Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20054G248 + (22:56:09, 17 December 2024)
- 05000338/LER-1982-036, Forwards LER 82-036/03L-0 + (22:56:13, 17 December 2024)
- 05000259/LER-1982-033, Forwards LER 82-033/01T-0 + (22:56:24, 17 December 2024)
- 05000336/LER-1982-015, Forwards LER 82-015/03L-0 + (22:56:26, 17 December 2024)
- 05000298/LER-1982-011, Forwards LER 82-011/03-0.Detailed Event Analysis Submitted + (22:56:28, 17 December 2024)
- ML20054G234 + (22:56:30, 17 December 2024)
- ML20054G235 + (22:56:30, 17 December 2024)
- RBG-12-792, Final Deficiency Rept Re Rebar Cutting Above 90 Ft Elevation in Shield Bldg.Condition Determined Not Reportable Per 10CFR50.55(e) + (22:56:33, 17 December 2024)
- ML20054G231 + (22:56:34, 17 December 2024)
- IR 05000285/1982007 + (22:56:35, 17 December 2024)
- ML20054G227 + (22:56:36, 17 December 2024)
- 05000338/LER-1982-032, Forwards LER 82-032/03L-0 + (22:56:37, 17 December 2024)
- ML20054G224 + (22:56:37, 17 December 2024)
- ML20054G219 + (22:56:40, 17 December 2024)
- ML20054G218 + (22:56:41, 17 December 2024)
- B10521, Informs of Merger of Hartford Electric Light Co Into CT Light & Power Co.Amend to Existing List of Companies Which Hold Facility Licenses Required + (22:56:43, 17 December 2024)
- ML20054G216 + (22:56:43, 17 December 2024)
- ML20054G213 + (22:56:44, 17 December 2024)
- ML20054G215 + (22:56:44, 17 December 2024)
- ML20054G212 + (22:56:45, 17 December 2024)
- ML20054G210 + (22:56:46, 17 December 2024)
- ML20054G211 + (22:56:46, 17 December 2024)
- ML20054G209 + (22:56:47, 17 December 2024)
- ML20054G207 + (22:56:48, 17 December 2024)
- ML20054G208 + (22:56:48, 17 December 2024)
- ML20054G203 + (22:56:49, 17 December 2024)
- 05000366/LER-1982-054, Forwards LER 82-054/03L-0 + (22:56:53, 17 December 2024)
- ML20054G201 + (22:56:53, 17 December 2024)
- ML20054G197 + (22:56:55, 17 December 2024)
- ML20054G193 + (22:56:56, 17 December 2024)
- ML20054G192 + (22:56:56, 17 December 2024)
- ML20054G191 + (22:56:57, 17 December 2024)
- 05000325/LER-1982-032, Forwards LER 82-032/03L-0 + (22:57:01, 17 December 2024)
- ML20054G189 + (22:57:01, 17 December 2024)
- ML20054G185 + (22:57:03, 17 December 2024)
- ML20054G181 + (22:57:04, 17 December 2024)
- 05000280/LER-1982-024-01, /01T-0:on 820524,weld Leak on a Steam Generator Channel Head Drain Piping at 2-RC-159 Identified During RCS Integrity Test PT-11.Caused by Random Defect in Root Weld, Possibly Due to Split Pass + (22:57:06, 17 December 2024)
- ML20054G171 + (22:57:14, 17 December 2024)
- ML20054G168 + (22:57:17, 17 December 2024)
- ML20054G167 + (22:57:17, 17 December 2024)
- ML20054G164 + (22:57:19, 17 December 2024)
- ML20054G166 + (22:57:19, 17 December 2024)
- ML20054G162 + (22:57:20, 17 December 2024)
- PM-82-507, Ro:On 820426,during Calibr of Seismic Instrumentation, Triaxial Seismic Switch 2L51-NO22 Found Inoperable.Switch Damaged During Recent Refueling Outage & Torus Mod Outage. Switch Returned to Vendor for Repair + (22:57:21, 17 December 2024)
- IR 05000285/1982006 + (22:57:22, 17 December 2024)
- ML20054G156 + (22:57:23, 17 December 2024)
- ML20054G157 + (22:57:23, 17 December 2024)
- ML20054G155 + (22:57:25, 17 December 2024)
- ML20054G153 + (22:57:25, 17 December 2024)
- ML20054G151 + (22:57:29, 17 December 2024)
- ML20054G147 + (22:57:30, 17 December 2024)
- 05000361/LER-1982-014, Forwards LER 82-014/01T-0.Detailed Event Analysis Submitted + (22:57:39, 17 December 2024)