ML20052G355

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1982
ML20052G355
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/04/1982
From: Bogart D, Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML20052G350 List:
References
NUDOCS 8205180287
Download: ML20052G355 (4)


Text

9 OPERATING DATA REPORT DOCKET NO.

sn_1n?

DATE 5/1/*2 CO\\lPLETED BY

_D.

Bozart TELEPliONE (904) 795-6-39 OPER AlING STA10S

1. Unit N3.,ne:

Crystal ?iver Unit #3 N

. Reportmg Period:

4/l'22 - 4/30/82

3. Liernwd Thennal Power (51ko:

2544

4. Nameplate Rating (Gross Siker:

890 i Design Electrical Rating (Net \\lhe):

825 Slasimum Dependable Capac:ry (Gross 51We):

845 2.

  • 5tasimum Dependable Capac:y (Net alwe):

806 If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since List Report. Gise Reasons:

N/A

i. Power Lesel To Which Restri::ed,1f Any (Net SIWey Appro+,en1 v 7 80 v'e (net).

1). Reasons For Restrictions. lf Asy:

Restricted to 2300 W thernal due to RC Pumr Power Monitors being bypassed. Net M'.le corresponding to this varies with cycle efficiency.

This 51onth Yr.-to.Date Cumulatise 1: If ours In Reporting Period 720 28SO 45000

12. Number OfIlours Reactor Was Critical 690.6 1993.7 27443.09 1.1 Reactor itesene Shutdown Hon 0

3.9 1213.12 la flours Generator On-Line 687.3 1969.9 26782.08 If Unit Reserve Shutdown flours 0

0 0

1: Gross Thermal Energy Gererated (SIWil) 1508450 4557538 59924479 1 Gross Electrical Energy Genen:ed 1.51Wil) 5107.63 1557872 20357463 1? Net Electrical Energy Generated i5tWil) 485372 1483948 19313246 10 Unit Service Factor 95.5%

68.a%

59.5%

., Unit Asailability Factor 95.5%

6 8. ".

  • 59.5%
I Unit Capacity Factor (Using 51LC Net) 83.6%

63.9%

54.8%

Unit Capacity Factor (Usin; DER Net) 81.7%

62.5%

52.0%

2.1 Unit Forced Outage Rate 4.5%

31. o;;

27.07.

- Shutdowns Scheduled Oser Nett b \\1onths (Type. Date,and Duration of Each t:

Turbine Maintenance

are scheduled for 5/21/82 to last i days.

?! If Shut Down At End Of Repm Period. Estimated Date of Startup:

N/A 2: Units in Test Status (Prior to a:.,mmercial Operation):

Forecast Achiesed INiil AL CRHICALITY 1/1 M 77-INiil\\L ELICTRICITY l/30'77

/

CO\\!\\lLR(. ; AL UPER AIloN 3/l3/77 8205180 W

AVER AGE D \\lLY UNIT POWER LEVEL DOCKET NO.

50-102 L3IT _FLCRP-3 5/3/82 D\\TE CO\\lPLETED By D. Bogart TELEPHONE (904) 795-6486

.\\lONT11 April 19S2 DAY

\\VER AGE DAILY POWER LEVEL DAY AVER \\GE DAILY power LEVEL t \\1h e-Nei,

6tWe Neti 3

0 17 740 2

258 13 728 3

584 19 735 4

607 20 724 5

618 722 6

607 22 777 7

694 73 733 8

763 742

,4 9

752 25 699 10 76; 26 733 11 7 31 2;

740 g$

693 25 77n I3 69' 29 725 14 749 30 737 I5 732 3,

is 735

/

INSTRLC :ONS relio n a.

in th. Com;'ute to

' e !. a rr <

i

UNIT SilUIDOWNS TND POWER REDUCTIONS IW'm NO. 30- W UN1I N AM E FLCRP-3 D.t T E 5/4/82 Cos!PLETED BY ll.

W.

Culver REPORT MONTil 4/82 TEL.L PilON E (904) 795-6486 I w5 3

z._

11 6 r;

'; e p

,=a 1icenste g -r,,

59, r nse A r.,neone

-. ~

3

,5 *y l., ni

., ~ f

r.,'

3,,,,,n,,,

fE 5

~6 p, !

Rcpint n jig

!j V p,mi ni Rct urern. c O

d.

H2-8 820401 F

32.7 A

3 N/A IA INSTRU continuation of outage from last

month, 82-9 820402 F

0 D

N/A N/A IA INSTRU Restricted to 75% FP until an eval-uation has been made to determine what power level can be attained with the RC pump power monitors hypa m...l.

f t.' 10 f t.'o!.0 /

F 0

D N/A N/A lA I N:iTHl!

Heataicted to '30. 4 % Fl' (2300 MWth) with RC pump power monitors bypatsed.

t

'l t

I I

2 3

I~

l s's.c !

He.non ;

Method; Exhdnt (; frntruoinen l

5 S, lic. luleil A Iipupment 12ailtire (lhplain) 14lanual f.. Pe rp n at n.ei.il I nt.i li M.onten.ini c or 'ics:

2 M. inn..I s i in.

g n i n g,, s 3,n :,, en.,,

l'Reinclung

3. Automatic S rain.

I sent Repost il i RII sie(NilRI(;.

D Rcgulatory Restriction 4.Other (l.splam) 01(,1 )

l Opciator liaining & Iicense rsamination 1 AtInalnnli.stivC

,5

(, Operational lit tor (E xpl.iin)

I:sinbie 1 Same Source fi l'3/77)

I! Ot he r (lisplain) 1

(

110:.'T1!LY OPEFJ.T;c-U' SC?'.GY STATDiE.T i

(,

DOCKET -;0 50-302 U11T FLCRP-3 DATE 5/4/82 CC:!PLETED BY M.W. Culver TELEPl!0: E (904) 795-6486 1:0!;T11 Apr 11__198 2 SW:'.ARY STATE !E::T:

The unit returned :2 pc.er on 4/2/52 and stayed there all month.

Power.as a: first restricted to 75% FP and now to 90% FP vith the RC pump pc er nonitors in bypass.

.