Forwards Objectives for Annual Exercise to Be Held 820811, Per Encl 1 to FEMA Radiological Emergency Plan Guidance Memorandum 17
ML20062L648
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/02/1982
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
5211-82-164, NUDOCS 8208190186
Download: ML20062L648 (93)


Text

I g

a i

GPU Nuclear h

g g{

P.O. Box 480 Middletown, Pennsylvania 17057 717-944-7621 Writer's Direct Dial Number:

July 2, 1982 5211-82-164 Mr. R. C. Ilaynes Regional Administrator Region I U. S. Nucicar Regulatory Commusion 631 Park Avenue King of Prussia, PA 19406

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Annual Exercise In accordance with Enclosure 1 to FEMA REP Guidance Memorandum No. 17, the scenario for the 1982 Three Mile Island Nuclear Station Annual Exercise is attached for your review.

Sincerely, h 11. L. Ilukill U

Director, TMI-l llDll:GJG:vj f Enclosure cc:

J. Asher, FI21A Region III R. Conte, NRC/TMI SRI S. Eklund, NRC lleadquarters F. Pagano, NBC lleadquarters

/

8208190186 820702 b

\\( g PDR ADOCK 05000289 p

PDR GPU Nuclear is a part of the General Public Utilities System

DRILL SCENARIO 08/11/82 OBJECTIVES FOR ANNUAL EXERCISE I.

NOTIFICATION AND COMMUNICATION A.

To test and evaluate the adequacy of the TMI notification alert capabilities.

B.

To test and evaluate the ability of key TMI Emergency Response Personnel to implement notification procedures including initial and continuing notification, coordination and updating of information.

C.

To test and evaluate the ability of TMI Emergency Response Personnel to accurately and efficiently assess, classify and declare an abnomal or accident situation and disseminate vital infomation to appropriate agencies.

D.

To test and evaluate the THI Emergency Communications Systems between licensee's onsite and offsite facilities, and between licensee's facilities and outside agencies (i.e. state and local facilities).

II.

DIRECTION AND CONTROL A.

To test and evaluate the TMI Operations Staff's ability to determine the cause of the accident, terminate or limit radioactive releases, and bring the plant to a safe shutdown condition.

B.

To test and evaluate the adequacy of the TMI Unit 1 and 2 Emergency Plans and respective Implementing Procedures in tems of management and control of an emergency situation involving the entire station.

C.

To test and evaluate the licensee's capability to account for personnel inside the Protected Area and provisions to evacuate site personnel.

D.

To test and evaluate the Itcensee's capability to activate and staff all required emergency response facilities and to properly manage a station event.

E.

To ensure provisions exist for establishing and sustaining the mitigation process on a long tem basis (recovery phase, emergency staffing, etc.).

DRILL SCENARIO 08/11/82 III. ACCIDENT ASSESSMENT A.

To test and evaluate the licensee's ability to deploy radiation monitoring teams, communicate with them, and assess information received.

B.

To test and evaluate the licensee's capability to assess and determine the extent of an emergency, and make appropriate recommendations concerning protective actions.

l

[

i

.z.

(-

l t

'e DRILL SCENARIO 08/11/82 Event Actual Simulation 1.

Declaration of Emergency X

2.

Notification of Offsite Agencies X

3.

Emergency Announcements X

4.

Activation of Onsite Organization X

5.

Activation of Offsite Organization X

6.

Full Accountability X

7.

RCS Post Accident Sample X

8.

Search and Rescue X

9.

Evacuation of Personnel X

NOTE: Approx.15 personnel will be evacuated.

10.

Monitoring at Assembly Area X

11.

Contaminated Persons are Decontaminated X

at AE0F 12.

Emergency Medical Assistance to X

contaminated-injured person.

13.

Offsite Medical Response X

i r

DRILL SCENARIO 08/11/82 INITIAL CONDITIONS 1.

Reactor at 100 percent power (870 MWe)' for last.192 hours0.00222 days <br />0.0533 hours <br />3.174603e-4 weeks <br />7.3056e-5 months <br />.

2.

"C" Make-up Pump out of service for last seven (7) days due to motor speed changer problem.

3.

MU-P-1B running normal. Selected for ESAS "B" loop.

4.

ICS is in full " Auto Mode".

5.

270 EFPD cycle 5.

6.

RCS leak rate currently is 0.5 gpm.

7.

RC Drain Tank at 100" and can't be pumped.

8.

iiaintenance men are working on the seal for the inner door of the personnel access.

9.

RCS activity - 30 pc/ml.

8.

Meteorology:

Wind Speed

- 2 mgh Wind Direction

- 315 Wind range

- 80*

Vertical delta T -

(-1.1*F) f i

?

J 1

a DRILL SCENARIO 08/11/82 4

SEQUENCE OF EVENTS T = 0 " Initial Conditions" (0730)

T = 5 RC Pump Seal Leak off flow Hi/ Low ( Alarm E-1-4)

(0735)

Note:

RCS leak rate determination should begin.

T = 15 Hi Standpipe Level alarm on RCP 1A No. 2 seal (computer (0745) only ).

T = 40 RC Drain Tank high level alarm (due to RCP-1A seal).

(0810)

T = 60 RML-1 Hi and Low Channels Spike, resulting in a HIGH alarm then (0830) returns to normal.

Note:

RCS sample should be requested.

T = 65 RCS leak rate calculation shows 1 gpm.

(0835)

(M/V Tank level decreased by 2")

UNUSUAL EVENT T = 90 CAV-2's packing fails, while the RCS sample is in progress, which (0 900) releases airborne radioactivity to the Auxiliary Building.

T = 91 RMG-11 Alert alarm.

(0901)

RNA-6 Gaseous and Radioiodine Channels increasing.

RMA-8 Gaseous and Radioiodine Channels increasing.

T = 95 RMG-11 High Alarm (0905)

T = 100 RCP-1A seal fails completely -- RCS leakrate increases to 350 GPM.

(0910)

High Make-up Flow Alarm (F-1-8160 GPM).

RC Drain Tank Rupture Disc ruptures allowing pressure to increase in Reactor Building. Reactor shutdown should commence.

NOTE:

1. Dispatcher informs the Shift Supervisor:

"We will definitely have a loss of offsite power if you exceed 2 percent / min ramp down".

2. MU-Y-217 open with MU-P1A and (10-P-1B running l

DRILL SCENARIO 08/11/82 T = 105 Maintenance workers report to ECC the outer access door will not (0915) open.

NOTE:

R.B. pressure has increased and is holding the outer door shut. A purge must be started to equalize pressure so the workers can operate the airlock.

If communication is attempted with the inaintenance workers in the RB, the OSC observer will inform the OSC that they are okay but feeling faint. Workers try energency door - but it's jammed shut.

T = 110 R.B. Purge is commenced (Exhaust valves slam open).

Smoke is (0920) coming from 1A-ES Valves Motor Control Center (cannot energize because of feeder breaker damage). Offsite fire fighting assistance not required.

T = 112 OSC observer acting as one of the maintenance workers in the RB, (0922) infonns the OSC that the other worker has fainted, is bleeding and unconscious.

SITE EMERGENCY NOTE:

Accountability should commence.

T = 130 Reactor is shutdown.

(0940)

MU-V36 fails as is.

MU-V14A fails shut.

MU-V16A and B fail shut.

BS-V1A fail shut.

BS-V2A fail shut.

BS-V3A fail shut.

Note:

1. If operator attempts to cross-connect MU-P-1A, MU-V688 cannot be opened due to galled shaft.
2. Accountability indicates two (2) people are unaccounted for in the protected area and Search and Rescue should be ini tiated.

T = 140 MU-P-1B trips on low oil pressure.

Pressurizer Heaters are -lost due (0950) to low pressurizer level.

Incore thermocouples - 595'F.

NOTE:

1. The cause of the low oil pressure was no oil in the reservoir and the pump motor has seized.

DRILL SCENARIO 08/11/82 T = 150 R.B. pressure is equalized allowing the injured contaminated (1000) worker's removal - (RMC scenario)

NOTE:

Purge cannot be secured because exhaust valves are inoperable, (i.e. Motor burned up and air operated is jammed by opening with pressure in buildi.ng).

RCS voiding starts to occur.

Incore thermocouples -- 632*F.

T = 170 Site Evacuation should be ordered.

(1020)

NOTE:

1. Fif teen (15) volunteers will.actually be evacuated to the Middletown Junction Substation.
2. Monitoring team at Middletown Junction Substation find five (5) persons contaminated.

