Monthly Operating Rept for June 1982
ML20055A921
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/06/1982
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20055A920 List:
References
NUDOCS 8207200131
Download: ML20055A921 (7)


Text

E i

OPERATING DATA REPORT I

DOCKET NO.

50-364 8

DATE 7/06/82 LOMPLETED i1Y G Hairston III TELEP110NE

$TT99-5155 OPERATING STAT US Notes

1. Unit Name:

Te nh M.

1:'nriev Unit II

2. Reporting Period: June. 1982 1)

Cumulativedata since

3. Licensed Thermal Power (MWI):

2652 7/30/81, date of cone-

4. Nameplate Rating (Gross MWe):

R60 mercial operation S. Design Electrical Rating (Net MWe): R?o

6. Maximum Dependable Capacity (Gross MWe):

854.7

7. Masimum Dependable Capacity (Net MWe):

811.7

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Gise Reasons:

N/A

!^

9. Power Lesel To Which Restricted.If Any (Net MWe):
10. Reasons For Restrictions,1f Any:

.N/A i

4 This Month Yr..to Date Cumulatise 0

11. Ilours in Reporting Period 4343 8064
12. Number Of flours Reactor Was Critical 720 3A1A R 7117.0
13. Reactor Resene Shutdown flours 0

71_n

-111.8

14. Ilours Generator On-Line 720 1551.5 7??n O
15. Unit Resene Shutdown Hours n

0 0

16. Gross Thermal Energy Generated (MWil) 1.836.202 8.864.930 1R.331.087 17 Gross Electrical Energy Generated (MWill

___.585.148 2.843,240 s_414_618

18. Net Electrical Energy Generated (MWil) 555.884 2.687.130 5 607.850 81.8 89.5
19. Unit Senice Factor ice,9 l
20. Unit Asailability Factor 100.0 R1.R R9.5

' 21. Unit Capacity I' actor (Using MDC Net) 94.9 7A_n 85.5

22. Unit Capacity Factor (Using DER Net) 93.1 74.6 83.9 21 Unit Forced Outage Rate 0.0 18.2 10.5
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Eacht:

Refueling Outage; October 22, 1982; Approximately 6 weeks.

25. If Shut Down At End Of Heport Period. Estimated Date of Startup:

N/A 2tn. Units in lest Status (Prior to Commercial Operation):

Forecast Achiesed INill A L CRITICA LII Y 5/6/81 5/8/81 INITI AL ELLCIRICITY 5/24/81 5/25/81

\\

COMMERCI A L Ol'ER A flON 8/1/81 7/30/81 4

(9/77 )

8207200131 820712 PDR ADOCK OSOOOg R

DOCKET NO.

sn_v A trNIT J. M. Ftrisy-Unit II DAlT. 7/06/82 COSIPLETED BY W.

C. Hnfrston, III s'

IILEPl!ONE (?nsi 809-5156 510f(111 DAY AVEllAGE DAILY POhEit LEVEL.

DAY AVER AGE DAILY POWER LEVEL (Mbe Net)

(MWe Net) g, 37 530 799

[3 528 2

808 3

803 39 551 4

7R1 20 778 3

Rn7 21 800 6

R1A 22 nni 7

R1A 23 803

]

g 811 24 806 9

__80R 25 804 10 ani 26 769 11 781 27 801 12 802 23 801 801 l3 802

9 798 14 Ana 30 15 803 33 16
749 I

INSTRUCl!ONS On this formst. list the average daily umt power levelin MWe Net for each d;y in the reporting inunth. Compute to

, the neare t whole nr:;2w.att.

I s

a (9p7)

. i tQ e.,

e e

~

4 l

neo go e

    • Q.-

s

\\

-)

J UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50- W.

UNIT NAME T-M rn vi m t',it II DATE 7/06/97 REPORT MONTH June, 1982 COMPLETED BY t'

c u,4veenn, III TELEPHONE nn53 noo_575g w.

$ wE c

c r.

No.

Date 1

h _I 3 5b g4 Cause & Corrective

'n y

gj 0

g3x Event y,?

g Action to jey Report a g

Prcvent Recurrence v) O 0-5 010 820617 S

0 B

NA NA HC HTEXCH Powr reduced to 71% for investi-gation and repair of condenser tube leaks, i

l l

l l

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions l

S: Scheduled A Equipsnent Failure (Explain) l-Manual for Pseparation of Data B Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event ReporI(LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

i G-Operational Esrur (Explain)

Exhibit I Same Source (9/77)

Il-Other (E xplain) i t_______

e 4

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS JUNE, 1982 There was one (1) power reduction in the month of June.

The following safety-related maintenance was performed in the month of June:

1.

