- m..,
VERMONT YAN KEE NUCLEAR POWER CORPORATION SEVENTY SEVEN GROVE STREET 2.C.2.1 RUTLAND, VERMONT 05701 FVY 82-70 REPLY TO:
ENGINEERING OFFICE 1671 WORCESTER ROAD FR AMINGH AM, M ASSACHUSETTS o17o1 TELEPHONE 817 872-8100 June 15, 1982 U.S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406 Attention:
George H. Smith, Director Division of Emergency Preparedness and Operational Support
References:
a)
License No. DPR-28 (Docket 50-271) b)
USNRC Letter to VYNPC, G.H. Smith to E.W. Jackson, dated April 28, 1982
Dear Sir:
Subject:
Emergency Preparedness - Augmentation Capabilities Reference (b) requested Vermont Yankee to perform a study to determine how the intent of the augmentation' goals of NUREG 0654, Table B-1, can be achieved.
Subsequent to implementing our backshif t call-in method, as required by Item 8 of Reference (b), notification drills were conducted to evaluate the effectiveness of our program.
Results from these tests generally indicate that sufficient staff augmentation can be achieved to meet the criteria specified in NUREG-0654, Table B-1.
The results from our three drills are shown on the attached Table 1.
Vermont Yankee is continuing to investigate other possible methods to facilitate the call-in procedure and result in earlier response times.
Included in this investigation is a review of the assignment /
utilization of radio-activated pagers and a review of the capabilities of a new telephone system which is to be installed in the next 6-12 months.
We trust this information will be satisfactory for your review; however, should you have any questions or need further clarification of our position, please contact us.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION b<3/
E. W JMson Manager of Operations 8206210283 820615 PDR ADOCK 05000271 PDR p _ _ - - _
TABLE 1 Backshift Augmentation Test Summary FUNCTION DEMONSTRATED RESPONSE
- DESCRIPTION 30 min 60 min Total Notification /
3/1/1 6/7/2 9/8/3 Communication Sr. Mgr. EOF 2/1/1 0/0/1 2/1/2 Sr. HP Expertise 1/1/1 1/0/0 2/1/1 Off-site 3/5/2 4/2/5 7/7/7 Survey Team On-site Surveys 1/1/1 1/1/1 2/2/2 (out of plant)
In-plant Survey 1/1/1 1/1/1 2/2/2 Chem Techs 0/0/0 2/1/1 2/1/1 Core Thermal 1/1/1 2/0/0 3/1/1 Hydraulics Eng.
Electrical Eng.
0/1/0 1/0/1 1/1/1 Mechanical Eng.
0/0/0 2/1/1 2/1/1 Mechanical Maint.
0/1/0 0/3/1 0/4/1 Electrical Maint.
0/0/0 1/1/1 1/1/1 1 & C Tech.
1/1/1 5/5/0 6/6/1 Radiation 1/1/0 3/3/4 4/4/4 Protection Radwaste Operator 0/0/0 7/4/1 7/4/1 TOTAL 14/15/9 36/29/20 50/44/29 Additional Personnel responding within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 8/28/28
- Drill Dates:
June 4, 5, and 7, 1982 NOTE:
During the drill on 6/4/82, the Maintenance Department was not informed to implement their fanout procedure.