Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19318B015 + (01:52:06, 2 January 2025)
- ML19318B014 + (01:52:07, 2 January 2025)
- ML19318B011 + (01:52:09, 2 January 2025)
- ML19318B010 + (01:52:10, 2 January 2025)
- ML19318B009 + (01:52:11, 2 January 2025)
- ML19318B008 + (01:52:12, 2 January 2025)
- ML19318B006 + (01:52:13, 2 January 2025)
- 05000366/LER-1980-087-03, /03L-0:on 800528,during Surveillance Procedure HNP-2-3154,reactor Pressure Vessel Level Instrument (LPCI) Ft&C on 2B21-NO31B,Switch 4,had Double Actuation.Caused by Slipped Magnets on Pointer Shaft Due to Corrosion + (01:52:15, 2 January 2025)
- 05000320/LER-1980-022-03, /03Z-0:on 800518,during Recovery Mode Operation, Fuel Handling Bldg Exhaust Flow Discovered Below Limit. Caused by Failure of Universal Coupling on Manual Inlet Damper for Fans AH-E-10A & B Causing Damper to Close + (01:52:17, 2 January 2025)
- 05000366/LER-1980-087, Forwards LER 80-087/03L-0 + (01:52:19, 2 January 2025)
- 05000320/LER-1980-022, Forwards LER 80-022/03Z-0 + (01:52:21, 2 January 2025)
- ML19318A998 + (01:52:24, 2 January 2025)
- A800031, Advises That Util Intends to Respond to 800507 Request Re TMI-2 Requirements within Schedule.Util Presently Evaluating Alternatives within Framework of GE BWR Owners Group + (01:52:25, 2 January 2025)
- ML19318A996 + (01:52:26, 2 January 2025)
- ML19318A993 + (01:52:28, 2 January 2025)
- ML19318A992 + (01:52:28, 2 January 2025)
- ML19318A991 + (01:52:30, 2 January 2025)
- AECM-80-132, Forwards Revised Response to Notice of Violation from Insp on 800303-06,providing More Detailed & Updated Status of Notice Concerns + (01:52:31, 2 January 2025)
- ML19318A989 + (01:52:34, 2 January 2025)
- ML19318A988 + (01:52:35, 2 January 2025)
- 05000293/LER-1980-020-03, /03L-0:on 800426,during Refueling Outage 4,14 Primary Containment Isolation Valves Found to Have Seat Leakage Over Requirements.Caused by Normal Deterioration of Disc to Seat Mating Surface + (01:52:36, 2 January 2025)
- ML19318A985 + (01:52:38, 2 January 2025)
- ML19318A984 + (01:52:39, 2 January 2025)
- 05000293/LER-1980-020, Forwards LER 80-020/03L-0 + (01:52:40, 2 January 2025)
- ML19318A981 + (01:52:42, 2 January 2025)
- ML19318A979 + (01:52:43, 2 January 2025)
- ML19318A978 + (01:52:44, 2 January 2025)
- A01025, Forwards Info Requested by NRC Re Low Pressure Turbine Discs.Scheduled Insp Program at Facility Will Confirm Absence of Turbine Disc Cracking in Low Pressure Rotors + (01:52:45, 2 January 2025)
- ML19318A976 + (01:52:46, 2 January 2025)
- ML19318A975 + (01:52:47, 2 January 2025)
- 05000366/LER-1980-084-03, /03L-0:on 800521,unit Scrammed While Operating at Steady State.Reactor Core Isolation Cooling Tripped on High Water Level.Sys Maunally Restarted,But Tripped on Mechanical Overspeed Trip + (01:52:48, 2 January 2025)
- ML19318A973 + (01:52:49, 2 January 2025)
- 05000366/LER-1980-088-03, /03L-0:on 800529,while Performing HNP-2-3154, Reactor Pressure Vessel Level Instrument (LPCI) Ft&C, Switch 2 on 2B21-NO31A Failed.Caused by Switch Being Out of Adjustment Due to Loose Screw.Switch Readjusted + (01:52:51, 2 January 2025)
- 05000366/LER-1980-084, Forwards LER 80-084/03L-0 + (01:52:52, 2 January 2025)
- ML19318A968 + (01:52:56, 2 January 2025)
- ML19318A967 + (01:52:58, 2 January 2025)
- ML19318A964 + (01:53:01, 2 January 2025)
- 05000366/LER-1980-088, Forwards LER 80-088/03L-0 + (01:53:02, 2 January 2025)
- ML19318A961 + (01:53:03, 2 January 2025)
- ML19318A960 + (01:53:04, 2 January 2025)
- 05000366/LER-1980-054-03, /03L-0:on 800524,while Performing Calibr of Both Primary Containment Purge Vacuum Breaker Pressure Switches, 2T48-N211 Found Inoperable.Caused by Personnel Error.Stuck Switch Removed & Repaired.Switch Wiring Corrected + (01:53:06, 2 January 2025)
- ML19318A958 + (01:53:08, 2 January 2025)
- 05000327/LER-1980-070-03, /03L-0:on 800517,during Cooldown from Mode 3, Refueling Water Storage Tank Water Level Fell Below Required Limit.Caused by Failure to Initiate Early Makeup.Makeup Immediately Initiated + (01:53:09, 2 January 2025)
- 05000366/LER-1980-054, Forwards LER 80-054/03L-0 + (01:53:11, 2 January 2025)
- ML19318A953 + (01:53:13, 2 January 2025)
- ML19318A954 + (01:53:13, 2 January 2025)
- 05000302/LER-1980-024-04, /04L-0:on 800523,discovered That I-131 Charcoal Cartridge for Wk Ending 800401 Was Inadvertently Discarded. Caused by Personnel Error.Responsible Personnel Were Instructed on Proper Procedures + (01:53:14, 2 January 2025)
- 05000327/LER-1980-070, Forwards LER 80-070/03L-0 + (01:53:16, 2 January 2025)
- ML19318A949 + (01:53:17, 2 January 2025)
- 05000327/LER-1980-072-03, /03L-0:on 800522,essential Raw Cooling Water Effluent Monitors O-RE-90-134/141 Declared Inoperable.Caused by Spurious High Rad Spikes & High Rad Alarm.Changeout of Relay & Further Investigations Planned + (01:53:18, 2 January 2025)
- ML19318A947 + (01:53:20, 2 January 2025)