Public Comment Resolutions on DG-1362 for RG 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities
ML20238B873
Person / Time
Issue date: 12/29/2020
From:
Office of Nuclear Regulatory Research
To:
SJG1
Shared Package
ML20212L516 List:
References
DG-1362 RG 1.200
Download: ML20238B873 (19)


Text

Response to Public Comments on Draft Regulatory Guide DG-1362, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities Proposed Revision 3 of Regulatory Guide 1.200 On July 1, 2020, the Nuclear Regulatory Commission (NRC) published a notice in the Federal Register (85 FR 39599) announcing that Draft Regulatory Guide 1362 (DG-1362, proposed Revision 3 of Regulatory Guide (RG) 1.200) was available for public comment. The published version of DG-1362 was made available in the NRCs Agencywide Document Access and Management System (ADAMS) under accession number ML19308B636. The public comment period ended on July 31, 2020. The NRC received comments from the stakeholders listed below in the first table. The second table presents the commenters original submitted comments, as sourced from the publicly available document under the ADAMS accession number noted for each commenter, and documents the NRC resolution of each of those comments.

Mr. Matthew Degonish Ms. Victoria K. Anderson Mr. Michael Powell Dated: July 8, 2020 < vka@nei.com > PWR Owners Group Nuclear Energy Institute 1000 Westinghouse Drive, Suite 172 1201 F Street, NW, Suite 1100 Cranberry Township, PA 16066 Washington, DC 20004 Dated: July 29, 2020 Dated: July 29, 2020 ADAMS Accession No.: ADAMS Accession No.: ADAMS Accession No.:

ML20191A213 ML20213C659 ML20213C660

Commenter Specific Comments NRC Resolution

1. Mr. Paragraph 2 of Section 2.2.4 of Draft Regulatory Guide 1.200 The NRC agrees with the comment. The NRC revised the cited Matthew Revision 3 has the following statement: statement to indicate that differences between the final published Degonish version of ASME/ANS RA-Sa-2009, as endorsed by the NRC, "Differences between the current version of ASME/ANS RA-Sa-and the earlier version (ASME RA-Sb-2005) should be identified 2009, as endorsed by the NRC, and the earlier version (ASME and addressed by the licensee in a risk-informed application RA-Sb-2005) should be identified and addressed by the licensee when ASME RA-Sb-2005 was used to demonstrate the in a risk-informed application."

acceptability of the licensees base PRA for risk-informed PRA This statement needs clarification. As it is currently worded, it applications.

prescribes the need to assess difference between the current endorsed version of the PRA Standard (i.e., ASME/ANS RA-Sa-2009) and the earlier version (i.e., ASME RA-Sb-2005). The sentence should be updated to specify that this is a requirement when providing a submittal based on the earlier version of the standard. The following is a recommendation for the change:

"When relying upon an earlier version of the standard (e.g.,

ASME RA-Sb-2005), differences between the current version of ASME/ANS RA-Sa-2009, as endorsed by the NRC, should be identified and addressed by the licensee in a risk-informed application."

2

2. Nuclear [T]he Federal Register Notice solicited comments on whether or The NRC reviewed the Nuclear Energy Institutes (NEI) comment Energy not licensees should periodically close all of their PRA peer together with the related comments from the PWR Owners Group Institute review findings to ensure confidence in the information used in (See NRC Resolution for comments 17 and 18 in this document).

risk-informed programs. NEI and its members do not support The NRC believes it is appropriate to include additional guidance such an addition to RG 1.200, as the configuration control criteria with respect to the prolonged retention of open F&Os, because in NEI 17-07, Performance of PRA Peer Reviews Using the such F&Os can impact the implementation of risk-informed ASME/ANS PRA Standard, PWROG 19027-NP, Newly programs, particularly when many open F&Os have accumulated.

