Monthly Operating Rept for June 1982
ML20055A921
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/06/1982
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20055A920 List:
References
NUDOCS 8207200131
Download: ML20055A921 (7)


Text

E i

OPERATING DATA REPORT I

DOCKET NO. 50-364 8

' DATE 7/06/82 LOMPLETED i1Y G Hairston III

,' TELEP110NE $TT99-5155 OPERATING STAT US Te nh M. Notes

1. Unit Name
1:'nriev Unit II
2. Reporting Period: June. 1982 2652 1) Cumulativedata since

, 3. Licensed Thermal Power (MWI): 7/30/81, date of cone-

4. Nameplate Rating (Gross MWe): R60 mercial operation S. Design Electrical Rating (Net MWe): R?o
6. Maximum Dependable Capacity (Gross MWe): 854.7
7. Masimum Dependable Capacity (Net MWe): 811.7
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Gise Reasons:

N/A

9. Power Lesel To Which Restricted.If Any (Net MWe):

!^

10. Reasons For Restrictions,1f Any: .N/A i

4 This Month Yr..to Date Cumulatise

11. Ilours in Reporting Period 0 4343 8064
12. Number Of flours Reactor Was Critical 720 3A1A R 7117.0
13. Reactor Resene Shutdown flours 0 71_n -111.8 ,
14. Ilours Generator On-Line 720 1551.5 7??n O
15. Unit Resene Shutdown Hours n 0 0
16. Gross Thermal Energy Generated (MWil) 1.836.202 8.864.930 1R.331.087 17 Gross Electrical Energy Generated (MWill ___.585.148 2.843,240 s_414_618
18. Net Electrical Energy Generated (MWil) 555.884 2.687.130 5 607.850
19. Unit Senice Factor ice,9 81.8 89.5 l
20. Unit Asailability Factor 100.0 R1.R R9.5

' 21. Unit Capacity I' actor (Using MDC Net) 94.9 7A_n 85.5

22. Unit Capacity Factor (Using DER Net) 93.1 74.6 83.9 21 Unit Forced Outage Rate 0.0 18.2 10.5
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Eacht:

Refueling Outage; October 22, 1982; Approximately 6 weeks.

25. If Shut Down At End Of Heport Period. Estimated Date of Startup: N/A 2tn. Units in lest Status (Prior to Commercial Operation): Forecast Achiesed INill A L CRITICA LII Y 5/6/81 5/8/81 INITI AL ELLCIRICITY 5/24/81 5/25/81 \

COMMERCI A L Ol'ER A flON 8/1/81 7/30/81 4

(9/77 )

8207200131 820712 PDR ADOCK OSOOOg R

DOCKET NO. sn_v A trNIT J. M. Ftrisy-Unit II DAlT. 7/06/82 COSIPLETED BY W. C. Hnfrston, III s' IILEPl!ONE (?nsi 809-5156 510f(111 DAY AVEllAGE DAILY POhEit LEVEL . DAY AVER AGE DAILY POWER LEVEL (Mbe Net) (MWe Net) g, 799 37 530 ,

2 808 -

[3 528 3 803 39 551 4 7R1 20 778 .

3 Rn7 21 800 6 R1A 22 nni 7 R1A 23 803

]'

g 811 24 806 9 __80R 25 804 10 ani 26 769 11 781 27 801 12 802 23 801 ,

l3 802 ;9 801 14 Ana 30 798 15 803 33 16  : 749 ,

I INSTRUCl!ONS ,

On this formst. list the average daily umt power levelin MWe Net for each d;y in the reporting inunth. Compute to

, the neare t whole nr:;2w.att.

I s

a (9p7) . i etQ e e

~

4  %

l

. _ neo go e

    • Q.- ",

s

\ . .

-) J UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- W.

UNIT NAME T- M rn vi m t',it II DATE 7/06/97 COMPLETED BY t' c u,4veenn, III REPORT MONTH June, 1982 TELEPHONE nn53 noo_575g w.

c r. $ wE 'n c

No. Date 1y h _I gj

! 3g3x5b 0

Event y,?

g4 g

Cause & Corrective Action to 0-

  • jey Report a _

v) O g Prcvent Recurrence 5

010

  • 820617 S 0 B NA NA HC HTEXCH Powr reduced to 71% for investi-gation and repair of condenser tube leaks, i

l l

l l

I 2 3 4

! F: Forced Reason: Method: Exhibit G Instructions l S: Scheduled A Equipsnent Failure (Explain) l-Manual for Pseparation of Data B Maintenance or Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event ReporI(LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination i

F-Administrative 5 G-Operational Esrur (Explain) Exhibit I Same Source (9/77) Il-Other (E xplain) i t_______

e 4

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS .

JUNE, 1982 There was one (1) power reduction in the month of June.

