Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247Q551 + (00:12:06, 2 December 2024)
- ML20247Q550 + (00:12:07, 2 December 2024)
- ML20247Q548 + (00:12:07, 2 December 2024)
- ML20247Q543 + (00:12:12, 2 December 2024)
- ML20247Q545 + (00:12:12, 2 December 2024)
- ML20247Q542 + (00:12:13, 2 December 2024)
- ML20247Q541 + (00:12:16, 2 December 2024)
- 05000341/LER-1989-018, :on 890818,both Divs of Control Ctr HVAC Shifted from Normal to Recirculation Mode Due to Blown Fuse. Caused by Personnel Error.Accountability Meeting Held & Equipment to Be Rearranged + (00:12:18, 2 December 2024)
- ML20247Q537 + (00:12:19, 2 December 2024)
- ML20247Q534 + (00:12:20, 2 December 2024)
- ML20247Q535 + (00:12:20, 2 December 2024)
- ML20247Q533 + (00:12:21, 2 December 2024)
- ML20247Q530 + (00:12:26, 2 December 2024)
- ML20247Q529 + (00:12:28, 2 December 2024)
- ML20247Q528 + (00:12:28, 2 December 2024)
- ML20247Q524 + (00:12:29, 2 December 2024)
- ML20247Q525 + (00:12:29, 2 December 2024)
- ML20247Q523 + (00:12:31, 2 December 2024)
- ML20247Q519 + (00:12:32, 2 December 2024)
- ML20247Q517 + (00:12:33, 2 December 2024)
- ML20247Q516 + (00:12:36, 2 December 2024)
- 05000458/LER-1989-008, :on 890225,reactor Automatically Scrammed While Performing Upper Thrust Bearing Wear Detector Test & RCIC Sys Injected Due to Spurious Low Reactor Water Level Signal. Turbine Bypass Switch Will Be Installed + (00:12:38, 2 December 2024)
- TXX-8930, Confirms 881222 Transfer of 3.8% Ownership Interest to Util, Authorized by Amends 10 & 9 to CPPR-126 & CPPR-127 + (00:12:39, 2 December 2024)
- ML20247Q510 + (00:12:41, 2 December 2024)
- ML20247Q511 + (00:12:41, 2 December 2024)
- 05000259/LER-1989-023-02, :on 890824,determined That Disabling auto-start Feature of Emergency Equipment Cooling Water (EECW) Sys Pump Rendered EECW Inoperable.Caused by Deficient Surveillance Instruction.Instruction Revised + (00:12:43, 2 December 2024)
- ML20247Q505 + (00:12:45, 2 December 2024)
- ML20247Q507 + (00:12:45, 2 December 2024)
- 05000259/LER-1989-015-01, :on 890627,both Doors of Unit 1 Airlock Opened Simultaneously for 5 Constituting Breach of Secondary Containment.Caused by Weld Failure on Door Lock Mechanisms. Bracket Reattached & Door Operation Verified + (00:12:47, 2 December 2024)
- BECO-89-071, Forwards Supplementary Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment + (00:12:48, 2 December 2024)
- ML20247Q499 + (00:12:49, 2 December 2024)
- ML20247Q497 + (00:12:50, 2 December 2024)
- ML20247Q496 + (00:12:50, 2 December 2024)
- ML20247Q488 + (00:12:51, 2 December 2024)
- ML20247Q492 + (00:12:51, 2 December 2024)
- ML20247Q487 + (00:12:52, 2 December 2024)
- ML20247Q486 + (00:12:53, 2 December 2024)
- ML20247Q485 + (00:12:53, 2 December 2024)
- ML20247Q482 + (00:12:54, 2 December 2024)
- 05000213/LER-1998-002, :on 980421,determined That Visual Insp of Switchgear Cable Shaft Sprinkler Sys Was Not Being Performed Once Per 18 Months.Caused by Inadequate Implementation of License Amend.Fire Watch Patrol Established + (00:12:56, 2 December 2024)
- ML20247Q474 + (00:12:57, 2 December 2024)
- ML20247Q469 + (00:12:58, 2 December 2024)
- ML20247Q472 + (00:12:58, 2 December 2024)
- ML20247Q466 + (00:12:59, 2 December 2024)
- ML20247Q465 + (00:12:59, 2 December 2024)
- ML20247Q462 + (00:13:00, 2 December 2024)
- ML20247Q460 + (00:13:01, 2 December 2024)
- ML20247Q458 + (00:13:02, 2 December 2024)
- ML20247Q459 + (00:13:02, 2 December 2024)
- ML20247Q456 + (00:13:03, 2 December 2024)
- ML20247Q457 + (00:13:03, 2 December 2024)
- ML20247Q452 + (00:13:04, 2 December 2024)