Developed Method Requirements and Peer Review, and the For example, this could result in increased level of effort in the ASME/ANS PRA Standard itself, all of which are endorsed in NRCs review of future licensing actions and potential inspections DG-1362, are sufficient to ensure fidelity of information used in such as those that may be necessitated if licensees incorporate risk-informed applications. The configuration control, or NDMs to their PRA models.

maintenance and upgrade, processes are included as part of the Thus, the NRC does not agree with NEIs statement that no PRA peer review, and NRC has access to documentation of additional language is needed in DG-1362 to ensure fidelity of these reviews as part of their review of License Amendment information used in risk-informed applications. When a licensee Requests. No additional language is needed in DG-1362 relative submits a risk-informed license amendment request (LAR), the to configuration control to provide such assurance. It is unclear if licensee and NRC staff must apply resources for the review of there has ever been a regulatory concern that would be the open F&Os associated with the licensees PRA. However, a addressed by such a requirement; if such examples exist, NEI change to the configuration control program that would include would welcome a dialogue with NRC and other stakeholders to closure of open F&Os could help ensure the quality of the PRA discuss the specific occurrences and determine the best means by closing the F&Os using acceptable processes and eliminate to address them.

additional resource burden for NRC staff and licensees in reviewing future applications. As such, in consideration of comments related to the Federal Register notice questions from NEI and the PWR Owners Group, the NRC modified the guidance in regulatory position C.2.2 as follows:

For example, a peer review may be performed on the base PRA model or on a PRA upgrade, which may involve use of an NDM, or in the form of an independent assessment reviewing the closure of facts and observations (F&Os) from a peer review.

Closure of F&Os could enhance the efficiency of NRC reviews of risk-informed applications that use PRA models. F&Os that are not closed using an NRC-endorsed process should be evaluated by the licensee or applicant for their impact on a risk-informed application and addressed with documented justification with necessary changes made to the PRA prior to the use of PRA in 3

Commenter Specific Comments NRC Resolution the risk-informed application. The following sections provide guidance on each of these scenarios.

3. Nuclear RG 1.200 is applicable to risk-informed licensing applications. The NRC has noted the comment but does not agree that Energy However, this draft revision does not distinguish between risk- application should be changed to licensing application Institute informed licensing applications and other risk-informed activities. throughout the document due to the following reasons.

This is an important distinction, as risk-informed activities DG-1362 uses the term application consistent with the definition constitute a much larger scope than licensing applications. It is of the term PRA application from ASME/ANS RA-Sa-2009, as not necessary to conduct large-scale PRA technical acceptability endorsed by the NRC, which is also the term used and endorsed reviews for all of these activities, particularly for those that use in Revision 2 of RG 1.200. The term PRA application is risk information without strong reliance on specific numerical generally defined in ASME/ANS RA-Sa-2009 as, a documented results. Change application to licensing application analysis based in part or whole on a plant-specific PRA that is throughout the document as appropriate used to assist in decision making with regard to the design, licensing, procurement, construction, operation, or maintenance of a nuclear power plant. The NRC staff position regarding situations requiring licensees to demonstrate acceptability of PRA results using RG 1.200 or comparable means is provided in application-specific guidance. As such, the NRC has not made any related changes to RG 1.200.

4

Commenter Specific Comments NRC Resolution

4. Nuclear NEI understands that NRC does not intend to sunset Revision 2 The NRC staff notes and agrees with the comment on Revision 2 Energy of RG 1.200 with issuance of Revision 3. This is important to of RG 1.200. Revision 2 of RG 1.200 will not be withdrawn upon Institute licensees, as many have conducted PRA technical acceptability issuance of RG 1.200, Revision 3. Revision 2 will remain evaluations for ongoing and upcoming risk-informed licensing available for reference and use after Revision 3 is issued. No applications using Revision 2, and there is little value in change was made to RG 1.200, Revision 3 as a result of this repeating these evaluations given that the same standard is comment.

endorsed in both revisions. A clear statement from NRC on the retention of RG 1.200 Revision 2 is important to the operating Also note that regulatory guides are not substitutes for fleet to support continued use of risk-informed licensing regulations and compliance with them is not required. Methods processes. and solutions that differ from those set forth in RGs may be deemed acceptable if they provide a basis for the findings required for the issuance of a permit, license, or license amendment by the Commission.

The following caveat is important if a licensee chooses to use different versions of RG 1.200 in support of an application. The NRC issues RGs to describe to the public, methods that the staff considers acceptable for use in implementing specific parts of the agencys regulations, to explain techniques that the staff uses in evaluating specific problems or postulated events, and to provide guidance to applicants. The staff anticipates that a licensee will reference and follow one revision of RG 1.200 for a given PRA application. If deviations from the referenced revision are made, including using alternatives available in the other revisions of the RG, each deviation should be appropriately identified and justified. This caveat does not apply to applications for which the licensee has not committed to use RG 1.200.