(These persons should be dressed in PC's and taken to the AEOF (Crawford Station) for decontamination.)

t

3. Contaminated persons arrive at the AE0F for decontamination (begin decontamination process).

T = 175 Auto wreck near Unit 2 Administration Building requiring Unit 2 (1025) response with injured personnel and a fire potential requiring offsite fire and ambulance support.

T = 195 RCS pressure starts increasing.

(1045)

Incore Thennocouple --- 655*F.

RCS leakage starts increasing due to increased pressure.

T = 200 RCS Code Safeties lif t continuously, increasing coolant (1050) loss to 700 gpm.

2 T = 208 Incore Thermocouples --- 705 F.

(1058)

RCS is supersaturated (i.e., above critical point).

          • GENERAL EMERGENCY *****

l T = 225 Core uncovery starts.

(1115)

Incore thermocouples -- 1400*F.

T = 230 Core clad material starts to melt releasing fission gasses.

(1120)

RMA-9 goes offscale high.

Operator should start BS-P-1B manually i

NOTE:

At this point, major fuel damage occurs because of the melting of the cladding material.

This rupture results i

in a significant release through the RC drain tank and out the ventilation stack.

l 1 !

ORILL SCENARIO 08/11/82 T = 260 Effected repairs permit operation of MU-V14A, V16A, V16B (1150) thus pemitting use of MU-P-1A.

T = 300 Security threat is called in.

(1230)

T = 330 Long-Tem Recovery actions are discussed.

(1300)

T = 345 Secure from drill.

(1315) i l l

L

i DRILL SCENARIO 08/11/82 Time T=0

(

Date 08/11/82 i

ENCLOSURE (1)

E0F/ECC INFORMATION (Plant STATUS - Operations Line) l Event Class Unusual Event Alert Site General Time Declared l

t I.

Reactivity Control f

Neutron Flux Int (100 percent)

[

CRD Position 292 L

Boron Concentration 30 PPM II.

Core Cooling A. Loop B. Loop i

TH 603 603 i

TC 555 555

[

f a T = (Th-T) 48 48 c

Percent Flow 100 percent 100 percent

[

RC Pressure 2155 2155 t

Pressurizer Level 220" 220" i

RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes I

Degrees Sub-Cooling 45*F 45'F i

l 5 Highest Core Thermocouples 604 605 603 605 606 l

l Secondary Plant A. Loop B. Loop OTSG Level 66 percent 66 pen:ent OTSG Press.

910 910

, i

~.

I DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 1

(Operations Line)

Feed Flow 10.6 x 106 10.6 x 106 Steam Temp 595'F 595*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 3'

RCS Leak Rate

.5 Makeup Flow into RCS 20gpm Letdown Flow out of RCS 40gpm Makeup Tank Level and Pressure 80" /15psig IV.

Containment Integrity and Cooling SHUT PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

t R Bldg. Temp / Press.

110/0 Bldg. Spray Flow 0

0 B5-PIA B5-PIB RB FANS Operation X

X 1A IB IC V.

SIafety Systems HPI Flow 0

0 0

0 r

(Mu-V 16A)(Mu-V 16B)(Mu-V16C)(Mu-V 16D) [

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 i

CFT-1A CFT-1B l

l LPI Flow 0

0 I

DH-V4A DH-V4B g

BWST Level 56.2 Diesel Gen. Operable (Yes/No)

Yes Yes 1A IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes

(

VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 1B 1C Operable Gas Compressors yes yes WG-P1A WG-PIB Bleed Tank Level 80

)ercent 40 percent 60 percent RC3-TIA TIB TIC MWST Level 30 percent 3 ST.1A EVAP Cond. Tank Level 50 percent 0 pen:ent T1A T1B Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

0 Industrial Waste Treatment Sump 80 percent Level

! I

l i

DRILL SCENARIO 08/11/82 Time T = 10 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line) l l

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 100 percent CRD Position INT 292 Boron Concentration 30 PPM II.

Core Cooling A. Loop B. Loop TH 603 603 TC 555 555 a T = (Th-T) 48 48 c

Percent Flow 100 percent 100 percent l

RC Pressure 2155 2155 Pressurizer Level 220" 220" l

RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 45'F 45*F 5 Highest Core Themocouples 604

,605 603 605 606 Secondary Plant A. Loop B. Loop i

OTSG Level 66 percent 66 percent OTSG Press.

910 910 l

l '

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow

10. 6 x 106 10.6 x 106 Steam Temp 595*F 595'F Condensate Tank Level 12' 12' Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 3'

RCS Leak Rate

<1 Makeup Flow into RCS 20gpm Letdown Flow out of RCS 40gpm Makeup Tank Level and Pressure 80" /15psig l

IV.

Containment Integrity and Cooling SHUT t

PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

110/0 Bldg. Spray Flow 0

0 BS-PIA BS-PIB RB FANS Operation X

X 1A IB IC l

Y.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 16D) l l i v

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow DH-V4A DH-V4B BWST Level 56.2 Di.esel Gen. Operable (Yes/No)

Yes Yes 1A 1B Closed and River Water Cooling Systems Operable (Yes/No) yes 4XV, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 4

1A IB IC Operable Gas Compressors yes yes WG P1A WG-PIB Bleed Tank Level 80 3ercent 40 percent 60 percent RC3-TIA TIB T1C MWST Level 30 percent MW5T.1A EVAP Cond. Tank Level 50 percent 0 percent TIA TIB l

Aux. Bldg. Sump Level 20 percent i

Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent l

Level l

l l !

DRILL SCENARIO 08/11/82 Time T = 50 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line) i Event Class Unusual Event Alert Site General l

Time Declared I.

Reactivity Control Neutron Flux INT (100 percent)

CRD Position 292 Boron Concentration 30' II.

Core Cooling A. Loop B. Loop TH 603 603 l

TC 555 555 a T = (Th-T) 48 48 c

Pen:ent Flow 100 percent 100 percent RC Pressure 2155 2155 Pressurizer Level 220" 220" RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 45*F 45'F 5 Highest Core Thennocouples 604 605 604 606 605 Secondary Plant A. Loop B. Loop OTSG Level 66 percent 66 percent OTSG Press.

910 910 t

l 4

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line) l Feed Flow 10.6 x 106 10.6 x 106 Steam Temp 595*F 595*F I

Condensate Tank Level 12' 12' I

Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed i

l III.

RCS Integrity

[

RB Sump Water Level 3'

i RCS Leak Rate

<1 Makeup Flow into RCS 20gpm i

Letdown Flow out of RCS 40gpm

(

Makeup Tank Level and Pressure 78" /15psig IV.

Containment Integrity and Cooling SHUT PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

I R Bldg. Temp / Press.

110/0 t

v Bldg. Spray Flow 0

0 BS-PIA BS-PIB RB FANS Operation X

X 1A IB IC V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 16D) i

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow DH-V4A DH-V4B BWST Level 56.2 Diesel Gen. Operable (Yes/No)

Yes Yes IA IB Cicsed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A IB 1C Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80

)ercent 40 percent 60 percent RC3-TIA T1B T1C l

MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent TIA TIB Aux. Bldg. Sump Level 20 percent Leak Rate to Aux Bldg.

O Industrial Waste Treatment Sump 80 percent Level

--h,

-e-.--

DRILL SCENARIO i

08/11/82 Time T = 100 Date 08/11/82 ENCLOSURE (1) i EOF /ECC INFORMATION (Plant STATUS - Operations !.ine)

Event Class Unusual Event Alert Site General Time Declared i

I.

Reactivity Control Neutron Flux 100 percent CRD Position Initial 292 Boron Concentration 30 II.

Core Cooling A. Loop B. Loop TH 603 603 TC 555 555 a T = (Th-T) 48 48 c

Percent Flow 100 percent 100 percent i

RC Pressure 2155 2155 Pressurizer Level 220 220 RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 48'F 48'F l

5 Highest Core Thermocouples 605 604 605 606 605 i

Secondary Plant A. Loop

8. Loop OTSG Level 66 percent 66 percent OTSG Press.

910 910.

l i

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 10.6 x 106 10.6 x 106 Steam Temp 595'F 595'F Condensate Tank Level 12' 12' Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 3'

RCS Leak Rate 350 '

Makeup Flow into RCS 20gpm Letdown Flow out of RCS 40gom Makeup Tank Level and Pressure 76" /15psig IV.

