (Net 31Wel:
873
- 8. If Cf.angs 0ccur in Capreity Ratings t_ Items Number 3 Through 7)Since Last Report. Gise Reasons:
N/A
- 9. Power Lese! To hhich Restricted,if Anv (Net 31Wei:
N/A 10.' Reasons For Restrictiors. if Any:
N/A This 3!onth Yr.-to Date Cumulatise
- 11. Ilours In Reporting Period 744 3,647 44,904
- 12. Number Of Hours Reactor Was Critical 523.0 794.0 26,867.5
- 13. Reactor Res:ne Shutdown flours 0
0 3,975.1
- 14. Ilours Generator On-Line 442.7 709.6 25,650.9
- 15. Unit Resene Shutdown liours 0
- 16. Cross Thennal Energy Generated e. lWH) 995,231 0
1,210.2
\\
1,685,051 64,718,749
- 17. Gros 3 Electrical Energ.iGenerated (5th!!
336,024 557,808 21,842,344 IS. Net Electrical Ener;y Gerieratni talk Hi 310,424
'516,867 20,627,756
- 19. Unit Senice Fact.ir 59.5 19.5 57.1
- 20. Unit Asailab!!itt Factor 59.5 19.5 59.8 b
- 21. Unit Cap eitv I aetor iLNin; 3f DC Nerl 47.8 16.2 52.6
- 22. L' nit Cpacit,s Factor (Liing DER Net) 45.5 15.4 50.0
- 23. Unit FonerJ Outap Rate 6.4 9.G 30.2
- 24. ShutJm.n> Seheduled Oser Next ti.\\!onths (Ts pe. Date.and Duration of Eachi:
N/A l
- 25. If Shut Down \\t End Of Repart Peri 5d. litimated ILie of Startup:
- 26. Unit,la Tot StatusiPnor o Gi:emeneel Optrations:
Ferecast Achiesed INITI\\L CRillCA LITy N/A
_ N/A INITI \\l 111 CTRICil y N/A N/A COtititRCI \\ L 0."i R \\ I10N N/J, N/A O
('3/77 )
80 0619 0 M/
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-312 UNIT NAME Rancho Seco No. 1 DATE 80-05-31 M Y 198 COMPLETED tty R. U - Colo-bo REPORT MONTl!
TELEPi!ONE 016-457 111 l
c
!E
.Y Licer:sce Cause & Corrective No.
Date g-3 g, y
,g g $
Event
?g g.3 :
Action to
$E
.s g 5 Report v (E U 5
Prevent Recurrence -
H O'
g O
e a
2 80-05-01 S
265 C
1 N/A N/A N/A 3rd Refueling Outage commenced January 14, 1980 3
80-05-14 S
1.3 B
1 N/A HA.
TURBIN Turbine Trip Testing 4
80-05-29 F
27.4 A
1 N/A HA MOTORX Low EHC oil pre'ssure result 9d in manual shutdown of unit until EHC system repaired.
5 80-05-30 F
7.6 A
3 N/A EB XXXXXX Electrical problem affecting main cire water pumps resulted in loss of condenser vacuum and subsequent tr.ip.
~
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructi'ons S: Scheduled A Equipment Failure (Exphin) 1-Manual for Preparation of Data B Maintenance of Test
- 2. Manual Scram.
Entry Sheets for twensee C Refueling 3 Automatic Scram.
Event Repost (LER) Tite (NUREC-i D Regulatory Restriction 4-O:he:(Explain) 0161) 1:-0;,erator Training & License Examination i
F Ad:nini trative 5
G Operationa' Etrur (Explain)
Exhibit I-Same Sourec (9/77)
Il-Other (E xplain) i
?
~
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-312 UNIT Rnnchn Seen Ibit 1 DATE 80-05-31 R. W. Colombo CO.ilPLETED BY TELEPilONE 916-452-3211 4
- .lONTil May 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE. DAILY POWER LEVEL (SIWE Net) '
g3twe.Neg) 0 825 1
37 846 2
18 3
... ; o-841 838 0
4 20 0
S 21 846 0
884 6
22 0
. 23 839-7 0
121 8
23 0
9 25 017 10 26 0
818 11 27 e
242 817 12 28 13 29 132 268 14 -
30 144 541 739..
I5 3
667 16 1
INSTRUCTIONS On this format.hst the average dail), umt power lesel in.\\1We-Net for each day in the reporting inanth. Compute to the nearest whole negawait,
'~-
. (9/77 )
)
~
t PIFUEL1::G 12.TOPRAT10 ;- REQUEST ancho Seco Unit I 1.
1:ame of Pacility:
July 1981 Scheduled date f or next refueling shutdcen:
2.
September 1981 Schedu)cd date for restart following refueling:
'3.
Technical Specification change or other license anendnent required:
4:
Chan,.e to Rod Index vs. Power Level Curve (TS 3.5.2) a)
Changt td C'o!c Imbalance vs. Pouer Level Curve (TS 3.5.2) b)
c) Tilt Liait. (TS 3'.5.2)
~
d) Safety Equipnent Testing (TS 3.3.3)
May 1981 Schedu)ca dat'c(sf. for subnitting proposed licensing action:
5.
None
- b. Jopertant licensing considerations associated with ref ueling:
7 Ignber of fuel assemblics:
a) In the core:
177 164
~
b) In the Spent Fuel Pool:
579 C.
Present licensed spent' fuel capacity:
frojected date of the last refueling that can be discharged 9.
1987 to the Spent Pucl Poo'1:
e.
O e
h.
o 9
k-P
- - - - - -