Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247R123 + (00:06:34, 2 December 2024)
- 2CAN098905, Special Rept 50-368/89-013-00 on 890626,pressurizer Level Decreased While Flushing Header C of LPSI Sys.Caused by Backleakage Through Header Safety Injection Check Valve.Hpsi Pump Started & Valve Opened to Inject Water Into RCS + (00:06:35, 2 December 2024)
- TXX-8951, Supplemental Deficiency Rept CP-85-54 Re Discrepancies in supplier-provided HVAC Seismic Qualification Support Documents.Initially Reported on 860926.Corrective Action Completion Date for Unit 1 Rescheduled to Fuel Load + (00:06:35, 2 December 2024)
- ML20247R118 + (00:06:36, 2 December 2024)
- ML20247R111 + (00:06:37, 2 December 2024)
- ML20247R114 + (00:06:37, 2 December 2024)
- ML20247R110 + (00:06:38, 2 December 2024)
- TXX-8949, Final Deficiency Rept CP-89-16 Re Setpoint Tolerance on Auxiliary Feedwater Pump Overspeed Trip.Initially Reported on 890707.Turbine Trip Setpoint Conservatively Lowered. Issue Not Reportable Per 10CFR50.55(e) + (00:06:39, 2 December 2024)
- ML20247R106 + (00:06:41, 2 December 2024)
- ML20247R104 + (00:06:49, 2 December 2024)
- ML20247R102 + (00:06:50, 2 December 2024)
- ML20247R103 + (00:06:50, 2 December 2024)
- TXX-8928, Forwards Addl Info Re Item 4.2 Parts 3 & 4 of Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events + (00:06:51, 2 December 2024)
- ML20247R097 + (00:06:52, 2 December 2024)
- NRC-89-0142, Application for Amend to License NPF-43,modifying License to Reflect Util Purchase of Wolverine Power Supply Cooperative,Inc Ownership Interest in Facility.Transfer of Ownership Scheduled to Occur on or About 900131 + (00:06:52, 2 December 2024)
- ML20247R091 + (00:06:53, 2 December 2024)
- ML20247R088 + (00:06:54, 2 December 2024)
- IR 05000286/1989015 + (00:06:55, 2 December 2024)
- ML20247R085 + (00:06:56, 2 December 2024)
- ML20247R083 + (00:06:56, 2 December 2024)
- TXX-8923, Forwards Revised Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings + (00:06:57, 2 December 2024)
- ML20247R079 + (00:06:57, 2 December 2024)
- ML20247R075 + (00:06:58, 2 December 2024)
- ML20247R071 + (00:06:59, 2 December 2024)
- ML20247R070 + (00:06:59, 2 December 2024)
- ML20247R068 + (00:07:00, 2 December 2024)
- ML20247R063 + (00:07:01, 2 December 2024)
- ML20247R064 + (00:07:01, 2 December 2024)
- ML20247R061 + (00:07:02, 2 December 2024)
- ML20247R060 + (00:07:03, 2 December 2024)
- ML20247R059 + (00:07:03, 2 December 2024)
- TXX-8936, Supplemental Deficiency Rept CP-87-134 Re Deficient Cable Ampacity Ratings,Voltage Ratings & Class 1E Separation Criteria.Initially Reported on 880111.Unit 1 Documentation & Unit 2 Calculations Should Be Completed Prior to Fuel Loads + (00:07:04, 2 December 2024)
- 3F0589-22, Advises That Licensee Will Perform Reverification of Addl Components Dedicated to safety-related Applications That Demonstrates That Overall Program in Place Assures Components Will Satisfactorily Perform Intended Functions + (00:07:05, 2 December 2024)
- ML20247R054 + (00:07:08, 2 December 2024)
- ML20247R052 + (00:07:09, 2 December 2024)
- TXX-8935, Interim Deficiency Rept CP-89-011 Re Pipe Support Discrepancies.Initially Reported on 890501.Further Evaluation Required to Establish Significance.Final Rept Will Be Submitted Prior to Fuel Load for Unit 1 + (00:07:10, 2 December 2024)
- ML20247R051 + (00:07:10, 2 December 2024)
- ML20247R048 + (00:07:11, 2 December 2024)
- ML20247R047 + (00:07:12, 2 December 2024)
- ML20247R042 + (00:07:20, 2 December 2024)
- ML20247R041 + (00:07:21, 2 December 2024)
- ML20247R039 + (00:07:22, 2 December 2024)
- ML20247R038 + (00:07:22, 2 December 2024)
- ML20247R030 + (00:07:23, 2 December 2024)
- ML20247R031 + (00:07:23, 2 December 2024)
- ML20247R028 + (00:07:25, 2 December 2024)
- PNO-III-89-063, on 890922,picketers Protested Licensee Use of Nonbldg Trade Union Personnel to Perform Insp & Maint Work During Outage by Disrupting Outage Contractor Traffic from Entering Gate.Two Arrests Made by County Sheriff Dept + (00:07:25, 2 December 2024)
- ML20247R025 + (00:07:26, 2 December 2024)
- ML20247R020 + (00:07:28, 2 December 2024)
- ML20247R018 + (00:07:29, 2 December 2024)
- ML20247R015 + (00:07:30, 2 December 2024)
- ML20247R016 + (00:07:30, 2 December 2024)