Containment Integrity and Cooling SHUT PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

l R Bldg. Temp / Press.

110/0 Bldg. Spray Flow 0

0 BS-PIA BS-PIB l

RB FANS Operation X

X 1A 18 1C V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160) _ _ _

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B BWST Level 54 i

Diesel Gen. Operable (Yes/No)

Yes Yes 1A IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes e

VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 18 1C Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80 ercent 40 percent 60 percent

-TIA T1B T1C MWST Level 30 percent l

MWST.1A EVAP Cond. Tank Level 50 percent 0 percent T1A T1B l

Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent l

Level i i

DRILL SCENARIO 08/11/82 Time T = 115 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 65 II.

Core Cooling A. Loop B. Loop i

TH 555 555 TC 553 553 a T = (Th-T) 2 2

c Percent Flow 100 pert:ent 100 percent RC Pressure 2100 2100 Pressurizer Level 200 200 RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 87*F 87'F 5 Highest Core Therwocouples 558 559 557 558 559 Secondary Plant A. Loop B. Loop OTSG Level 30" 30" OTSG Press.

1010 1010 i

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line) i Feed Flow

. 5 x 106

. 5 x 106 Steam Temp 550*F 550*F Condensate Tank Level 12' 12' Maf', Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 6.0 RCS Leak Rate Makeup Flow into RCS 350gpm (2 Mu pumps and Mu-V-217 open)

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 60"/12 psig IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

125* /.8 Bldg. Spray Flow 0

0 BS-PIA BS-P1B RB FANS Operation X

X 1A IB IC V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 16D) __

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B t

BWST Level 56 Diesel Gen. Operable (Yes/No)

Yes Yes 1A 1B Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pres:ures 60 0

0 1A 18 1C Operable Gas Canpressors yes yes l

WG-P1A WG-P1B Bleed Tank Level 80 )ercent 40 percent 60 percent RC3-TIA TIB T1C MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent T1A T1B Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

0 l

Industrial Waste Treatment Sump 80 percent l

Level :

DRILL SCENARIO 08/11/82 Time T = 125 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 100 II.

Core Cooling A. Loop B. Loop TH 545 545 TC 543 543 a T = (Th-T) 2 2

c Percent Flow 100 percent 100 percent RC Pressure 2000 2000 Pressurizer Level 1 50" 150" RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 90*F 90*F 5 Highest Core Thermocouples 549 5 50 548 549 5 50 Secondary Plant A. Loop B. Loop OTSG Level 30" 30" 0TSG Press.

1010 1010.

F i

DRILL SCENARIO 08/11/82 l

ENCLOSURE (1) t Page 2 (Operations Line)

Feed Flow

. 5 x 106

. 5 x 106 Steam Temp 540*F 540*F Condensate Tank Level 12' 12' Main Condenser Vacuum 27 Atmospheric Relief Yalve Position closed closed III.

RCS Integrity RB Sump Water Level 7.5' RCS Leak Rate Makeup Flow into RCS 350 Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 66"/10 psig IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

128* / 1 Bldg. Spry Flow 0

0 l

BS-P1A BS-P1B l

RB FANS Operation X

X 1A IB IC Y.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160),

l DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A -

DH-V48 BWST Level 55.8 Diesel Gen. Operable (Yes/No)

Yes Yes 1A 1B Closed and River Water Cooling Systems Operable (Yes/No) yes 4KV, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 1B 1C Operable Gas Compressors yes yes WG-P1A WG-PIB Bleed Tank Level 80 3ercent 40 percent 60 percent RC3-TIA T1B T1C MWST Level 30 percent HWST.1A EVAP Cond. Tank Level 50 percent 0 percent I1A T18 Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent Level P

DRILL SCENARIO 08/11/82 Time T = 140 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 rercent i

Boron Concentration 115 j

II.

Core Cooling A. Loop B. Loop TH 520 520 TC 518 518 a T = (Th-T) 2 2

c Percent Flow 100 percent 100 percent RC Pressure 1800 1800 Pressurizer Level 100" 100" RC Pumps Operation A

B C

D PRZR Heaters Ope able (Yes/No) yes Degrees Sub-Cooling 95'F 95'F 5 Highest Core Thermocouples 552 523 521 522 523 F

Secondary Plant A. Loop B. Loop OTSG Level 30" 30" OTSG Press.

830 830 -

i DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (0perations Line)

Feed Flow

.25 x 106

.25 x 106 Steam Temp 510*F 510*F Condensate Tank Level 12' 12' Main Condenser '!acuum 27 Abnospheric Relief '.*alve Position closed closed III.

RCS Integrity RB Sump Water Level 7.6' RCS Leak Rate Makeup Flow into RCS 350 Letdown Flow out of RCS 0

P Makeup Tank Level and Pressure 76" IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

129' / 1.0 Bldg. Spray Flow 0

0 BS-PIA BS-PIB RB FANS Operation X

X 1A IB IC V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160) i DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B BWST Level 55.6 Diesel Gen. Operable (Yes/No)

'Yes Yes 1A 18 Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A IB IC Operable Gas Compressors yes yes' WG-PIA WG-PIB Bleed Tank Level 80 percent 40 percent 60 percent l

RC 3-T1A TIB TIC MWST Level 30 percent l

MWST.1A 1

EVAP Cond. Tank Level 50 percent 0 percent TIA T1B Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

0 Industrial Waste Treatment Sump 80 percent l

Level

DRILL SCENARIO i

08/11/82 Time T = 145 i

Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General l

Time Declared I.

Reactivity Control i

Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 II.

Core Cooling A. Loop B. Loop TH SM SN TC 518 518 a T = (Th-T) 2 2

c Percent Flow 0 percent 0 percent j

RC Pressure 1600 1600 Pressurizer Level 30' 30' l

RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 100*F 5 Highest Core Thennocouples 523 524 525 525 525 Secondary Plant A. Loop B. Loop OTSG Level 30" 30" OTSG Press.

830 830 i

t DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow

.25 x 106

.25 x 106 2

Steam Temp 510*F 510*F Condensate Tank Level 12' 12' Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 7.6' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 77"/10 psig i

IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-V1A V1B VIC V1D r

i Containment H2 Concentration 0

R Bldg. Temp / Press.

1 30 * /.8 Bldg. Spray Flow BS-P1A BS-PIB RB FANS Operation X

X 1A IB IC r

l Y.

Safety Systems l

l HPI Flow 0

0 0

0 l

(Mu-V 16A)(Mu-V 16B)(Mu-V16C)(Mu-V 15D)

[ t

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes Yes 1A IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 18 1C Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80 percent 40 percent 60 percent RGB-TIA TIB T1C MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent TIA TIB Aux. Bldg. Sump Level 20 percent Leak Rate to aux. Bldg.

O i

l Industrial Waste Treatment Sump 80 percent i

i Level l,

~.

DRILL SCENARIO 4

08/11/82 Time T = 150 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control J

Neutron Flux 0 percent CRD Position 0 percent l

Boron Concentration 117 II.

Core Cooling A. Loop B. Loop TH 535 535 l

TC 535 535 a T = (Th-T) 0 0

c Percent Flow 0 percent 0 percent RC Pressure 1500 1500 i

Pressurizer Level 0

0 i

RC Pumps Operation A

B C

D

(

I PRZR Heaters Operable (Yes/No) yes t

Degrees Sub-Cooling 0

5 Highest Core Thermocouples 545 Secondary Plant A. Loop B. Loop

[

t OTSG Leval 20 percent 20 pertent l

~~

OTSG Press.

800 800 l

- ~.,, -, -

r.

-.--,_,.,,--r-

-m.,

l DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 200 gpm 200 gpm Steam Temp 520*F 520*F Condensate Tank Level 12 12 Main Condenser Vacucm 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 7.65' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 78 / 15 IV.

Containment Integrity and Cooling PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

135* / 0 Bldg. Spray Flow 0

0 BS-PIA BS-PIB i

RB FANS Operation X

X 1A IB IC V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160)

.3 DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B i

BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes Yes 1A 1B Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures

___60 0

0 1A 18 1C Operable Gas Compressors yes yes WG-P1A WG-P1B l

Bleed Tank Level 80 percent 40 percent 60 percent RGB-TIA T1B TIC MWST Level 30 percent MW5T.1A EVAP Cond. Tank Level 50 percent 0 percent T1A T1B Aux. Bldg. Sump Level 20 percent l

Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent i

l Level

[

I

l

{

l

DRILL SCENARIO 08/11/82 Time T = 155 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared r

I.

