Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246B502 + (05:24:32, 2 December 2024)
- 2CAN088909, Monthly Operating Rept for Jul 1989 for Arkansas Nuclear One Unit 2 + (05:24:38, 2 December 2024)
- ML20246B484 + (05:24:38, 2 December 2024)
- ML20246B479 + (05:24:39, 2 December 2024)
- ML20246B476 + (05:24:40, 2 December 2024)
- NRC-89-0123, Responds to NRC Re Violations Noted in Insp Rept 50-341/89-15.Corrective Actions:Three Deviation Event Repts Supplied to Supervisor for Review & Action as Necessary + (05:24:41, 2 December 2024)
- 1CAN088909, Monthly Operating Rept for Jul 1989 for Arkansas Nuclear One Unit 1 + (05:24:43, 2 December 2024)
- ML20246B468 + (05:24:43, 2 December 2024)
- ML20246B459 + (05:24:45, 2 December 2024)
- RBG-31354, Monthly Operating Rept for Jul 1989 for River Bend Station Unit 1 + (05:24:45, 2 December 2024)
- ML20246B448 + (05:24:46, 2 December 2024)
- ML20246B445 + (05:24:47, 2 December 2024)
- NRC-89-0137, Monthly Operating Rept for Jul 1989 for Fermi 2 + (05:24:51, 2 December 2024)
- ML20246B440 + (05:24:52, 2 December 2024)
- CEO-89-289, Notifies of Change in Operator/Senior Operator Status.Listed Operator/Senior Operator Terminated Employment on Listed Effective Date + (05:24:53, 2 December 2024)
- ML20246B433 + (05:24:53, 2 December 2024)
- ML20246B418 + (05:24:55, 2 December 2024)
- ML20246B411 + (05:24:56, 2 December 2024)
- W3P89-1101, Forwards Application for Amend to License NPF-38,to Allow Sale & Leaseback of Portion of Util Undivided Ownership in Portion of Undivided Ownership Interest in Plant + (05:24:56, 2 December 2024)
- 05000324/LER-1989-008-03, :on 890605,unplanned LOCA Initiation Signal Occurred During Routine Maint Testing of ECCS Resulting in Auto Starting of LPCI Core Spray & RHR Pumps.Caused by Spurious Trip of ECCS Trip Unit.Unit Replaced + (05:24:59, 2 December 2024)
- 1CAN048915, Application for Exigent Amend to License DPR-51,increasing Power to Analyzed Level of 80%.Fee Paid + (05:25:00, 2 December 2024)
- ML20246B394 + (05:25:01, 2 December 2024)
- ML20246B389 + (05:25:02, 2 December 2024)
- ML20246B387 + (05:25:03, 2 December 2024)
- ML20246B381 + (05:25:04, 2 December 2024)
- ML20246B378 + (05:25:05, 2 December 2024)
- ML20246B374 + (05:25:06, 2 December 2024)
- ML20246B373 + (05:25:06, 2 December 2024)
- ML20246B369 + (05:25:07, 2 December 2024)
- ML20246B364 + (05:25:08, 2 December 2024)
- 05000328/LER-1989-007-03, :on 890601,discovered Inconsistency in Reactor Coolant Pump Manual Dc Control Power Transfer Switch Positions.Caused by Mislabeling of Switch Position.Proper Labeling Completed + (05:25:13, 2 December 2024)
- ML20246B346 + (05:25:17, 2 December 2024)
- B13224, Forwards Request for Schedular Exemption from Requirements of 10CFR50,App J,Sections III.A.6.(b),III.D.2(a) & III.D.3. Exemptions Will Provide Relief from Requirements for Penalty Type a Test Intervals During 1989 Refueling Outage + (05:25:18, 2 December 2024)
- ML20246B345 + (05:25:18, 2 December 2024)
- ML20246B338 + (05:25:19, 2 December 2024)
- ML20246B335 + (05:25:20, 2 December 2024)
- ML20246B333 + (05:25:21, 2 December 2024)
- ML20246B330 + (05:25:21, 2 December 2024)
- IR 05000445/1989037 + (05:25:43, 2 December 2024)
- ML20246B320 + (05:25:44, 2 December 2024)
- ML20246B321 + (05:25:44, 2 December 2024)
- 0CAN068913, Advises That Util Developing Appropriate Tech Spec for Inadequate Core Cooling Instrumentation Following Safety Review Committee Meeting on 890808,per NRC 890323 Request + (05:25:46, 2 December 2024)
- ML20246B310 + (05:25:47, 2 December 2024)
- PNO-IV-89-044, on 890628,pressure in Waste Gas Receiver a Decreased from 250 Psig & Pressure in Receiver a Decreased from 60 to 50 Psig.Caused by Erroneous Valve Lineup.Plant Stack Monitors Did Not Alarm + (05:25:47, 2 December 2024)
- ML20246B303 + (05:25:48, 2 December 2024)
- ML20246B298 + (05:25:50, 2 December 2024)
- 05000293/LER-1989-013, :on 890324,HPCI Sys Became Inoperable During Operability Surveillance Test.Caused by Turbine Steam Supply motor-operated Valve Not Opening Due to Two Loose Screws Causing Damage to Valve Operator Internals + (05:25:52, 2 December 2024)
- ML20246B293 + (05:25:53, 2 December 2024)
- ML20246B289 + (05:25:54, 2 December 2024)
- NL-89-598, Monthly Operating Rept for Jul 1989 for Rancho Seco Nuclear Generating Station + (05:25:55, 2 December 2024)
- ML20246B287 + (05:25:56, 2 December 2024)
- ML20246B283 + (05:25:58, 2 December 2024)