5

Commenter Specific Comments NRC Resolution

5. Nuclear While NEI issued NEI 17-07 to follow on from NEI 05-04, NEI 07- The NRC agrees that previous revisions of RG 1.200 will not be Energy 12, and NEI 12-13, these three documents should remain an discontinued upon issuance of RG 1.200, Revision 3. Revision 2 Institute accepted NRC approach for conducting peer reviews. Retaining of RG 1.200 will remain available for reference and use after (not sunsetting) RG 1.200, Rev. 2 would accomplish this, and Revision 3 is issued. No change was made to RG 1.200, would support licensees who have conducted peer reviews in the Revision 3 as a result of this comment.

decades since Rev. 2 was issued.

The following caveat is important if a licensee chooses to use In issuance of RG 1.200, Rev. 3, specify that Rev. 2 is still an different versions of RG 1.200 in support of an application. The acceptable approach to the NRC. NRC issues RGs to describe to the public, methods that the staff considers acceptable for use in implementing specific parts of the agencys regulations, to explain techniques that the staff uses in evaluating specific problems or postulated events, and to provide guidance to applicants. The staff anticipates that a licensee will reference and follow one revision of RG 1.200 for a given PRA application. If deviations from the referenced revision are made, including using alternatives available in the other revisions of the RG, each deviation should be appropriately identified and justified. This caveat does not apply to applications for which the licensee has not committed to use RG 1.200.

6

Commenter Specific Comments NRC Resolution

6. Nuclear In table 17, as-to-be-built, as-to-be-operated is too narrow in The NRC agrees that the terms as-to-be-built and as-to-be-Energy scope and should be adjusted to recognize that this status can operated may be applicable to operating plants as there may be Institute apply to operating reactors with planned modifications. Remove special circumstances where credit for planned modification(s) in the in the case of a DC or COL application qualifier of as-to- the PRA model is appropriate and these applications are be-built, and as-to-be-operated addressed by the staff on a case-by-case basis.

However, the NRC disagrees with the proposed change, because it could affect the clarity of expectations for design certification See page 42, regulatory position C.2.2.1 (DC) and combined license (COL) applications since the terms as-to-be-built and as-to-be-operated have been interpreted as defined in DG-1362 by applicants, licensees, and NRC staff during past DC and COL reviews. As such, the NRC has added a footnote to the seventh bullet in Table 17 of the regulatory position C.2.2.1 to include the following language:

The NRC recognizes there may be special circumstances where credit for planned modification(s) in the PRA model is appropriate and these applications are addressed by the staff on a case-by-case basis. Regarding the peer review of a base PRA model that credits planned modifications to an operating plant, licensees or applicants should provide details of the planned modifications to the peer review team in advance of the peer review. These details should include any spatial information associated with the planned modification that may impact, for example, internal flood, internal fire, seismic, high-wind, or external flood PRA, or other PRAs of hazards that are dependent on spatial information. The resulting peer review report should clearly identify any planned modifications reviewed by the peer review team. Regulatory position C.4.2 provides guidance on submittal documentation for such cases.

Additionally, the NRC revised regulatory position C.4.2 to include the following statement, A peer review of planned modifications should clearly identify and describe the plant modifications and design changes that are modeled in the PRA but are not completed at the time of the licensing application submittal.

7

Commenter Specific Comments NRC Resolution

7. Nuclear Table 17 should reflect that walkdowns are not needed for all The NRC notes that a walkdown may not be needed for every Energy peer reviews. Add as appropriate after Performs independent peer review; however, the NRC disagrees with the proposed Institute walkdowns of the plant to confirm PRA inputs. change since the use of the word as appropriate does not sufficiently describe the conditions under which a walkdown is appropriate. Therefore, NRC has revised the eighth bullet in See page 42, regulatory position C.2.2.1 Table 17 as follows:

Performs independent walkdowns of the plant to confirm PRA inputs when information about plant configuration, or other aspects of the plant (e.g., spatial aspects) modeled in the PRA, are important to the development of PRA inputs and the acceptability of the base PRA (e.g., as related to internal flood, internal fire, seismic, high-wind, or external flood PRA, or other PRAs of hazards that are dependent on spatial information)

8. Nuclear It is not fully accurate that All supporting requirements related to The NRC agrees with the comment and revised the text as Energy NDMs are applicable for peer review of NDMs. Depending on proposed, with minor edits, and to state that if any supporting Institute the scope of the method, some of the NDM SRs may not be requirements are determined to be inapplicable, justification applicable. Replace with All supporting requirements related to for that conclusion should be documented.

