Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20244B407 + (09:21:56, 2 December 2024)
- ML20244B406 + (09:21:57, 2 December 2024)
- NRC-89-0115, Application for Amend to License NPF-43,allowing Operation W/Extended Operating Domain.Proposed Tech Spec Changes Modify APRM Flow Biased Rod Block & Scram Limits.Encls Include Summary,Description of Changes & Tech Spec Pages + (09:21:58, 2 December 2024)
- NLS8900152, Forwards Endorsement 68 to Maelu Policy MF-70 & Endorsement 84 to Nelia Policy NF-200.Endorsements Extend Coverage for CY89 + (09:21:59, 2 December 2024)
- SNRC-1561, Responds to 10CFR50.63 Re Station Blackout (SBO) Rule.Util Has Determined That in Unlikely Event of Sbo,Station Possesses Sufficient Independent & Diverse Alternate Ac Power Capacity + (09:21:59, 2 December 2024)
- ML20244B391 + (09:22:00, 2 December 2024)
- ML20244B387 + (09:22:03, 2 December 2024)
- ML20244B382 + (09:22:04, 2 December 2024)
- ML20244B386 + (09:22:04, 2 December 2024)
- ML20244B381 + (09:22:05, 2 December 2024)
- ML20244B380 + (09:22:05, 2 December 2024)
- ML20244B378 + (09:22:06, 2 December 2024)
- ML20244B377 + (09:22:07, 2 December 2024)
- ML20244B371 + (09:22:09, 2 December 2024)
- ML20244B368 + (09:22:09, 2 December 2024)
- ML20244B367 + (09:22:10, 2 December 2024)
- ML20244B364 + (09:22:11, 2 December 2024)
- ML20244B361 + (09:22:13, 2 December 2024)
- ML20244B356 + (09:22:14, 2 December 2024)
- U-601414, Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Only One Nontraceable Westinghouse Breaker Located.Remaining Breakers Maintained in Stores for Future Class 1E Use + (09:22:14, 2 December 2024)
- ML20244B355 + (09:22:15, 2 December 2024)
- ML20244B348 + (09:22:16, 2 December 2024)
- ML20244B351 + (09:22:16, 2 December 2024)
- ML20244B347 + (09:22:17, 2 December 2024)
- ML20244B345 + (09:22:18, 2 December 2024)
- ML20244B341 + (09:22:19, 2 December 2024)
- B13198, Advises That Annual Fee Will Be wire-transferred on 890501, Per Instructions + (09:22:20, 2 December 2024)
- ML20244B338 + (09:22:20, 2 December 2024)
- ML20244B336 + (09:22:21, 2 December 2024)
- ML20244B334 + (09:22:22, 2 December 2024)
- ML20244B330 + (09:22:23, 2 December 2024)
- ML20244B331 + (09:22:23, 2 December 2024)
- ML20244B327 + (09:22:24, 2 December 2024)
- ML20244B324 + (09:22:25, 2 December 2024)
- ML20244B319 + (09:22:25, 2 December 2024)
- 05000424/LER-1987-081, :on 870505,discovered That Excessive Anchor Darling (AD) Valve Weight Could Have Prevented Fulfillment of Safety Sys Function.Caused by Failure of AD to Notify Bechtel of Change in Weights.Valves Reviewed + (09:22:27, 2 December 2024)
- ML20244B316 + (09:22:28, 2 December 2024)
- ML20244B315 + (09:22:29, 2 December 2024)
- ML20244B313 + (09:22:30, 2 December 2024)
- ML20244B309 + (09:22:31, 2 December 2024)
- ML20244B307 + (09:22:32, 2 December 2024)
- ML20244B306 + (09:22:33, 2 December 2024)
- ML20244B303 + (09:22:34, 2 December 2024)
- ML20244B302 + (09:22:35, 2 December 2024)
- ML20244B299 + (09:22:35, 2 December 2024)
- ML20244B298 + (09:22:36, 2 December 2024)
- ML20244B297 + (09:22:37, 2 December 2024)
- 05000425/LER-1989-003-02, :on 890309,Tech Spec 3.0.3 Entered.Caused by Shift Supervisor Depressurizing RHR Sys W/O Approved Procedure,Lack of Closed Loop Communication & Inadequate Sys Status Sensitivity by Operations Shift Team + (09:22:39, 2 December 2024)
- 0CAN048904, Arkansas Power & Light Co Annual Rept,1988 + (09:22:40, 2 December 2024)
- ML20244B290 + (09:22:41, 2 December 2024)
- ML20244B284 + (09:22:42, 2 December 2024)