Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245H207 + (07:14:57, 2 December 2024)
- ML20245H206 + (07:14:59, 2 December 2024)
- ML20245H204 + (07:15:00, 2 December 2024)
- ML20245H202 + (07:15:02, 2 December 2024)
- ML20245H201 + (07:15:03, 2 December 2024)
- ML20245H199 + (07:15:05, 2 December 2024)
- ML20245H195 + (07:15:07, 2 December 2024)
- ML20245H194 + (07:15:08, 2 December 2024)
- ML20245H193 + (07:15:09, 2 December 2024)
- ML20245H190 + (07:15:10, 2 December 2024)
- ML20245H189 + (07:15:11, 2 December 2024)
- ML20245H188 + (07:15:12, 2 December 2024)
- ML20245H187 + (07:15:14, 2 December 2024)
- ML20245H182 + (07:15:15, 2 December 2024)
- PNO-I-89-048B, on 890626,W Russell Directed Formation of Augmented Insp Team to Review Circumstances Surrounding 890622 Manual Reactor Trip Event.Onsite Team Activities Currently Planned to Begin on 890628 & End on 890630 + (07:15:17, 2 December 2024)
- ML20245H178 + (07:15:18, 2 December 2024)
- ML20245H176 + (07:15:19, 2 December 2024)
- ML20245H171 + (07:15:21, 2 December 2024)
- IR 05000445/1989017 + (07:15:30, 2 December 2024)
- 05000412/LER-1989-023, :on 890804,identified Potential Generic Problem W/Westinghouse Solid State Protection Sys Auxiliary Relays. Mod Made to Control Circuits for Valves.Relays Rewired to Use Two Pairs of Contacts.Part 21 Related + (07:15:33, 2 December 2024)
- ML20245H163 + (07:15:34, 2 December 2024)
- 05000260/LER-1988-019-01, :on 881214 & 27,discovered That Neutron Source Movement Performed W/O Min Required Trains of stand-by Gas Treatment Sys.Caused by Failure to Track Status of Subj Sys Train Following Performance of Surveillance + (07:15:36, 2 December 2024)
- ML20245H153 + (07:15:38, 2 December 2024)
- ML20245H152 + (07:15:39, 2 December 2024)
- ML20245H149 + (07:15:40, 2 December 2024)
- ML20245H147 + (07:15:41, 2 December 2024)
- ML20245H145 + (07:15:42, 2 December 2024)
- ML20245H144 + (07:15:43, 2 December 2024)
- ML20245H142 + (07:15:44, 2 December 2024)
- ML20245H139 + (07:15:45, 2 December 2024)
- ML20245H138 + (07:15:46, 2 December 2024)
- IR 05000313/1989029 + (07:15:47, 2 December 2024)
- ML20245H125 + (07:15:50, 2 December 2024)
- RBG-31324, Forwards Updated Info Re Util Licensing Activities.Effect of Drywell Temp Increase on Suppression Pool Hydrodynamics Can Be Addressed by Evaluating Effects on Peak Drywell Pressure + (07:15:51, 2 December 2024)
- NRC-89-0147, Submits Rev to 880728 Response to Violation 88018-03 Noted in Insp Rept 50-341/88-18.Corrective Actions:Calibrs Being Integrated on Instrumentation Loop Basis Rather than Each Instrument in Loop for More Efficient Performance + (07:15:52, 2 December 2024)
- ML20245H120 + (07:15:53, 2 December 2024)
- PNO-V-89-036, on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn + (07:15:54, 2 December 2024)
- ML20245H115 + (07:15:56, 2 December 2024)
- ML20245H114 + (07:15:57, 2 December 2024)
- ML20245H113 + (07:15:58, 2 December 2024)
- ML20245H110 + (07:15:59, 2 December 2024)
- ML20245H109 + (07:16:00, 2 December 2024)
- PM-89-109, Monthly Operating Rept for May 1989 for Shoreham Nuclear Power Station + (07:16:01, 2 December 2024)
- ML20245H105 + (07:16:02, 2 December 2024)
- ML20245H100 + (07:16:04, 2 December 2024)
- ML20245H099 + (07:16:06, 2 December 2024)
- ML20245H098 + (07:16:06, 2 December 2024)
- ML20245H096 + (07:16:07, 2 December 2024)
- ML20245H094 + (07:16:08, 2 December 2024)
- ST-HL-AE-3128, Special Rept:On 890523,24 & 0608,diesel Generator 13 Tripped During Testing Procedures.First Failure Caused by Increased Resistance Across Contacts of Unit Parallel Mode & Second & Third Failures by Inadequate Air Flow.Contacts Cleaned + (07:16:09, 2 December 2024)
- 3F0889-04, Forwards Response to NRC 890721 Request for Addl Info Re Plant Emergency Diesel Generator Upgrade Program.Util Anticipates Finalizing Resolution of NRC Concerns at Meeting + (07:16:10, 2 December 2024)