Text
. =
. = _ + -
.__.--.c.~.
,N~'
s VruoINrA ELucrHIC AND l'OWHH CO M PANY nicnwons>,vimosa zA coum June 20, 1980 Mr. liarold R. Denton, Director Serial No. 546 Office of Nuclear Reactor Regulation LQA/PRB:rab Attn:
Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Docket Nos. 50-338 Division of Licensing 50-339 U. S. Nuclear Regulatory Commission License Nos. NPF-4 Washington, D.C.
20555 NPF-7
Dear Mr. Denton:
We are submitting additional changes to the North Anna Power Station Emergency. Plan that were discussed with your Mr. J. W. Roe on May 30,1980 in Bethesda, Maryland. They are attached to this letter.
These changes complete our response to the original comments we received from Mr. Roe on May 15, 1980 and should resolve all the outstanding issues involved in the acceptance of the plan.
4 If you have any questions concerning this submittal, please contact Peter Beament at (804) 771-4411, who is ready to assist you.
Very truly yours,
/
//p_
E. A. Baum Executive Manager-Licensing and Quality Assurance Attachments 1.
List of Changes 2.
North Anna Emergency Plan, Revision 2 (10 copies)
~
t 6
I seoe24o 461
~
r-c r
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA EMERGENCY PLiN Changes to the North Anna Emergency Plan are denoted by new page date 6-18-80, and short horizontal line in the right margin showing the actual location of the change.
Section and Page Type of Change
. 4.5 Improved descriptions 4.6 Deleted 4.8 Improved descriptions 4.9 Deleted 4.11 Improved descriptions 4.12 Deleted 4.14 Improved descriptione 4.15 Improved descriptions Table 4.1A through New tables to Table 4.1D follow page 4.15 4.16 Typing reorientation Table.5.la New table to follow Table 5.1 Table 5.2a New table to follow Table 5.2 4
4 k
i
O
NAEP Paga 4.5
]
6-18-80 INITIATING CONDITIONS: NOTIFICATION OF UNUSUAL EVENT 1..
Safety Injection (Emergency Core Cooling) System initiation not caused by
. spurious signal.
2.
- Radiological effluent Technical Specification instantaneous limit exceeded.
3.
Indication of damage to fuel.
4.-
Safety limits of the Technical Specifications have been exceeded.
5.
Unit shutdown required by Technical Specifications.
6.
Failure of a safety or relief valve to close that may affect the health and safety of the public.
7.
Fire in the Protected Area or Switchyard which lasts more than ten (10) minutes.
8.
Security threat, attempted unauthorized entry or attempted sabotage.
9.
Natural phenomenon being experienced or projected beyond usuallevels.
10.
Other hazards being experienced or projected.
- 11.
Transportation of contaminated injured individual from site to off-site hospital.
- 12.
Other station conditions exist that warrant increased awareness on the part of State and/cr Localoff-site authorities.
8 s
3 m
w-