NDMs should be evaluated during peer review of NDMs.

See page 40, regulatory position C.2.1 8

Commenter Specific Comments NRC Resolution

9. Nuclear This section states, A peer review is performed on a PRA The NRC notes that the use of a newly developed method (NDM)

Energy upgrade, which includes the use of an NDM in a PRA. However, by itself may not result in a peer review, but that the use of an Institute this is not strictly true, as the driver for PRA peer reviews of an NDM in a risk-informed application should result in a peer review.

upgrade is the use of such an upgrade in a risk-informed However, the NRC disagrees that a peer review is necessary licensing application. Replace the statement with Prior to use in only in support of a risk-informed licensing application. The NRC a licensing application, a peer review should be performed on a notes that, after being approved by the NRC, a number of risk-PRA upgrade, including the use of an NDM in a PRA.

informed applications enable licensees to change regulated


operating and engineering parameters using the base PRA and relevant application-specific guidance, without prior NRC See page 43, regulatory position C.2.2.2 approval. Therefore, the NRC revised the cited statement as follows:

A peer review should be performed on a PRA upgrade prior to using the upgraded PRA model in support of a PRA application, either for an approved risk-informed program (e.g., risk-informed completion times, 10 CFR 50.69, surveillance frequency control program, NFPA 805), or in the submittal of a risk-informed PRA application for NRC review. The use of an NDM in a PRA is considered a PRA upgrade.

9

Commenter Specific Comments NRC Resolution

10. Nuclear This section includes a clarification to NEI 17-07, which states The NRC agrees with the comment and revised the text as Energy that, Documentation of the resolution of a peer review finding proposed.

Institute should describe how the deficiency in the finding was addressed such that it can be easily demonstrated that the associated supporting requirement is met. However, this expectation is already defined in NEI 17-07 on page E-4, where it is stated that the assessment report should include A summary of the review teams decisions for each finding within the scope of the review, along with the rationale for determination of adequacy or inadequacy for closure of each finding in relation to the affected portions of the associated SR. If multiple SRs are referenced by a single finding, the affected portions of all associated SRs should be addressed. Remove this clarification.

See page 44, regulatory position C.2.2.3

11. Nuclear Paragraph 2 of this section states, "Differences between the The NRC agrees with the comment. The NRC revised the cited Energy current version of ASME/ANS RA-Sa-2009, as endorsed by the statement to indicate that differences between the final published Institute NRC, and the earlier version (ASME RA-Sb-2005) should be version of ASME/ANS RA-Sa-2009, as endorsed by the NRC, identified and addressed by the licensee in a risk-informed and the earlier version (ASME RA-Sb-2005) should be identified application." This statement needs clarification. As it is currently and addressed by the licensee in a risk-informed application worded, it prescribes the need to assess differences between the when ASME RA-Sb-2005 was used to demonstrate the current endorsed version of the PRA Standard (i.e., ASME/ANS acceptability of the licensees base PRA for risk-informed PRA RA-Sa-2009) and the earlier version (i.e., ASME RA-Sb-2005). applications.

The sentence should be updated to specify that this is a requirement when providing a submittal based on the earlier version of the standard. Replace the sentence with "When relying upon an earlier version of the standard (e.g., ASME RA-Sb-2005), differences between the current version of ASME/ANS RA-Sa-2009, as endorsed by the NRC, should be identified and addressed by the licensee in a risk-informed application."

See page 45, regulatory position C.2.2.4 10

Commenter Specific Comments NRC Resolution

12. Nuclear The second paragraph should be revised to allow for peer review The NRC agrees that the second paragraph should be revised to Energy of scheduled plant modifications. After (1) the PRA model, or allow for peer review of scheduled plant modifications for Institute those portions of the model required to support the application, operating plants. The NRC recognizes there may be special represents the as-designed or as-built and as-operated plant, circumstances where credit for planned modification(s) in the add or as-to-be-built, as-to-be-operated plant to reflect the PRA model is appropriate and these applications are addressed potential for review of scheduled modifications. by the staff on a case-by-case basis. As such, the NRC revised and added the following paragraph to regulatory position C.3.3 to include the following language:

