Monthly Operating Rept for May 1982
ML20054G171
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20054G169 List:
References
NUDOCS 8206210204
Download: ML20054G171 (6)


Text

- - ._

OPERATING DATA REPORT DOCKET NO. 50-369 DATE 6-15-82 CO.\ lPLETED BY J. A. Reavis TELEP110NE 704-373-8552 OPERATING ST ATUS N"

1. Unit Name:

McGuire #1 May 1. 1982 - May 31, 1982

2. Reporting Period:
3. Licemed Thennal Power talWti:

3 411 1 220

4. Nameplate 1(ating (Gross MWe).
5. Design Electrical Rating (Net 3twei: 1 180
6. Maximum Dependable Capacity IGross .\tWe):
7. Masimum Depend:ible Capacity (Net MWel:

S. If Changes Occur in Capacity 1(atings tilems Number 3 Through 7) Since Last Report.Gise Reasons:

9. Power Level To which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr..t o.Da t e Cumulative

11. Ilours in Reporting Penod 744.0 3 623.0 4 367.0 _
12. Number Of li.mrs Reactor was Critical 744.0 3 031.3 3 077.0
13. !(cactor Resene Shutdown llours
14. Ilours Generator On Line 744.0 3 007.0 3 052.7
15. Unit Resene Shutdown flours
16. Gross Thermal Energy Generated (NWil) 1 484 279 5 535 480 5 620 435
17. Gross Electrical Energy Generated (MWil) 509_241 ,_, 1 877 796 1 906 232 IS. Net Electrical Energy Generated (Mwli) _

481 206 1 757 193 1 776 249

19. Unit Seruce Factor 100.0 83.0 69.9
20. Unit Availability Factor ._

100.0 83.0 69.9

21. Unit Capacity Factor IUsing MDC Net) 54.8 41.1 34.5
22. Umt Capacity Factor (Usm; DER Net) 73.0 54.7 45.9
23. Unit Forced Outate Rate 0.0 17.0 30.1
24. Shutdowns Scheduled Oser Nest 6 \lonths (Type. Date.and Duration of Fach t:

6/22 - Three weeks eddy current testing 11/31 - Three weeks eddy current testing

25. !( Shut Down \t End Of Report Pernid. Estim.ded Date of Startup:
26. Units In Test Status (Prnir to Conunercial Operation): Forecau Achiesed INITI \ L CRITIC A ll1 Y 15111 \ l.1 L t 01 RICI T Y C0\l\ll.RCI.\ t. OPl R A TION 8206210204 B20615 P1/771 PDR ADOCK 05000369 R PDR f

DOCKET NO. 50-369 UNIT McGuire 1 DATE 6-15-82 AVERAGE DAILY UNIT POWElt LEVEL MONTil Mav. 1982 AVERAGE D AILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-neu DAY (MWe.ne t) ,

552 17 552 1

556 18 548 2

556 39 546 3

556 20 544 4

557 21 624 5

557 22 825 6

555 23 824 7

557 24 825 8

553 25 825 0

556 26 804 10 556 27 841 11 528 28 855 12 542 29 856 13 546 30 869 14 555 31 877 15 554 16 DAILY UNrr POWER LFYEL FOR\1 INSTRUCTIONS On this form, list the averare daily unit power lesel in MWe net for each day in the reporting n.onth.

Compute to the nearest wnole megawatt.

These figures will 1 e used to plot a graph I'or each reporting month. Note that by usinsi maximum

..t easions when the daily dependable capacity for the net electrical ratin: of the umt there may be average power lese: curetts the 1U01 hoe toe the restthted power lesel Ime). In such cases, the average daily unit power output sheet should be footnoted to t splain the app.uent anomaly.

50-369' l' NIT S!!UTDOWNS AND POWER REDUCllONS DOCKET NO.

UNIT N Ah1E McGuire 1 I) ATE 6-15-8Z May,1982 COSIPLETED ilY J. A. Reavis RI:POR T .\tONTil TELEPlf0NE 704-373-8552 n.

- E TE

-, .5 ? 'h $ Ei Licensee ,Evo $% Cause & Corrective No . Date r- 3g ( ,g g y Event

?? El Action to

$E 5 jdj= Repost # viU j' Prevent Recurrente Q

7-P 82-05-01 F --

H --

CB HTEXCH Holding at 50% power awaiting further analysis of steam generator condition.

8-P 82-05-21 F --

H --

CB HTEXCH Increased to 75% power for a thirty (30 )

day test run of the steam generator at this power level.

i 2 3  ;

F: Fin cet! Reasos.: Method: Exhibit G. Instructions S. Scheduleti A Fquipment Failure (Explain) 1 Alanual for Preparation of Data 114taintenance of Test 24fanual Serain. lintry Sheets for Licensee C Refueling 1 Autoin.itic Scram. livent Report (LER) File (NURLG-D-Regulatory Restiiction 4 Other (Explain) 0161) 1: Ope.ator Training & License lixamination F Administrative 5 G-Opeiational Es tor (lisplain) Extiihit I Same Source Pl/77) Il Other (fixplain)

DOCKET NO: 50-369 UNIT: McGuire Unit 1 DATE: June 15, 1982 NARRATIVE

SUMMARY

Month: May, 1982 McGuire 1 began the month of May at 50% reactor power awaiting further analysis of the steam generator condition. On May 21, the power was increased to 75% for a thirty (30) day test run of the steam generators at this level. After comple-tion of the run, the steam generators will be inspected. No major operating problems were experienced during May.

1

MONTHLY REFUELING INFORMATION REQUEST rn r J 'e

1. Facility name: McGuire Unit 1 .
2. Scheduled next refueling shutdown: June, 1983 ,
3. Scheduled restart following refueling: .
4. Will refueling or resu=ption of operation thereafter require a technical specification change or other license amendment? .

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed saf ety questions $ N/A .

If no, when is review scheduled? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion : N/A .
6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A
7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 27 ,
8. Present licensed fuel pool capacity: 500 ,

Size of requested or planned increase: .

9. Projected date of last refueling which can be accoccodated by present licensed capacity:

June 15, 1982 DUKE PCWER COPTAlnf Date: .

Name of

Contact:

J. A. Reavis

=

,=

3

\

McGUIRE NUCLEAR STATION Operating Status Report

1. Personnel Exposure For the month of April, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2. The total station liquid release contribution to whole body dose for April has been compared with the Technical Specifications annual value of 3 mrem; the total release for April was less-than 10 percent of this limit.

The total station gaseous release contribution to any organ dose for April has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for April was less than 10 percent of this limit. ,