Forwards Info Re GE Turbine Disks in Response to NRC .Stress Corrosion Cracks Have Not Been Observed.Water Erosion Found in Keyways of Wheels Is Being Studied.Erosion Process Should Not Require Replacement of Wheels
ML19318A985
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/20/1980
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NO-80-936, NUDOCS 8006240475
Download: ML19318A985 (14)


Text

'

June 20, 1980 File: NG-3514(B)

SERIAL NO: NO-80-936 Office of Nuclear Reactor Regulation ATTENTION:

Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 3 United States Nuclear Regulatory Commission Washington, D. C.

20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-324 AND 50-325 LICENSE NOS. DPR-71 AND DPR-62 RESPONSE TO REQUEST FOR INFORMATION GE TURBINE DISKS

Dear Mr. Ippolito:

This is in response to your May 16, 1980 letter which requested information related to turbine disks. Carolina Power & Light Company's response to your generic and site-specific questions for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2 is attached.

We trust that this information is satisfactory for your use.

Yours very truly, gfl \\

c4MAq E. E. Utley Executive Vice President 00l Power Supply and 5

Engineering & Construction Ill JAM /jc (882-311) ppd'.

Lh sLS Attachments y, g T

/

v4. l/cail/kel I

I H. %lheR.

I I

Sworn to and subscribed before me this 20th day of June 1980

$1L/2AA/As Notary Public ggsin s t e rsi, My commission expires:

October 4, 1981 g

5 lsoTARy\\

t E

I AusttC !

5 1 \\.

.?

.s P90 gh

[b r

in m iitt"'o 4

9

p.

BFUNSWICK UNITS 1 & ?

SITE SPECIFIC GENERAL QUESTIONS QUESTION 1A TURBINE TYPE

RESPONSE

Brunswick units 1 and 2 utilize an 849MW, GE manufactured, type M7 reheat 1800 RPM-tandem compound turbine consisting of a double flow HP turbine and two double flow LP turbines having 43 inch last stage buckets. Steam in.et conditions to the HP are 950 psig, 540 F with HP exhaust steam passing through MSR's and reheated to 515 F at the LP turbine inlet.

1 P

i n -.

BRUNSWICK UNITS 1 & 2

' QUESTION 1B Number of hours of operation for each LP turbine at time of last turbine. inspection, or if not inspected, postulated to turbine inspection.

RESPONSE.

'The number of operating hours for Brunswick Units 1 and 2 up to 6/80 is as enumerated below:

UNIT OPERATING HOURS BSEP # 1 19,480 BSEP # 2 25,102 The number of' operating hours postulated at the time LP turbine wheels are planned to be ultrasonic inspected is noted below:

1 UNIT OPERATING HOURS INSPECTION DATE BSEP # 1 29,000 Spring, 1982 BSEP # 2 32,600 Fall, 1981 L_.

- = -

BRUNSWICK' UNITS 1 & 2 QUESTION IC Number of turbine trips-and overspeeds.

a

RESPONSE

I The number of trips and overspeeds as of 6/80 is noted belew:

UNIT.

TRIPS-OVERSPEEDS BSEP # 1 75 5

BSEP # 2 98 1

i f

a i

i i

k f'

I I

i i

t a

y 7,--

w.

y pr-y-

--,-s--

.-,.v-.

,m y.y9,-

9

  1. -q isy

,,ee

BRUNSWICK UNITS 1 & 2 QUESTION ID For each turbine disk, please provide the following:

a)

Type of material including material specifications

' b)

Tensile properties data

- c)

Toughness properties data including fracture appearance, transi-tion temperature, and charpy upper. steel energy and temperature.

d)

Keyway _ temperatures e)

Critical crack size and basis for the calculation f)

Calculated bore and keyway stress at operating design overspeed g)

Calculated KIC data h)

Minimum yield strength specified for each disk

RESPONSE

It is our understanding that answers to the above questions were provided to the NRC during a meeting between GE and NRC represen-tatives on April 21, 1980, and that the NRC found this an acceptable reply to this question.

9

BRUNSWICK UNITS 1 & 2 QUESTION II Provide details of the results of any completed inservice inspection of LP turbine. rotors, including areas examined, since issuance of an operating license. For each indication detected, provide details of the location'of the indication, its orientation, size, and postulated cause.

RESPONSE

.The LP turbines for Brunswick Units 1 and 2 have been inspected as follows:

UNIT LP-A LP-B BSEP # 1 1/79 No later than 3/82 BSEP # 2 3/79 9/77 Inspection to the above LP turbines consisted of peripheral magnetic particle inspection of rotor surfaces, dye penetrant inspection of bucket erosion shields, and UT inspection of bucket dovetail pins; no indications ha-e been revealed by these inspections.

No wheel U T inspections have been performed at this time.

BRUNSWICK UNITS 1 & 2 OUESTION III Provide the nominal water chemistry conditions for each LP turbine and describe any condenser inleakages or other significant changes in water chemistry to this point in its operating life.

RESPONSE

Reactor Water Chemistry 1.

Oxygen - 200 ppb (Typical Operating Value) 2.

Conductivity (Technical Specification Limits)

During Power Operation & Startup:

<2.0 un/cm 0 25'C; if conductivity is

>2.0 un/cm 0 25'c and <10 un/cm 0 25'C, operation may continue for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before shutting down; if conductivity is >10 un/cm

@ 25"C, shutdown is required.

During Hot Shutdown:

<10 un/cm 0 25*C; if conductivity is >10 iG/cm 0 25'C, shutdown is required.

During Cold Shutdown and Refueling:

<10 uG/cm 0 25'C.