See page 48, regulatory position C.3.3 The NRC recognizes there may be special circumstances where credit for planned modification(s) in the PRA model is appropriate and these applications are addressed by the staff on a case-by-case basis. Regarding the peer review of a base PRA model that credits planned modifications to an operating plant, licensees or applicants should provide details of the planned modifications to the peer review team in advance of the peer review. These details should include any spatial information associated with the planned modification that may impact, for example, internal flood, internal fire, seismic, high-wind, or external flood PRA, or other PRAs of hazards that are dependent on spatial information. The resulting peer review report should clearly identify any planned modifications reviewed by the peer review team. Regulatory position C.4.2 provides guidance on submittal documentation for such cases.

Additionally, the NRC revised regulatory position C.4.2 to include the following statement, A peer review of planned modifications should clearly identify and describe the plant modifications and design changes that are modeled in the PRA but are not completed at the time of the licensing application submittal.

11

Commenter Specific Comments NRC Resolution

13. Nuclear The definition of as-designed, as-to-be-built, as-to-be-operated The NRC understands there may be special circumstances Energy should be expanded to allow for peer review of a plant where credit for planned modification(s) in the PRA model is Institute configuration including scheduled modifications. Add or the PRA appropriate and these applications are addressed by the staff on used to model the plant configuration that reflects future a case-by-case basis. However, the NRC disagrees that the scheduled modifications to the end of the definition. definition of as-designed, an-to-be-operated should be expanded because that could affect the clarity of expectations for DC and COL applications. As such, the NRC revised the See page 54, Glossary definition to add a footnote with the following language:

The NRC recognizes there may be special circumstances where credit for planned modification(s) in the PRA model is appropriate and these applications are addressed by the staff on a case-by-case basis. Regarding the peer review of a base PRA model that credits planned modifications to an operating plant, licensees or applicants should provide details of the planned modifications to the peer review team in advance of the peer review. These details should include any spatial information associated with the planned modification that may impact, for example, internal flood, internal fire, seismic, high-wind, or external flood PRA, or other PRAs of hazards that are dependent on spatial information. The resulting peer review report should clearly identify any planned modifications reviewed by the peer review team. Regulatory position C.4.2 provides guidance on submittal documentation for such cases.

Additionally, the NRC revised regulatory position C.4.2 to include the following statement, A peer review of planned modifications should clearly identify and describe the plant modifications and design changes that are modeled in the PRA but are not completed at the time of the licensing application submittal.

12

Commenter Specific Comments NRC Resolution

14. Nuclear The definition of PRA acceptability should be revised to reflect The NRC agrees that the definition of the term PRA Energy the context of PRA acceptability for a specific regulatory acceptability should be revised to reflect the context of PRA Institute decision. Revise the definition to read The ability of a PRA to acceptability for a specific regulatory decision. However, the NRC support a specific risk-informed regulatory decision. does not agree with the change proposed by the commenter.

The NRC revised the definition of PRA acceptability as follows to ensure the definition remains fully consistent with the content See page 55, Glossary of the RG:

Measured in terms of PRA scope, the level of detail in the PRA, the PRAs conformance with the PRA technical elements in regulatory position C.1.2 of this RG, and how closely the PRA represents a plants actual configuration and operations. PRA acceptability is determined for each risk-informed activity considering the staff positions in this RG, staff positions in relevant application-specific regulatory guidance, and any related requirements (e.g., license conditions) for the application.

13

Commenter Specific Comments NRC Resolution

15. Nuclear The purpose of Appendix D is unclear, particularly given that RG The NRC understands the comment but disagrees that Energy 1.200 endorses the screening part of the ASME/ANS PRA Appendix D should be removed from the document. The purpose Institute standard and addresses other hazards in regulatory position of Appendix D is to offer an enhanced understanding of hazards C.1.2.9. The Appendix specifically states that Table D-1 to be considered during the development of a base PRA or provides an extensive list and general description of the hazard during screening performed in accordance with the Part 6 of groups and the hazards within those groups that should be ASME/ANS RA-Sa-2009, as discussed in regulatory considered during the development of a base PRA. There is no position C.1.2.6 and as endorsed in Appendix A to this RG.

