MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2401998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8201998-06-30030 June 1998 Monthly Operating Repts for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236F0381998-05-31031 May 1998 Monthly Operating Repts for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8251998-05-31031 May 1998 Revised MOR for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247K3851998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for McGuire Nuclear Station ML20247L5981998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0681998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247L6181998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E3991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0811998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1997 for McGuire Nuclear Station,Units 1 & 2 ML20202G7531998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E4111998-01-31031 January 1998 Rev 1 to Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20202G7741997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station,Units 1 & 2 ML20198P2521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station ML20203H6491997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for McGuire Nuclear Station,Units 1 & 2 ML20199D3221997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station ML20203H6601997-10-31031 October 1997 Revised Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station,Units 1 & 2 ML20211P9841997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for McGuire Nuclear Station ML20216K1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2 ML20216K1561997-07-31031 July 1997 Revised Monthly Operating Status Rept for Jul 1997 for McGuire Nuclear Station,Units 1 & 2 ML20210L0691997-07-31031 July 1997 Monthly Operating Repts for July 1997 for MNS ML20149F2421997-06-30030 June 1997 Monthly Operating Repts for June 1997 for McGuire Nuclear Station,Units 1 & 2 ML20140H1171997-05-31031 May 1997 Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
Text
- - ._
OPERATING DATA REPORT DOCKET NO. 50-369 DATE 6-15-82 CO.\ lPLETED BY J. A. Reavis TELEP110NE 704-373-8552 OPERATING ST ATUS N"
- 1. Unit Name:
McGuire #1 May 1. 1982 - May 31, 1982
- 2. Reporting Period:
- 3. Licemed Thennal Power talWti:
3 411 1 220
- 4. Nameplate 1(ating (Gross MWe).
- 5. Design Electrical Rating (Net 3twei: 1 180
- 6. Maximum Dependable Capacity IGross .\tWe):
- 7. Masimum Depend:ible Capacity (Net MWel:
S. If Changes Occur in Capacity 1(atings tilems Number 3 Through 7) Since Last Report.Gise Reasons:
- 9. Power Level To which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..t o.Da t e Cumulative
- 11. Ilours in Reporting Penod 744.0 3 623.0 4 367.0 _
- 12. Number Of li.mrs Reactor was Critical 744.0 3 031.3 3 077.0
- 13. !(cactor Resene Shutdown llours
- 14. Ilours Generator On Line 744.0 3 007.0 3 052.7
- 15. Unit Resene Shutdown flours
- 16. Gross Thermal Energy Generated (NWil) 1 484 279 5 535 480 5 620 435
- 17. Gross Electrical Energy Generated (MWil) 509_241 ,_, 1 877 796 1 906 232 IS. Net Electrical Energy Generated (Mwli) _
481 206 1 757 193 1 776 249
- 19. Unit Seruce Factor 100.0 83.0 69.9
- 20. Unit Availability Factor ._
100.0 83.0 69.9
- 21. Unit Capacity Factor IUsing MDC Net) 54.8 41.1 34.5
- 22. Umt Capacity Factor (Usm; DER Net) 73.0 54.7 45.9
- 23. Unit Forced Outate Rate 0.0 17.0 30.1
- 24. Shutdowns Scheduled Oser Nest 6 \lonths (Type. Date.and Duration of Fach t:
6/22 - Three weeks eddy current testing 11/31 - Three weeks eddy current testing
- 25. !( Shut Down \t End Of Report Pernid. Estim.ded Date of Startup:
- 26. Units In Test Status (Prnir to Conunercial Operation): Forecau Achiesed INITI \ L CRITIC A ll1 Y 15111 \ l.1 L t 01 RICI T Y C0\l\ll.RCI.\ t. OPl R A TION 8206210204 B20615 P1/771 PDR ADOCK 05000369 R PDR f
DOCKET NO. 50-369 UNIT McGuire 1 DATE 6-15-82 AVERAGE DAILY UNIT POWElt LEVEL MONTil Mav. 1982 AVERAGE D AILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-neu DAY (MWe.ne t) ,
552 17 552 1
556 18 548 2
556 39 546 3
556 20 544 4
557 21 624 5
557 22 825 6
555 23 824 7
557 24 825 8
553 25 825 0
556 26 804 10 556 27 841 11 528 28 855 12 542 29 856 13 546 30 869 14 555 31 877 15 554 16 DAILY UNrr POWER LFYEL FOR\1 INSTRUCTIONS On this form, list the averare daily unit power lesel in MWe net for each day in the reporting n.onth.