Reactivtty Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 II.

Core Cooling

~

A. Loop B. Loop TH 550 550

~

TC 535 535 a T = (Th-T) 15 15 c

Percent Flow 0 percent 0 percent RC Pressure 1370 1370 Pressurizer Level 0

0 RC Pumps Operation A

B C

D i

PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

5 Highest Core Therwoccuples 570 Secondary Plant A. Loop B. Loop OTSG Level 30 percent 30 percent OTSG Press.

950 950 m

, w.-

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 200 gpm 200 gpm Steam Temp 530*F 530*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 7.65' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 78 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

l R Bldg. Temp / Press.

1 40* /.2 Bldg. Spray Flow 0

0 BS-P1A BS-PIB RB FANS Operation X

X i

IA 1B 1C V.

Safety Systems 6

HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160)

L

' l

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A D H-V48 BWST Level 55.6 1

Diesel Gen. Operable (Yes/No)

Yes Yes 1A IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480Y, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A IB 1C Operable Gas Compressors yes yes WG-P1A WG-PIB Bleed Tank Level 80 percent 40 percent 60 percent RGB-TIA TIB TIC

~

MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent T1A T1B Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent

, Level \\

l

DRILL SCENARIO 08/11/82 Time T = 160 Date 08/11/82 ENCLOSURE (1)

E0F/ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared t

I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 1

II.

Core Cooling A. Loop B. Loop TH 575 575 l

TC 525 525 A T = (Th-T) 50 50 c

Percent Flow 0 percent 0 percent l

RC Pressure 1280 1280 Pressurizer Level 0

0 l

RC Pumps Operation A

B C

D v

PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

i 5 Highest Core Thennocouples 600 Secondary Plant A. Loop B. Loop OTSG Level 50 percent 50 percent OTSG Fress.

1000 1000

?,

I h

-w

-,n

,,,-_-,,-,-,-.-,w, n -

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line) f Feed F1ow 200 gpm 200 gpm Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 10.6 RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 77 / 15

[

IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA VIB VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

145 /.5 Bldg. Spray Flow 0

0 BS-PIA BS-P1B RB FANS Operation X

X 1A 1B IC V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 16B)(Mu-V16C)(Mu-V 160) _ _.

DRILL SCENARIO 08/11/82 l

ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes Yes IA IB l

Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) 3es Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 18 1C Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80 percent 40 percent 60 percent l

RGB-T1A TIB T1C l

MWST Level 30 percent MWST.1A EVAP Cona. Tank Level 50 percent 0 percent T1A TIB Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent Level.

.s DRILL SCENARIO 08/11/82 Time T = 160 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 II.

Core Cooling A. Loop B. Locp TH 575 575 TC 525 525 a T = (Th-T) 50 50 c

Percent Flow 0 percent 0 percent RC Pressure 1280 1280 Pressurizer Level 0

0 RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes i

Degrees Sub-Cooling 0

5 Highest Core Thermocouples 600 Secondary Plant A. Loop B. Loop OTSG Level 50 percent 50 percent OTSG Press.

1000 1000. -.

I DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 200 gpm 200 gpm Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 7.7' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 77 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

l R Bldg. Temp / Press.

145 /.6 Bldg. Spray Flow 0

0 BS-PIA BS-PIB RB FANS Operation X

X 1A 18 1C V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 16B)(Mu-V16C)(Mu-V 16D)

DRILL SCENARIO 08/11/82 ENCLOSURE (1) f 4

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V48 BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes-Yes IA IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes l

VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A IB IC Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80 3ercent 40 percent 60 percent RC3-TIA TIB TIC MWST Level 30 percent

.MW5T.1A EVAP Cond. Tank Level 50 percent 0 percent TIA TIB Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

0 Industrial Waste Treatment Sump 80 percent Level 4 l 1

DRILL SCENARIO 08/11/82 Time T = 165 Date 08/11/82 ENCLOSURE (1)

E0F/ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 II.

Core Cooling A. Loop B. Loop TH 595 595 TC 515 515 a T = (Th-T) 80 80

[

c Pertent Flow 0 percent 0 percent RC Pressure 1490 1490 t

Pressurizer Level 0

0 RC Pumps Operation A

B C

D l

PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

l 5 Highest Core Thermocouples 630 Secondary Plant A. Loop B. Loop OTSG Level 70 percent 70 percent OTSG Press.

1000 1000 l

l l l

\\

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 100 gpm 100 gpm Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 7.7' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 77 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

140 /.6 Bldg. Spray Flow 0

0 BS-P1A BS-P1B L

RB FANS Operation X

X 1A 1B IC V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160) - -

1 i

L DRILL SCENARIO 08/11/82 I

ENCLOSURE (1)

Page 3 (Operations Line)

\\

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V48 BWST Level 52.6 1

Diesel Gen. Operable (Yes/No)

Yes Yes IA IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes l

Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 18 1C Operable Gas Compmssors yes yes WG-PlA WG-PIB Bleed Tank Level 80 aercent 40 percent 60 percent RC3-TIA TlB tlc MWST Level 30 percent l

MW5T.lA EVAP Cond. Tank Level 50 percent 0 percent TlA TlB l

l l

Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O l

l Industrial Waste Treatment Sump 80 percent Level t

i i

DRILL SCENARIO 08/11/82

.1 Time T = 170 Date 08/11/82 i

ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 t

II.

Core Cooling A. Loop B. Loop r

615 615 j

TH i

495 495 TC a T = (Th-T) 120 120 c

Percent Flow 0 percent 0 percent i

RC Pressure 1700 1700 Pressurizer Level 0

0 l

l RC Pumps Operation A-B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

l 5 Highest Core Thennocouples 650 t

i Secondary Plant A. Loop B. Loop 0TSG Level 80 percent 80 percent OTSG Press.

1000 1000 e !

l

-.wrny,,r--

r-w

.v-.

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 50 gpm 50 gpm Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Yalve Position closed closed III.

RCS Integrity RB Sump Water Level 7.7' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 77 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D l

Containment H2 Concentration 0

l R Bldg. Temp / Press.

1 30 /.6 l

Bldg. Spray Flow 0

0 l

BS-P1A BS-PIB RB FANS Operation X

X 1A 1B IC V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160)

, t

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V48 BWST Level 52.6 Diesel Gen. Operable (Yes/No)

Yes Yes IA IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 1B 1C Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80 percent 40 percent 60 percent RC3-TIA T1B T1C l

MWST Level 30 percent l

MWST.1A EVAP Cond. Tank Level 50 percent 0 percent TIA TIB Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O i

Industrial Waste Treatment Sump 80 percent Level

b DRILL SCENARIO 08/11/82 Time T = 180 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event

' Al e rt Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 II.

Core Cooling A. Loop B. Loop TH 635 635 TC 485 485 a T = (Th-T) 150 150 c

Percent Flow 0 percent 0 percent l

RC Pressure 1985 1985 Pressurizer Level 0

0 RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes l

Degrees Sub-Cooling 0

5 Highest Core Thennocouples 660 Secondary Plant A. Loop B. Loop t

l OTSG Level 95 7ercent 95 percent OTSG Press.

TDDD 1000

i. !

. _ _, _, _ _... _ ~

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 0 gpm 0 gpm Steam Temp 540*F S40*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 7.7' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 77 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

110 /.4 Bldg. Sprgy Flow 0

0 BS-P1A BS-PIB RB FANS Operation X

X 1A 18 1C V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 16D)

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B BWST Level 52.6 Diesel Gen. Operable (Yes/No)

Yes Yes 1A IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A IB IC Operable Gas Compressors yes yes WG-P1A WG-P1B Bleed Tank Level 80 percent 40 percent 60 percent RGB-TIA TIB T1C MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent T1A T1B Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent Level

DRILL SCENARIO 08/11/82 Time T = 195 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 II.

Core Cooling A. Loop B. Looo TH 655 655 TC 475 475 a T = (Th-T) 180 180 c

Percent Flow 0 percent 0 percent RC Pressure 2285 2285 Pressurizer Level 0

0 RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

5 Highest Core Thermocouples 670 Secondary Plant A. Loop B. Loop OTSG Level 95 percent 95 ercent OTSG Press.

1000 0

F s

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 0

0 Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Yalve Position closed closed III.

RCS Integrity RB Sump Water Level 10.7 RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 75 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA VIB VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

110* /.4 Bldg. Spray Flow 0

0 BS-PIA BS-PIB l

l RB FANS Operation X

X l

1A IB IC 1

V.