context for what should be considered means beyond the Appendix D provides descriptions of the impacts of those hazards screening endorsed in the ASME/ANS PRA Standard. Remove to be considered from Appendix 6-A to ASME/ANS RA-Sa-2009 Appendix D from the document. as well as descriptions of hazard causes and conditions that should also be considered, consistent with the guidance in regulatory position C.1.2.6 of the RG. The NRC agrees that the list of hazards provided in Appendix D should be made consistent with the list of hazards provided in Appendix 6-A to ASME/ANS RA-Sa-2009. As such, the NRC revised the list of hazards provided in Table D-1 of Appendix D to be consistent with the list of hazards provided in Appendix 6-A to ASME/ANS RA-Sa-2009 and indicated in the second paragraph of Appendix D that the two lists are consistent.

14

Commenter Specific Comments NRC Resolution

16. Nuclear [T]his draft revision has a new appendix on Other Hazards The NRC disagrees that Appendix D is duplicative with respect to Energy (Appendix D), which is both duplicative and in conflict with the ASME/ANS RA-Sa-2009 and that Appendix D should be deleted.

Institute ASME/ANS PRA Standard endorsed by RG 1.200. NEI suggests The purpose of Appendix D is to offer an enhanced deleting this appendix, as its inclusion reduces regulatory clarity. understanding of hazards to be considered during the development of a base PRA or during screening performed in accordance with the Part 6 of ASME/ANS RA-Sa-2009, as discussed in regulatory position C.1.2.6 and as endorsed in Appendix A to this RG. Appendix D provides descriptions of the impacts of those hazards to be considered from Appendix 6-A to ASME/ANS RA-Sa-2009 as well as descriptions of hazard causes and conditions that should also be considered, consistent with the guidance in regulatory position C.1.2.6 of the RG.

However, the NRC agrees that the list of hazards provided in Appendix D should be made consistent with the list of hazards provided in Appendix 6-A to ASME/ANS RA-Sa-2009. As such, the NRC revised the list of hazards provided in Table D-1 of Appendix D to be consistent with the list of hazards provided in Appendix 6-A to ASME/ANS RA-Sa-2009 and indicated in the second paragraph of Appendix D that the two lists are consistent.

15

17. PWR [Regarding the first NRC question provided in the Federal The NRC reviewed this comment and Comment 18 together with Owners Register notice:] For clarification, in the peer review process, the related Comment 2 received from the NEI. The NRC Group not all F&Os represent exceptions and deficiencies. There are understands the views offered by the commenters. For comment four types of F&Os: Findings, Suggestions, Best Practices and 17, the NRC agrees with a number of statements provided by the Unreviewed Analysis Methods (UAM). Of these, only Findings commenter, but does not agree with following statements from represent exceptions and deficiencies in the PRA model. this comment:

Unreviewed analysis methods are related to areas where the As RG 1.200 provides guidance for all formal risk informed peer review team either did not have the expertise or enough LARs, regardless of the importance of the PRA model to the time to review those technical aspects of the model. As such, application, the impact and needed for finding closures is highly only Findings and UAMs have the potential to impact the dependent on the specific application that a licensee has technical adequacy of the PRA model.

implemented. Therefore, any regulatory expectations associated UAM F&Os: with finding closure should not be a part of RG 1.200 but should be considered in application specific guidance.

UAM F&Os that are identified as part of a model that is used to support a PRA application should be addressed through an NRC believes that it is appropriate to include guidance that is appropriate focused scope peer review (as identified in NEI 17- applicable to all risk-informed applications including 07), prior to using the model for a PRA application. Any finding risk-informed LARs in RG 1.200 because the findings made by F&Os identified during the peer review of the UAM should be the peer review team are made on the base PRA (i.e., they are addressed as noted below for findings. not application-specific). Since the NRC believes that guidance on closure of finding-level F&Os for the purpose of improving the Finding F&Os:

efficiency of LAR reviews and oversight activities should be As part of a risk informed License Amendment Request, any unambiguous, after considering the responses from NEI and findings that are open at the time of the application are required PWR Owners Group, the NRC has revised regulatory position to be assessed for their impact on the application. This includes C.2.2 as follows:

justification that the PRA model remains technical adequate with For example, a peer review may be performed on the base PRA the open finding. This justification is reviewed by the NRC as model or on a PRA upgrade, which may involve use of an NDM, part of the License Amendment Request (LAR) review process or in the form of an independent assessment reviewing the and any issues regarding PRA technical adequacy are closure of facts and observations (F&Os) from a peer review.