Performed miscellaneous maintenance on diesel generators 2.

Repaired reactor makeup water discharge pipe to prevent leakage 3.

Repaired 2B BIT Recirculation Pump to prevent leakage 4.

Replaced grounded cable on #7 River Water Pump 1

l l

l l

I

I 1

OP8 RATING DATA RLPORT I

DOCKET NO.

50-364 8;

DATE.ll_Q6/82 COMPLETED liY LG. Hairston III TELEPilONE (205FBV9-5155 l I' OPERATING STA1US Notes I. Unit Name:.Jncoph M.

T'nriey Unit II

'P"'""8

'I" 1)

Cumulativedata since

3. Licenwd Thennal Power (MWt):

2652 7/30/81, date of com-

4. Nameplate Rating (Gross MWe):

R60 mercial operation

5. Design Electrical Rating (Net MWe): A70
6. Masimum Dependable Capacity (Gross MWe):

854.7 l

7. Masimum Dependable Capacity (Net MWe):

813.7

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report,Gise Reamns:

N/A

^

9. Power Lesel To Which Restricted. If Any (Net.ilWe):
10. Reawns For Restrictions.If Any:

.N/A 1

This Month Yr..t o-Da t e Cumulatise 7

I1. Ilours in Reporting Period 4343 8064 720

12. Number Of Ilours Reactor Was Critical 363A R 7317.0
13. Reactor Resene Shutdown flours 0

71.n 111.8

14. Ilours Generator On-Line 720 1ss3d 7??n 0
15. Unit Resene Shutdown flours n

0 0

16. Gross Thermal Energy Generated (MWil) 1.83f. 202

_B H64,930 1R,331,087

17. Gross Electrical Energy Generated (MWil) 535J48 _,.

2,843,240

3414 618
18. Net Electrical Energy Generated (MWil) 555.884 2,687.130 5.607.850 81.8 89.5
19. Unit Senice Factor ice,9 e
20. Unit Asailability Factor 100.J)

R1 R 89.5 j

21. Unit Capacity Factor (Using MDC Net) 94 9 7A.n 85.5 93.1 74.6 83.9 l
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 18.2 10.5
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Eacht:

Refueling Outage; October 22, 1982; Approximately 6 weeks.

25. If Shut Down At End Of Report Period.lXtimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed r

1 INITI A L CRITICALITY 5/6/81 5/F/81 l

INiilAL ELECIRICITY 5/24/S1 5/25/81 COMMERCI AL OPER ATION 8/1/81 7/30/81 No (9/77)

DOCKET T40.

sn_3A A (JNIT J. M. Fzriny-Unit II D Aly, 7/06/82 COSIPLETED DY E. C. Itairston, III i

1ELEPil0NE, (2ns) Aqq-sis 6 MONTil DAY AVEllAGE D/.lLY POWEit LEVEL DAY AVER AGE D AILY POWER LEVEL (5114e Net)

($1We Net) 799 37 530 g,

IG 528 2

808 3

__ 801 19 551 4

7R1 20 778 5

_ Rn7 21 800 6

Al^

22 Ani 803 7

Ala 23 g

811 24 806

]

9

_ RnR 25 804

~

10 An1 G

769 27 801

' II 7R1 12 802 28 801 801 13 802

9 798 14 Roa jn 15 803 33 16
_ 749 INSTRUCllONS On this formar. list the aversge daily unit power levet in MWe Net for each d
y in the reporting snunth.Cornpute to

, the nease:t whole nepwait.

(907) d

. _,. ~ ~ - -

... _,n.

n

\\

,y rI m

n s

UNITSilUTDOWNS AND POWER REDUC 110NS DOCKEYNO.

50-164 UNiTNAME T v

r=riou itnit II DATE 7 /06 / R?

REPORT MONTH June, 1982 COMPLETED BY t.'

c n u vann, 111 TELEPHONE onu naa _Si u e.

's u 5 E

e c.

E

'3.gg Lie se E%

g*.

Cause & Currective N"'

D"

E.g

'y.a 3

.c s e Even' y,T Q

Action to m0 j ifi y Report #

g Picvent Recurrence oO E

5 010 820617 S

0 B

NA NA HC HTEXCH Power reduced to 71% for investi-gation and repair of condenser tube leaks.

l i

l I

I 2

3 4

F: Forced Reason:

Method:

. Exhibit C -Instsuctions S: Scheduled A-Equipment Failure (Explair.)

I-Manual for Preparation of Data B. Maintenance of Test

2. Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Repors (LER) File INUREG-D. Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational En ror (Explain)

Exhibit I - Same Source (9/77) 110 her(Explain)

.