Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20238B940 + (10:55:10, 2 December 2024)
- ML20238B936 + (10:55:11, 2 December 2024)
- ML20238B904 + (10:55:12, 2 December 2024)
- ML20238B880 + (10:55:13, 2 December 2024)
- ML20238B879 + (10:55:13, 2 December 2024)
- ML20238B878 + (10:55:14, 2 December 2024)
- ML20238B873 + (10:55:15, 2 December 2024)
- PLA-7888, Talen Energy - Susquehanna Steam Electric Station, Registration for the Use of Dry Fuel Storage Modules G-4 and G-5, PLA-7888 + (10:55:15, 2 December 2024)
- ML20238B867 + (10:55:17, 2 December 2024)
- ML20238B866 + (10:55:18, 2 December 2024)
- ML20238B857 + (10:55:19, 2 December 2024)
- ML20238B822 + (10:55:19, 2 December 2024)
- ML20238B821 + (10:55:20, 2 December 2024)
- ML20238B808 + (10:55:21, 2 December 2024)
- ML20238B810 + (10:55:21, 2 December 2024)
- ML20238B806 + (10:55:22, 2 December 2024)
- ML20238B799 + (10:55:23, 2 December 2024)
- ML20238B794 + (10:55:24, 2 December 2024)
- ML20238B792 + (10:55:25, 2 December 2024)
- 05000304/LER-1987-004-09, :on 870717,reactor Trip Breaker Trip Occurred. Caused by Inadequate Procedure.Procedure Change Initiated to Instruct Operator to Trip Both Reactor Trip Breakers Prior to Removal of All Dummy Loads + (10:55:27, 2 December 2024)
- ML20238B776 + (10:55:29, 2 December 2024)
- ML20238B773 + (10:55:30, 2 December 2024)
- ML20238B761 + (10:55:31, 2 December 2024)
- PNO-IV-87-038, region Initiated Augmented Insp Team (AIT) to Review Circumstances Associated W/Elevated Reactor Bldg Temps & Assess Impact on Equipment Operability & USAR Accident Analysis.Ait Scheduled to Begin Work on 870818 + (10:55:31, 2 December 2024)
- ML20238B755 + (10:55:32, 2 December 2024)
- PY-CEI-NRR-0697, Forwards Third Quarterly Seismic Monitoring Rept for Util Operated Micro Net.Rept Includes General Description of Automated Seismic Telemetering & Recording (Autostar) Sys, Geographical Layout & Identification of Equipment + (10:55:33, 2 December 2024)
- ML20238B746 + (10:55:34, 2 December 2024)
- ML20238B743 + (10:55:40, 2 December 2024)
- ML20238B740 + (10:55:40, 2 December 2024)
- ML20238B737 + (10:55:41, 2 December 2024)
- ML20238B736 + (10:55:42, 2 December 2024)
- ML20238B731 + (10:55:43, 2 December 2024)
- 05000213/LER-1987-011-08, :on 870721,containment Penetration P-30 Space Heating Steam Supply Failed Type C Local Leak Rate Test. Cause Not Yet Determined.Penetration Modified to Eliminate Two Problem Check Valves from Valve Status + (10:55:44, 2 December 2024)
- ML20238B724 + (10:55:46, 2 December 2024)
- ML20238B726 + (10:55:46, 2 December 2024)
- ML20238B719 + (10:55:47, 2 December 2024)
- ML20238B714 + (10:55:48, 2 December 2024)
- ML20238B708 + (10:55:49, 2 December 2024)
- ML20238B697 + (10:55:50, 2 December 2024)
- ML20238B689 + (10:55:52, 2 December 2024)
- ML20238B688 + (10:55:52, 2 December 2024)
- ML20238B684 + (10:55:53, 2 December 2024)
- ML20238B683 + (10:55:54, 2 December 2024)
- ML20238B681 + (10:55:55, 2 December 2024)
- ML20238B680 + (10:55:56, 2 December 2024)
- ML20238B675 + (10:55:56, 2 December 2024)
- ML20238B672 + (10:55:59, 2 December 2024)
- ML20238B670 + (10:56:00, 2 December 2024)
- ML20238B669 + (10:56:01, 2 December 2024)
- ML20238B668 + (10:56:01, 2 December 2024)
- ML20238B663 + (10:56:02, 2 December 2024)