3.

Chlorides (Technical Specification Limits)

During Power Operation:

<500 ppb; if chloride concentration is >500 ppb, unit must be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

During Startup and Hot Shutdown:

<200 ppb; if chloride concentration is

>200 ppb and <500 ppb, operation may continue for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before shutting down; if chloride concentration is >500 ppb, shutdown is required.

During Cold Shutdown and Refueling:

<200 ppb Condenser inleakages have not been considered to be a problem at this point in operating time for these units.

i l

,t. -

BRUNSi='ICK UNITS 1 & 2 '

QUESTION IV If your plant has not been inspected, describe your proposed schedule and approach to ensure that turbine cracking does not exist in your turbine.

RESPONSE

Our plans are to inspect LP turbine wheels on the Brunswick units in accordance with recomendations outlined in GE TIL 857-3.

Our current plans are to inspect as noted below:

UNIT INSPECTION DATE BSEP # 1 1982 3

BSEP # 2 1981

+

4 y

w-v~

BRUNSWICK UNITS 1 & 2

- QUESTION V-

- If your plarit hasL been inspected and plans to return or ha:: returned

- to power with cracks or other defects, provide' your proposed schedule for the next turbine inspection and the basis _for this inspection schedule, including postulated defect growth rate RESPONSE-This question is not applicable to the Brunswick units.

h 4

3 I

s f~

l-i b.

~

' O p

4 j.

i i

Mee-p '

s y -- - -

.e yuy y-p

+-g

+

BRUNS'JICK UNITS 1 & 2 QUESTION VI Indicate whether an analysis and evaluation regarding turbine missiles have been performed for your plant and provided to the staff.

If such an analysis and evaluation has been performed and reported, please provide appropriate references to the available documentation.

In the event that such studies have not been made, consideration should be given to scheduling such an action.

RESPONSE

A turbine missile analysis was performed for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2, when the plant was licensed.

This analysis is summarized in the Brunswick Final Safety Analysis Report, Volume 6, Section 14.7.

It concludes that the probabilities of a " worst" case turbine missile being generated and subsequently impacting on a critical area are sufficiently small to be considered non-events.

s

en 3RUNSWICK UNITS 1 & 2 GENERIC QUESTIONS QUESTION 1 Describe what quality control and inspection procedures are used for the disc bore and keyway areas.

RESPONSE

After the rough machined wheel / disk forging has been tempered, material ~is removed from surface locations to measure mechanical properties. The forging is then subjected to a 100% volumetric ultrasonic inspection.

If the test results meet stringent accep-tance standards,.the forging is released for final machining.

During final machining, attention is continually paid to the finish, contour and dimensions of every surface. For instance, the keyway depth, width, location, radii, and surface finish for every wheel is checked for conformance to drawings.

Quality control personnel assure that tolerances are maintained. Any deviation from accepted tolerances are reported to engineering for disposition.

Only coolants and lubricants approved by Engineering are used in the manufacturing and acsembly prccess. These coolants and lubricants hrfe undergone extensive laboratory corrocion testing to ensure their acceptability prior to their approval for use in manufacturing.

Periodic sampling is done on all such fluids to verify that their chemistry is within acceptable limits.

If required, corrective actions are taken to maintain the chemistry within limits.

After. finish machining, each wheel is thoroughly cleaned and given a magnetic particle inspection of all surfaces.

If acceptable, the buckets are assembled and the wheel is static balanced. After assembly on the shaft, each wheel is inspected and measurements are made to assure its proper locacion.

The assembled rotor is then spun to 20% overspeed following a high speed balance. Finally, after a magnetic particle inspection of the buckets, the rotor is cleaned to prepare for shipment.

9

e e BRINSWICK tmITS 1 & 2 QUESTION II Provide details of the General Electric repair / replacement procedures for faulty disks.

RESPONSE

Stress corrosion cracks have not been observed to date in nuclear wheels manufactured by Genera 1 Electric, and we do not anticipate that removal or replacement of wheels will be required because of this phenomenon. The water erosion which has been observed in the keyways of wheels on several non-reheat machines is being studied intensively. We currently believe that the erosion process is self-limiting and should not require the replacement of any wheels.

4 e

BRUNS'4ICK UNITS 1 & 2 QUESTION III.

What imT.ediate and leng term actions are being taken by General Electric to minimi:e future " water cutting" problems with turbine discs? What acticns are bein; rec:mmended to utilities te minimize " water cutting" of discs?-

RESPONSE

Nolimmediateactionsarerequiredtominimizewatererosionbecause of the apparent self-limiting nature of the phenomenon. However, if future inspections show an unexpected progression of the water erosion, appropriate _ operating restrictions and/or modifications will be ro ommended.

l S

e

q

.a:

BRUNSWICK UNITS 1 & 2 l

l

-QUESTION IV Describe fabrication and heat treatment sequence for disks, including thermal exposure'during shrinking operations.

RESPONSE

The wheel / disk forgings are heat treated _in the rough machined condition. The heat treatment consists of soaking at a temperature above the upper critical temperature with the time and temperature sufficient to ensure complete austenitization throughout the forging, followed by a quench in cold, vigorously circulated water for a sufficient time to ensure complete transformation throughout the section. The forgings are heated uniformly to a tempering temperature below the lower critical temperature and held for a sufficient time to soften to the desired tensile range. After tempering, the forgings are still-air cooled to room temperature.

After final machining, the wheels (disks) are uniformly heated in an electric furnace to a temperature below the embrittling range, but sufficiently high to increase the wheel diameter enough to assemble on the shaft with the required shrink fit.

r.

s r+