addressed in the safety evaluation, which may include limitations Closure of F&Os could enhance the efficiency of NRC reviews of or conditions on the use of the model with the open F&O(s).

risk-informed applications that use PRA models. F&Os that are Findings from new peer reviews that are performed following a not closed using an NRC-endorsed process should be evaluated PRA upgrade after a model has been determined to be technical by the licensee or applicant for their impact on a risk-informed adequate for a regulatory application should be evaluated prior application and addressed with documented justification with to using the model for that application. If a finding is not closed, a necessary changes made to the PRA prior to the use of PRA in documented justification should be prepared for using the model the risk-informed application. The following sections provide for regulatory applications with the open finding. In some cases, guidance on each of these scenarios.

the finding may be fully addressed, and changes incorporated 16

into the model (including an internal review consistent with the licensees PRA maintenance program prior to implementation) without going through the formal finding closure process. Formal closure of findings is a benefit to the licensee as it eliminates the need to continue to address/evaluate the open finding for future model updates/upgrades and risk informed applications, But this should be a licensee decision (as opposed to being a regulatory requirement) after considering the costs of the closure process against the benefits of the change based on both a risk and cost perspective. The following examples are cases where a licensee may consider leaving a finding open:

  • Peer reviews are typically done against Capability Category (CC) II. For some applications, CC-1 is sufficient and the cost of upgrading the model to CC-II does not provide any significant risk insights
  • There are cases where the NRC staff has not accepted the use of a model for low leakage RCP seals for specific applications, as the model was not specifically reviewed by the staff. This can lead to long standing open findings with no clear path to resolution if the licensee has a finding related to not including the model as it without credit, the model does not represent the as-built, as-operated plant, even though it can be shown that the risk impact of the credit is minimal.
  • As additional models are developed (notably for external hazards), the state of the practice may lead to varying expert opinions on the appropriate assumptions, boundary conditions or methods to be used. Determining which opinion is the best can be difficult or impossible. In most cases, these differences may be insignificant to the results and/or risk insights and can be dealt with through appropriate sensitively studies.

As RG 1.200 provides guidance for all formal risk informed LARs, regardless of the importance of the PRA model to the application, the impact and needed for finding closures is highly 17

Commenter Specific Comments NRC Resolution dependent on the specific application that a licensee has implemented. Therefore, any regulatory expectations associated with finding closure should not be a part of RG 1.200 but should be considered in application specific guidance.

18. PWR [Regarding the first NRC question provided in the Federal The NRC understands the comment; however, based on Owners Register notice:] As noted above [in the previous PWR Owners preceding comments (See NRC Resolution to comment 17)

Group Group comment], it is our position that closure of findings should related to the first question in the Federal Register notice and the not be required, therefore, there should not be any periodicity NRCs resolutions thereof, the NRC has not made any changes required. The important element is to ensure that the impact of with respect to the periodicity for closure of peer review findings.

open findings on the model and applications is evaluated and documented prior to using the model for a regulatory related application.

18

Commenter Specific Comments NRC Resolution

19. PWR With its public comments on DG-13062, PWROG transmitted a The NRC reviewed PWROG-19027-NP, Revision 2 (available in Owners revised version (Revision 2) of PWROG-19027-NP. ADAMS under accession number ML20213C660), with respect to Group the proposed staff positions provided in DG-1362 and notes the following observations:

In regulatory position C.2.2.4 of DG-1362, the NRC provided the following clarification with respect to Section 3 of PWROG-19027-NP, Revision 1:

The description of Step 2 of the process in Section 3 of PWROG-19027-NP, Revision 1, includes four items. The NRC staff considers the first item to be an example of when a state-of-practice method is implemented in a new context whereupon the change to the PRA would be considered a PRA upgrade.

However, the last three of the four items are not considered to be examples of when a state-of-practice method is implemented in a new context, because they could represent cases where an NDM is being used without being subjected to the NDM technical adequacy assessment peer review.

However, Section 3 of PWROG-19027-NP, Revision 2, has been revised to no longer include a step to determine whether a change to a PRA implements a state-of-practice method in a different context. Therefore, the NRC has removed the related clarification in regulatory position C.2.2.4 of RG 1.200, Revision 3.

19