Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237B145 + (13:27:50, 2 December 2024)
- ML20237B146 + (13:27:50, 2 December 2024)
- ML20237B139 + (13:27:51, 2 December 2024)
- ML20237B135 + (13:27:59, 2 December 2024)
- ML20237B132 + (13:27:59, 2 December 2024)
- ML20237B131 + (13:28:00, 2 December 2024)
- ML20237B127 + (13:28:00, 2 December 2024)
- ML20237B126 + (13:28:01, 2 December 2024)
- ML20237B123 + (13:28:02, 2 December 2024)
- 05000414/LER-1998-003, Forwards LER 98-003-00,re Violation of TS 2.2.1.Commitments Made within Ltr Are Contained in Planned Corrective Actions Section of Rept + (13:28:10, 2 December 2024)
- ML20237B117 + (13:28:17, 2 December 2024)
- TXX-7081, Interim Deficiency Rept CP-87-29 Re Component Cooling Water Isolation Following Reactor Coolant Pump Rupture.Initially Reported on 870629.Non-Class 1E Temp & Flow Instrumentation Replaced W/Class 1E Equipment.Next Rept Due by 880217 + (13:28:17, 2 December 2024)
- ML20237B115 + (13:28:18, 2 December 2024)
- ML20237B112 + (13:28:19, 2 December 2024)
- RBG-27115, Special Rept:On 871109,invalid Failure of Div I Diesel Generator Occurred During Surveillance Test.Caused by Improperly Calibr Temp Switch.Ref Added to Vendor Calibr Procedure in Loop Calibr Rept for Instrument + (13:28:19, 2 December 2024)
- ML20237B111 + (13:28:20, 2 December 2024)
- ML20237B106 + (13:28:21, 2 December 2024)
- ML20237B107 + (13:28:21, 2 December 2024)
- ML20237B103 + (13:28:22, 2 December 2024)
- ML20237B101 + (13:28:23, 2 December 2024)
- ML20237B102 + (13:28:23, 2 December 2024)
- ML20237B098 + (13:28:24, 2 December 2024)
- ML20237B100 + (13:28:24, 2 December 2024)
- ML20237B094 + (13:28:25, 2 December 2024)
- ML20237B093 + (13:28:26, 2 December 2024)
- ML20237B092 + (13:28:27, 2 December 2024)
- ML20237B088 + (13:28:30, 2 December 2024)
- ML20237B087 + (13:28:31, 2 December 2024)
- A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 + (13:28:32, 2 December 2024)
- ML20237B086 + (13:28:32, 2 December 2024)
- ML20237B084 + (13:28:33, 2 December 2024)
- NSD-NRC-98-5749, Forwards Rev 13 to AP600 PRA for Simplified Passive Advanced LWR Plant Program. Rev Represents Final Version of AP600 Pra.All NRC Comments Related to Rev 12 of AP600 PRA Have Been Resolved + (13:28:33, 2 December 2024)
- ML20237B078 + (13:28:34, 2 December 2024)
- ML20237B074 + (13:28:35, 2 December 2024)
- ML20237B072 + (13:28:43, 2 December 2024)
- IR 05000245/1987027 + (13:28:54, 2 December 2024)
- RC-98-0155, Forwards fitness-for-duty Rept for Period of 980101-0630,per 10CFR26.71(d).Rept Includes Required Test Results,Data Analyses & Summary of Mgt Actions Taken as Result of Testing + (13:28:55, 2 December 2024)
- ML20237B069 + (13:29:02, 2 December 2024)
- ML20237B067 + (13:29:02, 2 December 2024)
- ML20237B065 + (13:29:03, 2 December 2024)
- ML20237B066 + (13:29:03, 2 December 2024)
- ML20237B064 + (13:29:04, 2 December 2024)
- ML20237B061 + (13:29:05, 2 December 2024)
- ML20237B055 + (13:29:06, 2 December 2024)
- ML20237B059 + (13:29:06, 2 December 2024)
- ML20237B053 + (13:29:07, 2 December 2024)
- ML20237B050 + (13:29:08, 2 December 2024)
- ML20237B045 + (13:29:09, 2 December 2024)
- ML20237B048 + (13:29:09, 2 December 2024)
- 05000364/LER-1987-006-01, :on 871115,ESF Actuation Occurred When Diesel Generator 1-2A Autostarted & Supplied Power to 2F & 2K 4160 Volt Buses.Caused by Personnel Error.Personnel Counseled + (13:29:11, 2 December 2024)
- ML20237B040 + (13:29:14, 2 December 2024)