- 05000443/LER-1993-014, :on 930824,Channel Check Requirements for TS 4.3.2.1,Table 4.3-2,Functional Unit 8.b Not Satisfied for RWST Transmitters.Cause Not Determined.Performed Tadot on RWST Transmitters + (13:03:16, 17 December 2024)
- ML20058M475 + (13:03:18, 17 December 2024)
- 05000346/LER-1993-007, :on 931020,after Preventive Maint,Determined Train of AFW & Motor Driven Feedwater Pump Incapable of Feeding SG 1 Should SG 2 Fail.Caused by Misunderstanding of AFW Sys.C/A:Review Chapter 15 of USAR + (13:03:19, 17 December 2024)
- ML20058M472 + (13:03:21, 17 December 2024)
- ML20058M471 + (13:03:22, 17 December 2024)
- ML20058M470 + (13:03:23, 17 December 2024)
- ML20058M469 + (13:03:24, 17 December 2024)
- ML20058M467 + (13:03:29, 17 December 2024)
- 0CAN099304, Provides Update on Progress of Historical Review Project. Correspondence from 1980 to Present Has Been Clarified or Changed + (13:03:31, 17 December 2024)
- ML20058M466 + (13:03:31, 17 December 2024)
- U-602189, Follow-up Special Rept on Progress of Investigation Into Diesel I DG Test Failures That Occurred on 930623,0721 & 0803.Current Number of Valid Failures in Last 100 Valid Tests of DG1A Is Seven.Testing for DG1A Conducted + (13:03:33, 17 December 2024)
- ML20058M464 + (13:03:33, 17 December 2024)
- ML20058M462 + (13:03:34, 17 December 2024)
- ML20058M460 + (13:03:37, 17 December 2024)
- 05000423/LER-1993-014-01, :on 930903,determined That Delayed Start of Train a Auxiliary Bldg Fan During Testing Due to Inherent Design Characteristics of Flow Switch.Design Changed to Provide Uninterruptible Source of Power + (13:03:38, 17 December 2024)
- ML20058M454 + (13:03:46, 17 December 2024)
- ML20058M452 + (13:03:47, 17 December 2024)
- ML20058M449 + (13:03:49, 17 December 2024)
- 05000295/LER-1993-008-05, :on 930823,residual Heat Removal Sys Taken Out of Svc for Control Ctr Breaker Insp.Work Mistakenly Logged Completed Though Sys Still Out of Svc.Caused by Mgt Deficiency.Periodic Test (PT-14) Changed + (13:03:53, 17 December 2024)
- ML20058M447 + (13:03:55, 17 December 2024)
- ML20058M445 + (13:03:56, 17 December 2024)
- ML20058M443 + (13:03:57, 17 December 2024)
- BSEP-93-0227, Forwards Rev 1 to GE Rept GE-NE-523-143-1093, Brunswick Unit 1 Shroud Repair Hardware Stress Analysis, in Response to NRC Request Made at 931130 Meeting Re non-limiting Loads Resulting from Annulus Pressurization Events + (13:03:58, 17 December 2024)
- IR 05000354/1990013 + (13:03:58, 17 December 2024)
- ML20058M437 + (13:03:59, 17 December 2024)
- ML20058M436 + (13:04:00, 17 December 2024)
- ML20058M434 + (13:04:04, 17 December 2024)
- ML20058M433 + (13:04:05, 17 December 2024)
- B13598, Proposed Tech Specs Re Removal of cycle-specific Parameter Limits + (13:04:06, 17 December 2024)
- ML20058M428 + (13:04:06, 17 December 2024)
- 05000483/LER-1993-005, :on 931114,ESF Actuation on High S/G Occurred. Caused by S/G Level Allowed to Be Taken Too Close to High Level Setpoint.Procedure Will Be Revised & Licensed Operators Will Receive Addl Training + (13:04:08, 17 December 2024)
- 05000285/LER-1993-015, :on 931109,emergency Boration of RCS Was Initiated Due to Induced Electrical Noise.Performed Maint on WR Nuclear Instrumentation Channels a & D + (13:04:11, 17 December 2024)
- IR 05000416/1990012 + (13:04:13, 17 December 2024)
- ML20058M423 + (13:04:14, 17 December 2024)
- 05000289/LER-1993-009, :on 931112,motor Operator Failure Occurred Due to Improper Declutch Lever Installation.Eight Nuclear Safety Related Limitorque Size Smb 000 MOVs Modified W/New Balanced Declutch Levers + (13:04:15, 17 December 2024)
- ML20058M419 + (13:04:17, 17 December 2024)
- ML20058M418 + (13:04:18, 17 December 2024)
- LD-93-174, Responds to Request of NRC Staff & Forwards Five Copies of Selected CESSAR-DC Parameters & Assumptions Addressed in Certified Design Matl for System 80+ Standard Plant Design + (13:04:26, 17 December 2024)
- ML20058M412 + (13:04:26, 17 December 2024)
- ML20058M411 + (13:04:27, 17 December 2024)
- ML20058M410 + (13:04:28, 17 December 2024)
- IR 05000374/1993025 + (13:04:29, 17 December 2024)
- ML20058M407 + (13:04:36, 17 December 2024)
- ML20058M406 + (13:04:37, 17 December 2024)
- ML20058M405 + (13:04:37, 17 December 2024)
- ML20058M404 + (13:04:39, 17 December 2024)
- ML20058M402 + (13:04:40, 17 December 2024)
- ML20058M401 + (13:04:40, 17 December 2024)
- 3F0993-10, Responds to GL 89-10,suppl 5, Inaccuracy of MOV Diagnostic Equipment, Re Confirmation of Proper Size or to Establish Settings for MOV + (13:04:41, 17 December 2024)
- ML20058M398 + (13:04:43, 17 December 2024)
- 05000254/LER-1993-002-01, :on 930302,determined Average .25 Inches of Water Cannot Be Maintained in Secondary Containment Per Ts. Caused by Testing Deficiency.Procedure Qts 160-5 Will Be Changed to Adjust for Test Deficiency + (13:04:45, 17 December 2024)