Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20062L733 + (03:30:14, 17 December 2024)
- ML20062L734 + (03:30:14, 17 December 2024)
- ML20062L730 + (03:30:15, 17 December 2024)
- RBG-13-080, Responds to NRC Re Violations Noted in IE Insp Rept 50-458/82-05.Corrective Actions:Weld Technique Sheet W3-NSSS-54 Corrected to Reflect Min Travel Speed Used & Personnel Reinstructed Re Weld Orientation & Matl Control + (03:30:16, 17 December 2024)
- ML20062L720 + (03:30:16, 17 December 2024)
- 05000361/LER-1993-010, :on 931122,Train a ECCS Declared Inoperable Due to Configuration of Containment Sump Cover Plate.Debris Limiting Collar Promptly Installed Around LTOP Pipe Penetration of Train a Sump Cover Plate + (03:30:18, 17 December 2024)
- ML20062L712 + (03:30:19, 17 December 2024)
- ML20062L708 + (03:30:20, 17 December 2024)
- ML20062L704 + (03:30:20, 17 December 2024)
- ML20062L700 + (03:30:21, 17 December 2024)
- ML20062L699 + (03:30:22, 17 December 2024)
- ML20062L694 + (03:30:22, 17 December 2024)
- 05000266/LER-1993-009, :on 931202,EDG G02 Declared Inoperable Due to Relay Malfunction in One of Redundant Starting Circuits. Testing & Insp of STLO-2 Relay Ongoing to Improve Understanding of Root Cause of Failure + (03:30:24, 17 December 2024)
- ML20062L691 + (03:30:25, 17 December 2024)
- ML20062L687 + (03:30:26, 17 December 2024)
- ML20062L684 + (03:30:26, 17 December 2024)
- ML20062L679 + (03:30:27, 17 December 2024)
- ML20062L678 + (03:30:28, 17 December 2024)
- ML20062L675 + (03:30:28, 17 December 2024)
- ML20062L669 + (03:30:29, 17 December 2024)
- ML20062L671 + (03:30:29, 17 December 2024)
- 05000293/LER-1993-027, :on 931106,discovered That Action Statment of TS Table 3.2.C-1 (Rod Block) Not Taken on at Least Two Occasions Due to Change to SRM Functional Test Procedure in 1991.Procedure 8.M.2-3.3 Will Be Revised + (03:30:31, 17 December 2024)
- ML20062L663 + (03:30:32, 17 December 2024)
- ML20062L656 + (03:30:32, 17 December 2024)
- ML20062L655 + (03:30:33, 17 December 2024)
- 05000324/LER-1993-011-02, :on 931122,emergency Bus Feeder Breaker Trip Resulted in Containment Isolation Signals.Cause Unknown.No Corrective Actions Necessary + (03:30:34, 17 December 2024)
- ML20062L653 + (03:30:35, 17 December 2024)
- ML20062L650 + (03:30:36, 17 December 2024)
- ML20062L649 + (03:30:36, 17 December 2024)
- ML20062L648 + (03:30:38, 17 December 2024)
- 05000278/LER-1993-010-03, :on 931201,TS Required Shutdown Initiated Due to Failed Residual Heat Removal Sys Valve.Caused by Bent Valve Stem on MO-3-10-025A.RHR Loop Injection Valve Was Dissassembled & New Valve Stem Installed + (03:30:39, 17 December 2024)
- 05000277/LER-1993-015-01, :on 931201,TS Violation Occurred Due to Improperly Secured Main Stack Particulate Filter.Filters Changed & Gas Marnelli Samples Obtained to Identify & Quantify Nuclides in Main Stack Effluent + (03:30:41, 17 December 2024)
- ML20062L638 + (03:30:42, 17 December 2024)
- 05000302/LER-1993-010, :on 931130,routine Surveillance Status Inquiry Revealed That Weekly Battery Surveillance Had Not Been Performed.Caused by Cognitive Personnel Error.Surveillance Sucessfully Performed + (03:30:44, 17 December 2024)
- ML20062L636 + (03:30:45, 17 December 2024)
- ML20062L626 + (03:30:46, 17 December 2024)
- ML20062L629 + (03:30:46, 17 December 2024)
- 05000443/LER-1993-021, :on 931117,control Room Emergency Air Cleanup & Filtration Subsystem Became Inoperable Due to Equipment Failure.Replaced Train B Emergency Filtration Heater W/Train a Emergency Filtration Unit + (03:30:48, 17 December 2024)
- ML20062L622 + (03:30:49, 17 December 2024)
- ML20062L617 + (03:30:50, 17 December 2024)
- ML20062L616 + (03:30:51, 17 December 2024)
- 05000416/LER-1993-017, :on 931126,reactor Pressure Exceeded Limit Specified by TS 3.7.3 W/Rcic Inoperable,Resulting in Noncompliance W/Ts 3.0.4.Caused by Personnel Error.Personnel Involved in Event Counseled + (03:30:52, 17 December 2024)
- ML20062L614 + (03:30:53, 17 December 2024)
- ML20062L611 + (03:30:54, 17 December 2024)
- 05000321/LER-1993-015, :on 931128,high Pressure Coolant Injection Sys Experienced Momentary Inoperability Due to Power Supply Transient.Hpci Sys Restored to Operable Status & Procedures Revised + (03:30:55, 17 December 2024)
- ML20062L607 + (03:30:56, 17 December 2024)
- ML20062L606 + (03:30:57, 17 December 2024)
- 05000311/LER-1982-064-03, /03L-0:on 820717,ECCS Heat Tracing Circuits 2610A & 2608B Found Reading Less than Tech Specs.Caused by Broken Wire in Circuit 2610A Control Panel.Wire Trimmed & Reconnected & Heat Tracing Circuit Replaced + (03:30:58, 17 December 2024)
- ML20062L602 + (03:30:59, 17 December 2024)
- 05000311/LER-1982-064, Forwards LER 82-064/03L-0.Detailed Event Analysis Encl + (03:31:00, 17 December 2024)
- ML20062L600 + (03:31:00, 17 December 2024)