Safety Systems HPI Flow 0

0 0

0 l

(Mu-V 16A)(Mu-V 16B)(Mu-V16C)(Mu-V 16D) l l l l

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes Yes 1A IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A IB 1C Operable Gas Compressors

_ WG-PIA WG-PIB yes yes i

Bleed Tank Level 80

)ercent 40 percent 60 percent RC 3-TIA TIB T1C 0

MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent T1A T1B Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent Level

, l t

b L

~

DRILL SCENARIO 08/11/82 i

i l

Time T = 200 Date 08/11/82

[

t ENCLOSURE (1) t EOF /ECC INFORMATION (Plant STATUS - Operations Line) f Event Class Unusual Event Alert Site General Time Declared r

I.

Reactivity Control j

Neutron Flux 0 percent L

CRD Position 0 percent Boron Concentration 117 II.

Core Cooling A. Loop B. Loop TH 675 675 TC 470 470 a T = (Th-T) 205 205 c

i Percent Flow 0 percent 0 percent

[

RC Pressure 2500 2500 Pressurizer Level 0

0 1

RC Pumps Operation A

B C

D f

PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

5 Highest Core Thermocouples 700 Secondary Plant A. Loop B. Loop f

OTSG Level 95 percent 95 percent OTSG Press.

1000 1000 I

h i

_,m,,-..__

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line) 1 Feed Flow 0 gpm 0 g;m Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 i

Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 10.7 RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 75 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

110 /.2 l

Bldg. Spray Flow 0

0 l

BS-PIA BS-PIB j

RB FANS Operation X

0 X

l 1A IB IC V.

Safety Systems l

HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160) ;

a DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A DH-V4B BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes Yes IA IB Closed and River Water Cooling Systems Operable (Yes/No) yes i

4KY, 480Y, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A IB IC Operable Gas Compressors yes yes WG-P1A WG-PIB Bleed Tank Level 80

)ercent 40 percent 60 percent RC 3-TIA T1B T1C MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent TIA TIB Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent Level 1

DRILL SCENARIO 08/11/82 Time T = 205 i

Date 08/11/82 ENCLOSURE (1)

E0F/ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared i-I I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent

^

Boron Concentration 117 II.

Core Cooling A. Loop B. Loop TH 695 695 TC 465 465 a T = (Th-T) 230 230 c

Percent Flow 0 percent 0 percent RC Pressure 2500 2500 Pressurizer Level 0

0 RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

5 Highest Core Thennocouples 750 Secondary Plant A. Loop B. Loop OTSG Level 95 percent 95 percent OTSG Press.

1000 1000 e

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 0 gom 0 gpm Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Yalve Position closed closed III.

RCS Integrity RB Sump Water Level 10.7 RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 77 / 15 IV.

Containment Integrity and Cooling open open closed closed i

PURGE VALVE POSITION AH-VIA VIB VIC V1D l

Containment H2 Concentration 0

R Bldg. Temp / Press.

110 /.2 l

Bldg. Spray Flow 0

0 BS-PIA BS-PIB RB FANS Operation X

X l

1A IB IC V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V 160) i i

l.

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI F?ow 0

0 DH-V4A DH-V4B BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes Yes 1A IB Closed and River Water Cooling Systems Operable (Yes/No) yes 4KV, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A IB IC Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80 percent 40 percent 60 percent RGB-TIA T1B TIC MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent T1A TIB i

Aux. Bldg. Sump Level 20 percent l

l Leak Rate'to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent l

Level

4 DRILL SCENARIO 08/11/82 Time T - 210 Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 II.

Core Cooling A. Loop B. Loop TH 750 750 I

TC 4M 4@

a T = (Th-T) 290 290 c

Percent Flow 0 percent 0 percent RC Pressure 2500 2500 Pressurizer Level 0

0 RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

5 Highest Core Thermocouples 800 Secondary Plant A. Loop B. Loop OTSG Level 95 pertent 95 percent OTSG Press.

1000 1000 _.

.= -

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 0 gpm 0 gpm Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Yacuum 27 L

Atmospheric Relief Yalve Position closed closed III.

RCS Integrity RB Sump Water Level 10.8 RCS Leak Rate Makeup Flow into RCS 0

i Letdown Flow out of RCS 0

i Makeup Tank Level and Pressure 75 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA V1B VIC V1D t

Containment H2 Concentration 0

R 81dg. Temp / Press.

110 /.2 Bldg. Sprgy Flow 0

0 BS-P1A BS-PIB RB FANS Operation X

X 1A 18 1C

{

V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 16B)(Mu-V16C)(Mu-V 16D) l l

9 DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 CFT-1A CFT-1B LPI Flow 0

0 DH-V4A D H-V4B L

BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes Yes IA 1B Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 18 1C Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80 percent 40 percent 60 percent l

RGB-TIA TIB TIC MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent l

TIA T1B i

Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent Level i

i j

t DRILL SCENARIO 08/11/82 t

Time T = 215 t

o!

Date 08/11/82 ENCLOSURE (1)

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I.

Reactivity Control Neutron Flux 0 percent I

CRD Position 0 percent

[

Boron Concentration 117 II.

Core Cooling A. Loop B. Loop L

TH 920 920 TC 455 455 a T = (Th-T) 465 465 c

Percent Flow 0 percent 0 percent i

t RC Pressure 2500 2500 r

Pressurizer Level 0

0 i

RC Pumps Operation A

B C

D PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

5 Highest Core Thermocouples 1000 Secondary Plant A. Loop

'B.

Loop OTSG Level 95 pen:ent 95 percent OTSG Press.

1000 1000 I

l l i t

t I

(

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 0 gpm 0 gpm Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Yalve Position closed closed III.

RCS Integrity RB Sump Water Level 7.7' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 75 / 15 IV.

Containment Integrity and Cooling PURGE VALVE POSITION AH-VIA V1B VIC V1D Containment H2 Concentration 0

R Bldg. Temp / Press.

110 /.2 Bldg. Sprgy Flow 0

0 BS-PIA BS-PIB RB FANS Operation X

X 1A 18 1C V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 16B)(Mu-V16C)(Mu-V 16D) l ;

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line)

CFT Level / Press 13/600 13/600 GPI-1A CFT-1B LPI Flow DH-V4A DH-V48 BWST Level 55.6 Diesel Gen. Operable (Yes/No)

Yes Yes 1A 1B c

Closed and River Water Cooling Systems Operable (Yes/No) yes 4KV, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 1B 1C Operable Gas Compressors yes yes WG-PIA WG-PIB Bleed Tank Level 80

>ercent 40 percent 60 percent l

RC3-TIA TIB TIC MWST Level 30 percent MW5T.1A l

EVAP Cond. Tank Level 50 percent 0 percent l

T1A TIB l

Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent Level i

B -

b DRILL SCENARIO 08/11/82 i

l

-i Time T = 220 i

Date 08/11/82 ENCLOSURE (1)'

[

EOF /ECC INFORMATION (Plant STATUS - Operations Line)

Event Class Unusual Event Alert Site General Time Declared I

i I.

Reactivity Control Neutron Flux 0 percent CRD Position 0 percent Boron Concentration 117 II.

Core Cooling A. Loop B. Loop TH 920 920 l'

TC 450 450 4

a T = (Th-T) 470 470 c

Percent Flow 0 percent 0 percent i

RC Pressure 2500 2500 Pressurizer Level 0

0 j

l RC Pumps Operation A

B C

D f

PRZR Heaters Operable (Yes/No) yes Degrees Sub-Cooling 0

5 Highest Core Thennocouples 1400 I

Secondary Plant A. Loop B. Loop f

i

[

OTSG Level

.95 percent 95 percent

~

OTSG Press.

1000 1000 i [

l I

DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 2 (Operations Line)

Feed Flow 0 gpm 0 gpm Steam Temp 540*F 540*F Condensate Tank Level 12 12 Main Condenser Vacuum 27 Atmospheric Relief Valve Position closed closed III.

RCS Integrity RB Sump Water Level 7.7' RCS Leak Rate Makeup Flow into RCS 0

Letdown Flow out of RCS 0

Makeup Tank Level and Pressure 74 / 15 IV.

Containment Integrity and Cooling open open closed closed PURGE VALVE POSITION AH-VIA VIB VIC V1D Containment H2 Concentration R Bldg. Temp / Press.

110 /.2 Bldg. Spray Flow 65:FIK BS-PIB RB FANS Operation X

X 1A 18 1C I

V.