The following safety-related maintenance was performed in the month of June:

1. Performed miscellaneous maintenance on diesel generators
2. Repaired reactor makeup water discharge pipe to prevent leakage
3. Repaired 2B BIT Recirculation Pump to prevent leakage
4. Replaced grounded cable on #7 River Water Pump 1

l l

l l

I

I 1

OP8 RATING DATA RLPORT I DOCKET NO. 50-364 8; DATE .ll_Q6/82 COMPLETED liY LG. Hairston III

,' TELEPilONE (205FBV9-5155 l

I' OPERATING STA1US .

Notes

I. Unit Name
.Jncoph M. T'nriey Unit II

'P"'""8 'I" "" 1) Cumulativedata since

, 3. Licenwd Thennal Power (MWt): 2652 7/30/81, date of com-

4. Nameplate Rating (Gross MWe): R60 mercial operation
5. Design Electrical Rating (Net MWe): A70
6. Masimum Dependable Capacity (Gross MWe): 854.7 l 7. Masimum Dependable Capacity (Net MWe): 813.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report,Gise Reamns:

N/A

9. Power Lesel To Which Restricted. If Any (Net .ilWe):

^

10. Reawns For Restrictions.If Any: .N/A 1

This Month Yr..t o-Da t e Cumulatise 7 4343 8064 I1. Ilours in Reporting Period

! 12. Number Of Ilours Reactor Was Critical 720 7317.0 363A R

13. Reactor Resene Shutdown flours 0 71.n 111.8 ,
14. Ilours Generator On-Line 720 1ss3d 7??n 0

. 15. Unit Resene Shutdown flours n 0 0

16. Gross Thermal Energy Generated (MWil) 1.83f. 202 _B H64,930 1R,331,087
17. Gross Electrical Energy Generated (MWil) 535J48 _ , . 2,843,240 ;3414 618
18. Net Electrical Energy Generated (MWil) 555.884 2,687.130 5.607.850
19. Unit Senice Factor ice,9 81.8 89.5 e
20. Unit Asailability Factor 100.J) R1 R 89.5 j 21. Unit Capacity Factor (Using MDC Net) 94 9 7A.n 85.5 l 22. Unit Capacity Factor (Using DER Net) 93.1 74.6 83.9
23. Unit Forced Outage Rate 0.0 18.2 10.5
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Eacht:

Refueling Outage; October 22, 1982; Approximately 6 weeks.

25. If Shut Down At End Of Report Period.lXtimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed r

1 .

INITI A L CRITICALITY 5/6/81 5/F/81 '

l INiilAL ELECIRICITY 5/24/S1 5/25/81 COMMERCI AL OPER ATION 8/1/81 7/30/81 No '

(9/77)

DOCKET T40. sn_3A A

  • '* (JNIT J. M. Fzriny-Unit II
  • D Aly, 7/06/82 COSIPLETED DY E. C. Itairston, III i 1ELEPil0NE , (2ns) Aqq-sis 6 MONTil DAY AVEllAGE D/.lLY POWEit LEVEL DAY AVER AGE D AILY POWER LEVEL (5114e Net) ($1We Net) 799 530 g, 37 808 -

IG 528 2 .

19 551 3 __ 801 7R1 20 778 4

21 800 5 _ Rn7 6 Al^ 22 Ani 23 803 7 Ala .

811 24 806

]

~

g 804 9 _ RnR 25

  • An1 G 769 10 ,

7R1 27 801

' II 802 28 801 ,

12 802 ;9 801 13 .

Roa jn 798 14 15 803 33 16 ;_ 749 INSTRUCllONS ,

On this formar. list the aversge daily unit power levet in MWe Net for each d:y in the reporting snunth.Cornpute to

, the nease:t whole nepwait. .

. (907)  :

d n ... _ ,n. . _ , . ~ ~ - -

\ ,y m ,

n s rI UNITSilUTDOWNS AND POWER REDUC 110NS DOCKEYNO. 50-164 UNiTNAME T v r=riou itnit II '

DATE 7 /06 / R?

COMPLETED BY t.'

REPORT MONTH June, 1982 c n u vann , 111 TELEPHONE onu naa _Si u e.

e c. 's u 5 E E '3.gg Lie se E

% g*. Cause & Currective N"' D" E.

'y .a .c s e g

oO 3

E j ifi y Even' Report # ,

y,T m0 Q g

Action to Picvent Recurrence 5

010 ,

820617 S 0 B NA NA HC HTEXCH Power reduced to 71% for investi-gation and repair of condenser tube leaks.

l i l I

I 2 3 4 F: Forced Reason: Method:

S: Scheduled . Exhibit C -Instsuctions A-Equipment Failure (Explair.) .

I-Manual for Preparation of Data B. Maintenance of Test 2. Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Repors (LER) File INUREG-D. Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational En ror (Explain) Exhibit I - Same Source (9/77) 110 her(Explain) .