Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-82-315, Interim Deficiency Rept Re Failure of Reactor Water Cleanup Sys,Initially Reported 820507.Design Change Implemented for Unit 1 & Proper Design Interface Pursued for Unit 2 to Prevent Recurrence.Also Reportable Per Part 21 for Unit 1 + (21:11:12, 17 December 2024)
- ML20055A983 + (21:11:13, 17 December 2024)
- ML20055A980 + (21:11:14, 17 December 2024)
- ML20055A982 + (21:11:14, 17 December 2024)
- ML20055A977 + (21:11:18, 17 December 2024)
- ML20055A978 + (21:11:18, 17 December 2024)
- ML20055A976 + (21:11:19, 17 December 2024)
- ML20055A974 + (21:11:19, 17 December 2024)
- ML20055A973 + (21:11:20, 17 December 2024)
- ML20055A972 + (21:11:20, 17 December 2024)
- ML20055A971 + (21:11:21, 17 December 2024)
- ML20055A967 + (21:11:27, 17 December 2024)
- ML20055A964 + (21:11:29, 17 December 2024)
- ML20055A965 + (21:11:29, 17 December 2024)
- ML20055A962 + (21:11:30, 17 December 2024)
- ML20055A961 + (21:11:31, 17 December 2024)
- TXX-3542, Forwards Drawing Providing Exact Location of Containment High Range Radiation Monitors,Per SER Open Item II.F.1 + (21:11:32, 17 December 2024)
- ML20055A957 + (21:11:33, 17 December 2024)
- ML20055A958 + (21:11:33, 17 December 2024)
- 05000416/LER-1982-002, Forwards LER 82-002/01T-0 + (21:11:40, 17 December 2024)
- 0CAN078203, Suppls & Confirms 820630 Telcon W/Nrc & Franklin Research Ctr Re Remaining Open Items of IE Bulletin 80-11, Masonry Wall Design. Walls Originally Determined Inaccessible Surveyed + (21:11:40, 17 December 2024)
- ML20055A951 + (21:11:42, 17 December 2024)
- 05000311/LER-1982-049, Forwards LER 82-049/03L-0.Detailed Event Analysis Encl + (21:11:46, 17 December 2024)
- 05000029/LER-1982-016-03, /03L-0:on 820611,during Troubleshooting of Malfunction Inside Vaporizer Concentrate Air Particulate Monitor,Signal Cable for Outside Monitor Disconnected.Caused by Personnel Error.Signal Cable Reconnected + (21:11:48, 17 December 2024)
- RBG-12-993, Final Deficiency Rept DR-38 Re Difference Found in Serration Patterns of PS-10RS Spring Nuts When Compared to Previously Supplied Nuts,Initially Reported 820223.All PS-10RS-1/2 (Types a & B) Installed on PS-280ST Will Be Replaced + (21:11:49, 17 December 2024)
- 05000281/LER-1982-037, Forwards LER 82-037/03L-0 + (21:11:53, 17 December 2024)
- 05000029/LER-1982-016, Forwards LER 82-016/03L-0 + (21:11:56, 17 December 2024)
- TXX-3541, Interim Deficiency Rept Re Westinghouse RCS Wide Range Pressure Measurements,Initially Reported 820408.Evaluation in Progress.Next Rept Will Be Provided by 820917 + (21:11:56, 17 December 2024)
- ML20055A939 + (21:11:58, 17 December 2024)
- 05000293/LER-1982-019, Forwards LER 82-019/03L-0 + (21:12:02, 17 December 2024)
- ML20055A935 + (21:12:03, 17 December 2024)
- 05000336/LER-1982-024, Forwards LER 82-024/03L-0 + (21:12:05, 17 December 2024)
- TXX-3536, Provides Info Re Containment Spray Sys Switchover Analysis. Pressure Loss Calculations Reviewed & Tests Performed Using Crane Flow Manual & Actual Piping Configuration for Containment Spray Sys + (21:12:07, 17 December 2024)
- ML20055A925 + (21:12:08, 17 December 2024)
- ML20055A921 + (21:12:08, 17 December 2024)
- ML20055A919 + (21:12:09, 17 December 2024)
- ML20055A917 + (21:12:09, 17 December 2024)
- ML20055A914 + (21:12:11, 17 December 2024)
- ML20055A911 + (21:12:12, 17 December 2024)
- ML20055A913 + (21:12:12, 17 December 2024)
- ML20055A910 + (21:12:13, 17 December 2024)
- ML20055A909 + (21:12:13, 17 December 2024)
- ML20055A908 + (21:12:15, 17 December 2024)
- ML20055A906 + (21:12:16, 17 December 2024)
- ML20055A907 + (21:12:16, 17 December 2024)
- ML20055A905 + (21:12:18, 17 December 2024)
- ML20055A902 + (21:12:19, 17 December 2024)
- ML20055A903 + (21:12:19, 17 December 2024)
- ML20055A901 + (21:12:20, 17 December 2024)
- 05000029/LER-1982-017-03, /03L-0:on 820611,NRV Channel B Trip Circuit to NRV-2 Became Inoperable Causing Reduction in Reactor Protective Sys Instrumentation.Caused by Failure of Faulty Fusetron 2 Amp Indicating Fuse.Fuse Replaced + (21:12:21, 17 December 2024)
- 05000029/LER-1982-017, Forwards LER 82-017/03L-0 + (21:12:23, 17 December 2024)