Safety Systems HPI Flow 0

0 0

0 (Mu-V 16A)(Mu-V 168)(Mu-V16C)(Mu-V IEE) t DRILL SCENARIO 08/11/82 ENCLOSURE (1)

Page 3 (Operations Line) i CFT Level / Press 13/600 13/600 CFT-1A 7 '-38 LPI Flow 0

0 DH-V4A DH-V48 BWST Level 52.6 Diesel Gen. Operable (Yes/No)

Yes Yes 1A 18 Closed and River Water Cooling Systems Operable (Yes/No) yes 4KY, 480V, and Vital Safe Guards Electrical Buses Operable (Yes/No) yes Safety System Instruments Operable (Yes/No) yes VI.

Radwaste System WG Decay Tank Pressures 60 0

0 1A 1B 1C Operable Gas Canpressors yes yes WS-P1A WG-PIB Bleed Tank. Level 80 percent 40 percent 60 percent RGB-T1A T1B TIC MWST Level 30 percent MWST.1A EVAP Cond. Tank Level 50 percent 0 percent TIA T1B Aux. Bldg. Sump Level 20 percent Leak Rate to Aux. Bldg.

O Industrial Waste Treatment Sump 80 percent Level l.

s RM-G5 Reactor Building Personnel Access Hatch Radiation Levels vs. Time 7

10 t.

3-S f

4 f_. _.

3

-.-.---__i.-.--_,

- -. _ _ - - 7
-z 6

10 i

1

_ _. -p f

._.- - - _.:.==_
=._.

1 J'

3

.a._.-

..---u_-.-

3 5

j j

10 8

_ r _

3 S

e 3

.___i--

4 10 i

6 w

j

- - _ + _

,r-3 7_

7..

--.---+------_;

--_-9---

3

-= f - -

10

-- - 4 8

g c

= _ _,

i !

4R 3 g ===n

-==a====.=== =2;#__ -

=-

=y = = - ; - - -

iR 3

2 1

10

--- -4 2

-- T=120

- - - - - - + - - - - -

-~ '

d

.A.q -f ;

, Z _ ?Mf==' si T=117 REEt!5 f l~

^ * ~* ~ ~ -

~ ~ ~ ~

~ ~ ~ ~

~~

~

i 1 -

y-_-x High (23)

.=

3 in

~_

A; Alert (15) l eY

'I l

A l

0, l

l 3

. - -. y... g.... _ - -.

.......p-_..

i 0

l 10 i

l 0

~- *

,S 2=_i.d.+

  • =4.=== " 2. 42_ J:-25 ;.*_ 2 ^ '.' 3. +d-Fh.-- 3 ~.-.- ' _:x_13-j-h $_.' * ;-' -~^C

-3 2-id- 0*

y--

g g

-*e

- + -

7

]

.. - +. - *

  • ww,1

~.

01 1 ~w.+-

9%.

g c

=

I l

D 25 50 75 100 125 150 175 200 225 250 275 300 325 350 i

s ir t

I RM-G6 Reactor Building Bridge -

t Auxiliary Radiation Levels vs. Time 7

10 ' i o

^

l s

/

l 3

4 6

i.

f 10 i

,e 5

d 3

=

2 10' l-.

l

~

P e

6 a----._-

[

3 t

3 4

l 10 o

T=132

-=_

3 2

T=130 High (2500)

- - v- -

~-

3 i

H 10 i

Alert (1500) e

_._____c4

,@ _ m _

_o

_o

'1R 3 = __.

_y____m.- - _.

=-

iR 2

10 i

e s

4 3

2

' ' ~ ' - - - - - - ~~ ~ - -


~~-

j'j~

1 10 i

l =. - - - = = = = - : -- : = === :======.

=============== =. _

s d

3.

-e -

10 E=

=
u : n i r: :: : : :: _: =_ _: : :
n:x:.
--: n =:::
r:: :::: :: : : -- - - -

- _ +. -

4 h *

-.*4--***Md-g 4- + -]

-6 4

.e 6

-e e-=

~

gn'9* * * * -. -

-.a.-.-9

+

4-tM

-*w

.. =

_=._---.: _

~~

a

_-e--

_.+ ;

4M +. -e S-e e r

-e 4,,j

a

< 99 0-1 7 -

.-j i.-,

25 50 75 100 125 150 175 200 225 250 275 300 325 350 RM-G7 Reactor Building Fuel Handling Bridge - Main Radiation Levels vs. Time 7

10 i

8-e s

p a

)

.t-~--

. - -. - - - + - + - - - - - - - - -

--+------4+-+-"---

- - + - - - - - - - - * - - - -

-+ - - - - - ~

~

,-s.

6 0

7 i

3 s

f 2

_.._-4_y

....____.m 2

10' i

e 6

+

a

- -j.

2 4

10 l'

l i

6

- - - + - -

S 4

1

- 12 2j=

- -.2m :- -

  • m----

m------

3 ---::==

====x-

=-

2 3

0 T=120 f

x 8

T=115 High (750) _ _.--

t

+-

\\!

~ ~ ~

4.R_

3 ey= - Alert (300) r--

== -------

- - r - - =5

=.== =p ;- - -

---,==h

.iR 2

2 0

i 3

3 8

3

-,f..

.~.

.-.,2;

-... 3 -, ;; 1.. 3

... p -.-..

..---g-..---

-t--

- - - -- - -. -. = 2.:: - ~

3 1

i 0

i 8

6

, _. _ - - -. ~ _.

~;_

~. l ~._.- -' l

-- ;Z_

~

~

~ ~ ~

  • - -~

d 3

..-4_._.

. _. _ _ _l.,___

- --+ w O

~

10 e

.. -. - -. -g.


.-s

.3 y--' ~ =

F.. +. 32=i.-:-i

_" ~y-

,*Z

=

4 :- i :: :-
24""

, --1I_; ;i-=~d ^ ^ " ^ 'l_.-ti_3 4--.._5-iii h

W

,qi

-Q

==e e

10-1 i-----

25 50 75 100 125 150 175 200 225 250 275 300 325 350 y

RM-G8 (Reactor Building Dome Monitor)

Radiation Levels vs. Time 7

10 1

_rn; c--- _ _r- -- - m:r : _-._ r :n-8 r _: : : : : ~

- - n : __ :._. 2 _ _ _ u c -....

0 e

3 m-_.

a 6

l l

10 I

-== 2- : :: - -- = :=: _ -.:: - --

-=== :-- -_

=====:===: : = =_: = : :: = = -----

9 o

2- _ -

3 3

10' i

_ _... _ _ _ _ - - - _ _ _ _ _ _ _ _ _ _ - - ~ ~ - ~ - - "

