Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000316/LER-1982-034, Forwards LER 82-034/03L-0 + (11:08:46, 18 December 2024)
- ML20052G429 + (11:08:50, 18 December 2024)
- ML20052G427 + (11:08:52, 18 December 2024)
- 05000327/LER-1982-048-03, /03L-0:on 820408,at 100% Power,Automatic Control Valve 1-PCV-3-132 in Auxiliary Feedwater Sys Flowpath Failed to Open on Demand.Caused by Faulty Soldered Amphenol Connector to Electrohydraulic Actuator.Connector Repaired + (11:09:30, 18 December 2024)
- ML20052G424 + (11:09:34, 18 December 2024)
- PNO-I-82-037, on 820513,worker Sustained Skin Contamination During Eddy Current Testing on 2B Reactor Water Cleanup Nonregenerative Hx.External Contamination Occurred on 1x1 Inch Area of Right Shoulder.Worker Decontaminated + (11:09:38, 18 December 2024)
- ML20052G422 + (11:09:40, 18 December 2024)
- 05000327/LER-1982-048, Forwards LER 82-048/03L-0 + (11:10:22, 18 December 2024)
- ML20052G417 + (11:10:26, 18 December 2024)
- ML20052G416 + (11:10:28, 18 December 2024)
- 05000267/LER-1982-012-03, /03L-0:on 820410,at 10% Power,Instrument Air Compressor 1C Temporarily Taken Out of Svc to Repair after- Cooler Leak.Water Leak Caused by Normal Wear of after- Cooler.Air Compressor Returned to Svc After Repairs + (11:11:05, 18 December 2024)
- ML20052G413 + (11:11:10, 18 December 2024)
- 05000267/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Encl + (11:13:59, 18 December 2024)
- ML20052G409 + (11:14:03, 18 December 2024)
- ML20052G406 + (11:16:16, 18 December 2024)
- ML20052G405 + (11:16:19, 18 December 2024)
- ML20052G402 + (11:17:35, 18 December 2024)
- ML20052G401 + (11:17:39, 18 December 2024)
- ML20052G398 + (11:17:40, 18 December 2024)
- ML20052G397 + (11:17:45, 18 December 2024)
- ML20052G394 + (11:19:26, 18 December 2024)
- ML20052G392 + (11:19:30, 18 December 2024)
- ML20052G391 + (11:19:31, 18 December 2024)
- ML20052G389 + (11:19:33, 18 December 2024)
- ML20052G386 + (11:19:34, 18 December 2024)
- 05000321/LER-1982-026-03, /03L-0:on 820408,level Switch 1E11-N041 Found Inoperable in Course of Surveillance Procedure HNP-1-3155.Caused by Bent Float Rod.Float Rod Straightened & Switching Assembly Reassembled & Calibr Per HNP-1-5278 + (11:20:06, 18 December 2024)
- 05000266/LER-1982-011-03, /03L-0:on 820415,during Biweekly Calibr Check ICP 2.1 of Reactor Protective Sys Functions,Overpower Delta T Setpoint 2 for Channel 2 Found Less Conservative than Tech Spec Limit.Caused by Setpoint Drift in Impulse Summer Uni + (11:21:15, 18 December 2024)
- 05000321/LER-1982-026, Forwards LER 82-026/03L-0 + (11:21:43, 18 December 2024)
- ML20052G379 + (11:21:50, 18 December 2024)
- ML20052G376 + (11:21:51, 18 December 2024)
- 05000266/LER-1982-011, Forwards LER 82-011/03L-0 + (11:22:22, 18 December 2024)
- ML20052G372 + (11:22:25, 18 December 2024)
- ML20052G371 + (11:22:27, 18 December 2024)
- 05000266/LER-1982-009-03, /03L-0:on 820408,4.16-kV Safeguards Undervoltage Relays Did Not Meet 0-volt Time Delay Spec.Caused by Manufacturer Characteristic Curves.Relays Not Capable of Less than 0.38-s.Tech Spec Change Requested on 820427 + (11:22:42, 18 December 2024)
- ML20052G369 + (11:22:44, 18 December 2024)
- ML20052G367 + (11:22:45, 18 December 2024)
- ML20052G365 + (11:22:48, 18 December 2024)
- ML20052G364 + (11:22:49, 18 December 2024)
- 05000369/LER-1982-025-03, /03L-0:on 820318,vol Control Tank Makeup Frequency Increased & Containment Floor & Equipment Sump 1A Level Increased During RCS Leak Test.Caused by Failure to Verify Isolation Valves Closed Due to Procedural Deficiency + (11:24:42, 18 December 2024)
- ML20052G360 + (11:24:45, 18 December 2024)
- ML20052G359 + (11:24:47, 18 December 2024)
- ML20052G357 + (11:24:48, 18 December 2024)
- ML20052G355 + (11:24:49, 18 December 2024)
- AECM-82-200, Final Deficiency Rept Re Outboard Subsystem Process Line Layout of MSIV Leakage Control Sys,Initially Reported 820422.Subsystem Rerouted.Also Reported Per Part 21 + (11:24:51, 18 December 2024)
- ML20052G353 + (11:25:19, 18 December 2024)
- 05000369/LER-1982-025, Forwards LER 82-025/03L-0 + (11:25:51, 18 December 2024)
- ML20052G349 + (11:25:54, 18 December 2024)
- ML20052G347 + (11:25:59, 18 December 2024)
- ML20052G345 + (11:26:01, 18 December 2024)
- ML20052G343 + (11:26:03, 18 December 2024)
- ML20052G342 + (11:26:05, 18 December 2024)