Compute to the nearest wnole megawatt.
These figures will 1 e used to plot a graph I'or each reporting month. Note that by usinsi maximum
..t easions when the daily dependable capacity for the net electrical ratin: of the umt there may be average power lese: curetts the 1U01 hoe toe the restthted power lesel Ime). In such cases, the average daily unit power output sheet should be footnoted to t splain the app.uent anomaly.
50-369' l' NIT S!!UTDOWNS AND POWER REDUCllONS DOCKET NO.
UNIT N Ah1E McGuire 1 I) ATE 6-15-8Z May,1982 COSIPLETED ilY J. A. Reavis RI:POR T .\tONTil TELEPlf0NE 704-373-8552 n.
- E TE
-, .5 ? 'h $ Ei Licensee ,Evo $% Cause & Corrective No . Date r- 3g ( ,g g y Event
?? El Action to
$E 5 jdj= Repost # viU j' Prevent Recurrente Q
7-P 82-05-01 F --
H --
CB HTEXCH Holding at 50% power awaiting further analysis of steam generator condition.
8-P 82-05-21 F --
H --
CB HTEXCH Increased to 75% power for a thirty (30 )
day test run of the steam generator at this power level.
i 2 3 ;
F: Fin cet! Reasos.: Method: Exhibit G. Instructions S. Scheduleti A Fquipment Failure (Explain) 1 Alanual for Preparation of Data 114taintenance of Test 24fanual Serain. lintry Sheets for Licensee C Refueling 1 Autoin.itic Scram. livent Report (LER) File (NURLG-D-Regulatory Restiiction 4 Other (Explain) 0161) 1: Ope.ator Training & License lixamination F Administrative 5 G-Opeiational Es tor (lisplain) Extiihit I Same Source Pl/77) Il Other (fixplain)
DOCKET NO: 50-369 UNIT: McGuire Unit 1 DATE: June 15, 1982 NARRATIVE
SUMMARY
Month: May, 1982 McGuire 1 began the month of May at 50% reactor power awaiting further analysis of the steam generator condition. On May 21, the power was increased to 75% for a thirty (30) day test run of the steam generators at this level. After comple-tion of the run, the steam generators will be inspected. No major operating problems were experienced during May.
1
MONTHLY REFUELING INFORMATION REQUEST rn r J 'e
- 1. Facility name: McGuire Unit 1 .
- 2. Scheduled next refueling shutdown: June, 1983 ,
- 3. Scheduled restart following refueling: .
- 4. Will refueling or resu=ption of operation thereafter require a technical specification change or other license amendment? .
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed saf ety questions $ N/A .
If no, when is review scheduled? N/A .
- 5. Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion : N/A .
- 6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A
- 7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 27 ,
- 8. Present licensed fuel pool capacity: 500 ,
Size of requested or planned increase: .
- 9. Projected date of last refueling which can be accoccodated by present licensed capacity:
June 15, 1982 DUKE PCWER COPTAlnf Date: .
Name of
Contact:
J. A. Reavis
=
,=
3
\
McGUIRE NUCLEAR STATION Operating Status Report
- 1. Personnel Exposure For the month of April, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
- 2. The total station liquid release contribution to whole body dose for April has been compared with the Technical Specifications annual value of 3 mrem; the total release for April was less-than 10 percent of this limit.
The total station gaseous release contribution to any organ dose for April has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for April was less than 10 percent of this limit. ,