~ ~ ~ ~ ~ ~ ~ - ~ ~

- - - ~

~

~

~ ~ ~ * ~ - ~ ~ ~ ~ ~ ~ ~ ~

O

-- - ~'~-

~~~~--~

S d

-Q 3

10 T=190 N

m 4

__-.__-__.-___.:.r..

e f

High (8000) 3 2

3

/

1 10 e

S MR 3

_ _ __. /_.

i 2

l l

'2 i

10 t

..____.-.4___.._ _ - _ -. _ _ - - - -. _ _ _.. _ - _ _. _ - - -

,3. _._.___-..__-_.___._____4 s

d 3

2 10 T=120 M'h l

_.___-__-__.._.E_

Alert (10) a S

d 3

2 10 o

. ~ -. - - - - -. _

s 4

3 l

2

~~

i 10-I i [t-25 50 75 100 125 150 175 200 225 250 275 300 325 350 - _ _ -_.

RM-Gil (Auxiliary Building 305')

Readings vs. Time 7

10 1

4.__._

______.._.____..._____4___

S a

_a 2

6 l

i 10 A

4 3~ _ _____ ___._ _-,.._-_ _.____ _,__ _ ~

4_

2 10' S:

S 4

s

~ _ _

2 1

4 10

,7_

.r.__-__.

S a:

_ - - - + - -

3 y-----.--

2 l

10 l

i o_.

_ _ i_ _ _.'2_.

i MR l

g l

2 10

= : :== x==

=_,

- = = _ : === _ : _ = = = _ _: __ _ f

= - :--
- = _ : =_ _

i N

-__u____.-a__-.

s 2

1 m

10 i

i

\\

' :.:==:= a:====-,

:==

: - - = = 2-- :=_=======

T=94

_.'1 S

4 1_

i

_4 3

2 T=92 T

High (2.5)

'x

+

-'N 0

Alert (1.5)

--_ ~ - -

10

._. _ _ _ _ _. _ = _

--4 3

_ _. - _. _ _ + _ _ _ _ _ - -

2 1

i i

10-1 i.-

25 50 75 100 125 150 175 200 225 250 275 300 325 350 RM-A2 (Reactor Building Sampling)

Gaseous Channel Readings vs. Time 6

Off-scale at T=115 10 4

---_.---._--_-__;.-.---_-------.--~--__

_____77

_.________4_a-___ - _ _ - _ - _, _ _

g 5

10 a

g t

r ~ - - --~ ~ -^-~ T - ~ -- ^ -= = -; _-L T -: _ :--

  • _=1i=N_ _ m^-

l._ _ L :-

u -

112

__. _ _ _, _ _n._ _ -. _. _

_2,~

4

-_m=_._=_

a H1'9h(2x10 )

~= _

_===

- ~ ~ ~ ~

T=110 10 y

_ _ __.._... _. =
2 5 -. _ _ _ _.

g.____

4

- - ~

-~--.. _ ~ _ _ _ _ ~

3 ____.__ ___ __

Alert (1x10 )

- W -i -f ==== = * " --t

= -f ~fM==Z=-4 -:*r Z ~- i--P = 5-

~ m Ii r-4 2 - F-

._...__.___...._3___..___5.==_:g._5

- -...: =.:_. _; - - --_;-==:-------=___...

.l.

CPM 3

__3_

_;; : _ _ __ _._ _ = : ;=--

-- ::=

103 r-

._ r= - -

-EErir._. __ _.:.

g l

3 i #12.=-+.i 4 4Wti--~-i- : =WC=H ;~P4

=JP: Er -

W= ~ ^-k=_~ * --M '-. '_~~ ~-~ $ i = 5: N ~- ~ 5 ~. f~.1 * -

=

7=----~_

'. -2.___

- -. ; -' :u

-.l:

': * ~ 12 95

- i :-d' _M. C-__ :]

_~._.. f

g-i__;.

... g d :d-li 10

- - - ~_._==

4-

~ _ -. :: ::=:::===.: :

. : 2-
= :=

-f 4

"' l 0. ;" _E._ - ! !. ~. O _ '. I l..~.~ ' _- _.-~ l ~.*

C 4_

_M m.

w

= V+~.'

? 5 -i~$ ? ?0?_ _?: D

~-b 5WY

'-~5'~"-b*

b H

' ' "~ b i-C'-

~;-fi - i i - j_IQ fa j - --: :-i;

. ; ::i N

-E -

' :-] ] ],j-

- - -~~-~

,7,_

.7

_ _. ~ * ~ ~ ~C _ - - 1. ! ~ ~ I * ' ' ~ * ~ ~ ~ ~ 7 I 2 ~~~'"

,,.... ; _ 2 _ _.; __ _ _

.._2

- - -{'----*.__ _ _ _ _. -

~ _.I. C., ~.____--~].-____;_-_= ;, ; ;,,,,, __.,,- -_ _-- 4 _,,.., ; ; ;,. ; ; }

;.* 2.
:.

n

---: _. ___ ;_-. __: = : :: : : ; : : ::_:=: : = :


q====.q======

-_u======

1

.:. = -

10 25 50 75 100 125 150 175 200 225 250 275 300 325 350

-.._,-77 __.

RM-A2 (Reactor Building Sampling)

Radioiodine Channel vs. Time 0

-scale at T=120 10,..

g

__ T=ll8 E-5

- High (6x10 )

_ ~ _ - -___...__'_~ _~_ ~---

3

__=_ -__

~~

~

T=ll2 x, __

g_._= = _._.,-___= _ _ - _ _ _. _. - _

5 Alert (2x10 )

5 10 i._

c 5

____________z.___

_ = - - - = - _ - - = _ - - -

_m. - - - _ _ ___ =1 - _-

._=:._:-_==___:_----_=..._::.;.------

=:__ :-

====------_::.

_ _ _ -. _ _ _ = =.

~

_ ~ 'i =.=~ === L.^= 1 ?_. i ~ ^ ~ ~~~_. 52.- 5 _- ~ ~. -~~ _ _._ ~_E=

g

=.---

_ r.=.:

10

. -- : - --.---.;----.--=.____

_ - - _ - ^ - - - - - - - - -

t.

.w._...-.,_.

__--___=._..=..=.=_=.g_._.__

. = _

CPM

=_::=.===_:--====--=-----

gm g.g ;

_,,: = :. = = = =..: =-

: _ ====== a _ : :_

103

= = z: = = = "

r: ~ ^ --~ _ : : - -~== : =-

. := := = =- u g

i +5.= 3 in 3 4 iM4 - : r-f i -- -u! = -I E4 MW_M='-

i Tl'- i._$1-l '. _ P-- ~ 2-$ i.---52--

- -~_N-~~.'*-

=_ ~

z :_ :: __ ---i -

r

_ _.=}=_s.h =i = :4

~=5 ; ===== =.._~___::. --~= 2. __..~. __ ; ; _ -

.._ ; ;. _5_f.. = f

.._z_-__

2 --

2

."-_.'::... : _ ~=..=_

9 10'

~~~==;; ;:::; :

_ _. _. _ _. -=

: :: : =_. _2 _ _: =.__. : :::

, y- _, m.24 = === _== m _ =

= = ===== = = n-;..; n..=.:--=a

._;.-i

- _ = _- = j ; ; %. i.1...c. 3._... i __3... _. _

..... _ 7...

..m_..

d

____: 2 --

a

_a


_-:.__==.:

=:.....::_=.

.:=

2. : : : ;-..---

r ::=

a_

.. =

- = = _n. - -- : _-. ; =

_ =. :., :

==_

...=_=.:;=.-..

..s

...:: : - =

_ : = ===.=_: a = = =. : _. =

_ = _ =, - - - - - --

_. _ = =

. _ _ =

= = : -. u : = = = : _ -

- - - - - 4. - - -

= 1 === = = = = m : = = = :==--

1 -

1

.=----- _-

+---- -

10 f

25 50 75 100 125 150 175 200 225 250 275 300 325 350 73

RM-A3 (Auxiliary Building Ventilation Exhaust)

Gaseous Channel Readings vs. Time 6

10,

4 4

e-a 2

6

_ =:=

10" i

[

S d

.=-.__=.____=_...=__=--_.:_-_--- - - --. =. =

= = = = -

m M.

4 10 g

T,,101

__ _g. 5 -

.....;___.;-..___y.=_.__

..:=..:_===_ _ = _ = _ = _. _.

3 m--

CPM High 4.dx 0 )

=__-.

==

_.,_._p_.-..._u.:-_=___.. _. _ _ _

_ _ _ - - = _ _. _ ___.: : :

-. _. =_ __ q = a.; =. ; : ^-

==_. _-[.._ -_::j.. :_=. ~. -._.:._.

";- =

103

___t-_______..._.__

T=98 1

4- -

s y

__.s._.______

l

' -== -4U_=i 4==

---Z M

Alert (600)

" ~ ~

+--

%=

l 6

\\

-=~:=...... _

-_--u__=--

i

._~

- =_

__ = = _ _.

-_--2___

_. _ _. _. _ = - _.

2

_- ~.=__: : : =. _:.=_ :. -

: : :..._..:._-___.._=....._

10 N

8,.

N x -

_...._-_.__-....._....___-_m-__-

_ _ _ _ _. _ = _,.

t nd l__.-

- _-- -' = x - * =i

4. ?

2__;_.M i.M 2 2.'. w 2. _ _. i i

._.2

' 5'_ ~f :.i. ~ Ei ' - -

- ~i: 5 - 1 N : ~ i i - i-s is t d. - ! := 5-d

.I.___

~~

1 ---

~

____--.=-.2

__: : =.=.:.,..:::- ::: : -

j

= __;_

- r =- - = = : _== : - : : : r.: _ :. : -.:..:.:.-

-- -. _... ___ __ _.- : _ _._n_=_ __ : : :

I t

0 I

25 50 75 100 125 150 175 200 225 250 275 300 325 350 i...7. 9,v r e s v v..r r

. -_ =

i f

l t

f RM-A6 (Auxiliary and Fuel Handling Building Exhausts)

Gaseous Channel Reading vs. Time i

6 I

10,

+

4 9

?

b I.

r I

i l

w l

10.

