r' 1 SMULT

. SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6N)1 S Street, Box 15830, Sacramento, California 95813; (916) 452-3211 J.u.ne - 5, 1980

- RJR 80-256 t

Director (10)

Office of Inspection & Enforce =ent U. S. Nucicar. Regulatory Comnission -

Washington, D. C.

20555 Re: 'Op'erating'Plunt Status Report

Dear Sir:

. Enclosed is the May Operating Plant Status Report For Rancho Seco Unit one.

Respectfully submitted,

~

L Sr Mt. J. Rodrigue Manager, Nuclear Operations jim Encl.

cs: Region V (1)

I Office of Management Information and Program Control (2) j 9

e s

0 p

(

NARRATIVE SU:OtARY OF PLANT OPERATIONS 5-1 to Continued plant shutdown for 3rd refueling outage.

5-9

. 5-9 Began physics testing.

(0025)

Began pulling control rods.

(0510)

Reactor critical.

5-10 (1825)

Reactor at 2.5%.

5-11 (0115)

Rolled turbine off turning gear.

(1525)

Reactor and turbine trip.

(2250)

Reactor critical.

5-12 (0109)

Parallelled turbine / generator to system.

(0215)

Reactor at 30%.

5-13 Reactor at 39%, MWe 4400.

5-14 l

(2127)

_ Manual turbine / generator trip (opened OCB's).

(2242)

Closed OCB's.

5-15 (0130)

Reactor at 40%.

(0330)

Reactor at 46%.

(0530)

Reactor at'52*.f

- (0730)

. Reactor at 58%.

(1004)

Reactor at 67%.

(1720)

Reactor at 75%.

4 n'

j

g g.

' 5-16

~

(1846)

Begin increas ng reactor to 92% at %3% per hour.

5-17

.(1252),

Reactor at 92% and begin increase to 95%.

5-23 (1418)

Reduce reactor to N90%.

5-29 (0326)

B'egin reducing reactor at 10 MW/ hour due to low EHC oil pressure.

(0521)

Open'e d'dCB 's.

(0534)

Manual turbine / generator trip.

5-30 i

(0917)

Closed OCB's and began increasing reactor to 90%.

~

(1412)

Turbine / generator trip.

(1722)

. Reactor critical.

(2314)

Closed OCB's.

5-31 (0304)

Increasing reactor to 95%.

~

MAJOR ITEMS OF SAFETY-RETATED IIAINTENANCE 1.

Replaced angle brace and pipe dummy under support for steam generator blowdown line.

2. -Repaired pressurizer level transmitters.

- 3.

Replaced: control rod drive motor.

4.

Repaired leaking' flow transmitter in RCS.

j 5.

Changed gears on_SFV-25003.

s..

S10DfARY OF CilANGES MADE IN ACCORDANCE "ITH 10 Cr" 50.59(b)

No changes, tests,Jor experiments we're corapleted in May,1980, which constituted

'a changefin a safety analysis report description.

i 3_

PERSONNEL CIIANGES RE0 VIRI!!G REPORTI!!G No personnel changes that require reporting in accordance with Tech Spec Figure 6.9-2 were made in ?!ay,1980.