ML20245H145
| ML20245H145 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/24/1989 |
| From: | Warnick R Office of Nuclear Reactor Regulation |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20245H148 | List: |
| References | |
| NUDOCS 8905030328 | |
| Download: ML20245H145 (4) | |
See also: IR 05000445/1989017
Text
.
.__.
_ _ .
_
!qi
j
-
'
~
- ..
APR 2 41989
In Reply Refer To:
Docket:
50-445/89-17
50-446/89-17
Mr. W.
J. Cahill.
Executive Vice President
TU Electric
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Dear Mr. Cahill:
This refers to the inspection conducted by Messrs. S. P. Burris and
S.
D. Bitter during the period March 8 through April 4, 1989, of
I
' activities authorized by NRC Construction Permits CPPR-126-and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
j
'and 2, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during.the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observation by the
inspectors.
Within the scope of the inspection, no violations or deviations
were identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
gRIg7pgt gicNED BY R E M
R.
F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Nuclear Reactor Regulation
Enclosure:
Inspection Report 50-445/89-17; 50-446/89-17
cc: w/ enclosure
See next page
RI:IP:CPPD:NRR
SRI:IP:C PD:NRR
IP:CPP *NRR
AD:IP:CPPD:NRR
SBitter
-
SBurris
JWiebet
RWarnick MED
'3p6
4/pf/89
4/fY89
4/24 /89
4/2y/89
,
8905030328 890424
ADOCK 05000445
/ J
___ S__
_ - -__- __ _.
- _ .
,
4
- '
%,
UNITED STATES
I
8
NUCLEAR REGULATORY COMMISSION
o
5
l
W ASHING TON, D. C. 20555
g . . ., . . j?
i
APR 2 41989
l
In Reply Refer To:
Docket:
50-445/89-17
50-446/89-17
Mr. W. J. Cahill
Executive Vice President
TU Electric
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Dear Mr. Cahill:
This refers to the inspection conducted by Messrs. S.
P. Burris and
S. D. Bitter during the period March 8 through April 4, 1989, of
activities authorized by NRC Construction Permits CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and 2, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observation by the
inspectors.
Within the scope of the inspection, no violations or deviations
were identified.
e
In accordance with 10 CFR 2.790 of the Commission'c regulations, a
copy of. this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
,
RFLO &
R.
F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Nuclear Reactor Regulation
Enclosure:
Inspection Report 50-445/89-17; 50-446/89-17
cc: w/ enclosure
See next page
_ _ _ . _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
,I.
-
.W.
J. Cahill
,
cc w/ enclosure:
Roger D. Walker
Nancy H. Williams
Manager, Nuclear Licensing
CYGNA Energy Services
TU Electric
Suite 390
Skyway Tower
2121 N. California Blvd
400 North Olive Street, L.B.
81
Walnut Creek, CA
94596
Dallas, TX
75201
Robert A. Wooldridge, Esq.
Juanita Ellis
Worsham, Forsythe, Sampels
President - CASE
and Wooldridge
1426 South Polk Street
2001 Bryan Tower
Dallas, TX
75224
Suite 2500
Dallas, TX
75201
Susan M. Theisen
Assistant Attorney General
Mr. Homer C. Schmidt
Environmental Protection Division
Director of Nuclear
P.O. Box 12548, Capitol Station
Services
Austin, TX
78711-1548
TU Electric
Skyway Tower
Jack R. Newman, Esq.
400 N. Olive St., L.B.
81
Newman & Holtzinger,
P.C.
Dallas, TX
75201
1615 L Street, NW, Suite 1000
Washington, D.C.
20036
Mr. J. L. Vota
Westinghouse Electric
GDS Associates, Inc.
Corporation
1850 Parkway Place, Suite 720
Post Office Box 355
Marietta, GA
30067-8237
Pittsburgh, PA
15230
Mr. R. W. Ackley
Lanny A. Sinkin
Stone & Webster Engineering
Christic Institute
Corporation Project Mgr.
1324 N. Capitol Street
20002
P. O. Box 1002
Glen Rose, Texas
76043
David R.
Pigott, Esq.
Orrick, Herrington & Sutcliffe
Anthony Z. Roisman, Esq.
600 Montgomery Street
Suite 600
San Francisco, CA
94111
1401 New York Avenue, NW
20005
Steven M. Matthews
Director & Chief Inspector
Ms. Billie Pirner Garde, Esq.
Tx. Dept.of Labor & Standards
Garde Law Office
Boiler Division
104 East Wisconsin Avenue
E.'. Thompson State Off. Bldg.
Appleton, WI
54911
P.O. Box 12157, Capitol Station
78711
Regional Administrator, Region IV
U.S. Nuclear Regulatory Commission
TU Electric
611 Ryan Plaza Drive, Suite 1000
c/o Bethesda Licensing
Arlington, Texas
76011
3 Metro Center, suite 610
Bethesda, MD
20814
______ _ __
(--------
.
.
.;
4
l.
?,
h.;J.Cahilli
=,.
.
> ..
l-
cc w/ enclosure:
(continued)
L
L George A. Parker,' Chairman.
I
Public Utility Committee
1
Senior: Citizens Alliance of
d
Tarrant County, Inc.
6048 Wonder Drive.
4
'
Fort Worth,.9DC -76133
Joseph'F. Fulbright
Fulbright & Jaworski
i
1301 McKinney Street
. Houston, TX
77010
William-A. Burchette,-Esq.
Counsel for Tex-La Electric
. Cooperative of Texas
i
Heron, Burchette, Ruckert'&
!
Rothwell
Suite-700'
,
1025 Thomas Jefferson St., NW
Washington, DC '20007
1
Texas Radiation Control
Program Director
Texas Department of Health'
-1100 West 49th Street
Austin, TX .78756
v
E.
F. Ottney-
P. O. Box 1777
Glen Rose, TX
76043
i
_ _ _ . _ _
_ _ . _ _ _ _ _ _ _ _ . _ _ _
__________.__________.______________________________d