.7

)

t, i

6, 1

L

.. = _ _, _.

4

==== _

- - - -._=

t T_

_ _ _. _ =

1 t

g 1

1

--~ 2x10(o..

' ^ ~ ~ ^ ' - ~ ~ ~ ~

. ~

i 5, -

- - - ~

  • =

g

=. _. =. =.. =. - =. = =. =,. _. - - - - =.. -

= -

=. = _ - _ _ -.. -. _

u.... _.:...

__:._.==_=-_.._.

- - - - - - - _ _ _ _ - - =. =. _ _ _ - _ = -

-__=:--

=

=.

CPY*

.:.-----=:=------

T=100 _N i

-_ _=__..__-.... _ __. ___...... _

_ _ _ _ _ _ _ _ ___.=====,-=-=.:==_=_=---------.

3.

1 Alert 2x1

_=__.._.__..=__=_3_____=_=__.=_=__-____=:__=.=..

3 y_

s t

_.__.s r

g 3.. _ _ _

i

__._.v..

_.g_

e-==.sE H-4"#.

= '-._ ?

==='G

.=;= ZE -:- -

Ni 3

=__.-_:..=:==__.. =_

=.. _ - - _. =. _ _ =.. =. _ _.. _ _ _ ---.

i t

r ww

..=__:.:_-___ _.._ _ _ r ~_,__-- %. _ a : -- - - -_.... _ _. _.. - ::

. : - : :::.......::-==

",;=-

+

m.

_ _. : := ::=__

10;

,...c_==.._.___

t

- _ - -.. - _ v ':M. :e.

~

4

,e.

_ _ : ~~ :n: '.~*;m t

~ '

- ?.

s c

m

),

9. E5

~ '

='E"===M-7

^ 2i:5".4 2_2.-J:1L4+J

_---,G---4----

_ - i ' 41 i i -E 4 4-1 'M - @ ^ -

N - :- i[:

?

II._ _ _ - - - ~

' L - --'

=ra-!

-' -=:; 4 r:: = = :. - 3..::_i i i =.::- -i : : - I : - : : -i :... _ :

(

... :.: :. := --

=_-_= :_:: _ : -. a :,_...__.._.:____._

l

-r 1

10 i

25 50 75 100 125 150 175 200 225 250 275 300 325 35.'

1 i TTMC fMiMitTCCi i.

h

.-.,,-.,,_e.y....-,,,.,w

%._.y._w,_.,,-___.,_,_,____%,

_,,-.,,.m_.,-.,.,mr7.

..--m-.--

.m.

RM-A6 (Auxiliary Building Ventilation)

Radiciodine Channel Reading vs. Time 6

10,

s 6

4

-'-"'-"t 3

10*

e, t

5 4

,;.__-._=_:=_-

-=-----2.:

--=_==_...22---

_^-

T=105 10-g r__..___._..

High (8800) l

's rm = g = -.-.- a a - -, - ---i ;- a =--3 = _= __.

=-

-- -- A = _2 a =.: = =._2 _.: : = 1 =i _a a = = 1==

=--

+ - - -. - :.:. =

CPM y : =- - - -

MIN T=101 '

103

-_.==---:=;_=:.-_-=_=.:.=..___.".-=.=. =2 2

=

E====E+

iE =+C=-

E --- ~ =


~

~~

_-x

- -=____.._..:;'_______.__-

r e

s. _--. _ _ _ _ _ - -.. _ _ - _ _ - _ _ _ -

g.

Alert (1100

. s__

y v._

...._g

___ _ g_____

~

_=_=._=__.__5.5=__=_=3.=:_.T_.___._z_-=

=.=--.=.=..=.-=..__=.E..'.-.

..K

-_. - - - _.._. 2

--_-.--:....-_==-_.

L_------

.'~.%

=

--_.:;====_.__=:_---, -- -

. =

9

~=: _==

.=- : : 2.:.

- -==.: : : :. :

_.__.._._._._.=._':::.

IO_

.
.=. _ _

.'_m-

-~

_1_.._,_-._-__-

t a = : = ~~~ -E. ;-G^ ' =~~-- ~ ~-- --~~d =---~ _ :. =~- ~~ t % =E -.; =..:.==;L.;+

2 =

_J__

=-!

-.a

^~

. ' ".. _ _ ~~-- ^

_. ii 5 ' : '1: ~ 5-fii *t544 -i : ! : 2d ~~ ! - - :-

=: _ : : _ : :.: :. :... : : =_:_ :_.......

. ;._. 3 _

4.

..__.__________._.g3._____=_zg==.

.- _, -.= = :. : =.-.. :... :.: :. :...

_._.___.====-_=_.=_..a.

=__=.=:==_._:=_:=.._=_=____.=__

=_-_

_ ; :. _=__._

10 25 50 75 100 125 150 175 200 225 250 275 300 325 350 RM-A8 (Auxiliary and Fuel Handling Building Ventilation)

Radioiodine Channel Reading vs. Time 6

10,,

g

.s

_. _ = - - _ _ - _ _ __--__..

= _ - _ = - - _

= _ _ =.

d 10".v.__.,____.

4

_. - - _ _ _ _ _ _.. ~ _ _ _, _ - _. - -. -.. - - _

-.._._.__..-_n

= -

4

__ _ _ _. _ _ = _

10 r__.

_. _. _ ~

g.

x

.., _,,, _. _ = _ _, _ _., _ _ =. _ _ =.. = _ _. _ = _ _ _ _

= _ = _

3,3og

,e - _

s__

_________..___=_..;_.;.__

-s----_--...

x +-

CPM m

s Alert i

-_g..-s=.2..___=--=__==__5.__

m-

_ - = =

_ _ =.. _

=

(3100) 2: =_ _ _-- u.:= - -

---=_:=

~-"---~~~~~~--:-:;.--

103 N

=-

_ _ c._

______.__.g g

.x

___x...___

_x..________

w.L=_-M 1-iM - = -wr
t ? = e
Mai=

N i- -

_ ~ --i ~. ' ~ -~ ~ ~_ _. 5!I.~=.~- - ~~_f M M 'r

-N

~

- _.__.____===w--__=.=..m__--._--:.=.____-_..

- _ : _: 2 : : =. : : : :.:... :.

---::=:=

3 -

m

=_---:._.=_=__.-.=:. _ -... - _ _ _. _._..___==._:.-

---n 8

-~ _ -.

c

= =-T: -nzz===== =M m = _ - r--r=~== = - =E

- w -M

= ? + =;- -


i -- -

.n-_----

_. = =5. =..-.g c. _ _.:i. _. 4 =. _ i. 2.. =

. :n.

)

- l..__

_. ____. _:_: = _._.:..

a

=

-. _ ;. _; ;2. _._-_-_--_;-_=,=;.-. =._ =..= - _:.: = _ _: : :_:, _5 : _. : : :

_._=.: _ : : a -

- n

_: _ _: :=

.:- :: :==. _ _ :::uu: = r n : =: : 1.2 : =

1

=

10 25 50 75 100 125 150 175 200 225 250 275 300 325 35 _....

o......__s

a RM-A9 (Stack Monitor, Reactor Building Purge Duct)

Gaseous Channel Reading vs. Time 6

Off-scale at T=ll2 10,, _ _ _ _ _ ~ _ _ _ _ _...

)

.a

. - __m___ m_____

___m...

,

=____=_

..-1 d

3

._;___2_____

5 10,

g

__ T=107

\\,

4 4

3

--=1==-=_=_=_=_==.=,i--------~~-'.'=.'_==-

a = === = =.==-e ~_ _ _ _ _ _ __ = n 2 - ~ -

_-__==__;==_;=-------

4 High (4.48x10 )

~ ~ - ~ ~ - - '

= ~ " -

3

_3,.__=__=

,_g;__.=__.

4

"----== 7---~

E -- __.. _. _ 4 -.._.. _.a _ _ _ _ _--

l0,

~

T=105

_,A,. - _Z. 2 - - -

_____1 n

Alert (7100)

p _. g. : j : _. i m.g. mm___:
==;rw_ =. =. = - =_=.p-q =5e =+ ge==5

~ _ _ - ~

m __3

= = =- = p' g _.., _. 4. '. ; _. a 3... _,~ ~ -

. - ' - ~ ~

= _ - = =

==..g...

5 __ga.

CPM 2

- - _ _. _ _ _ _ - '~_~ __ ~

~

q_~.-...--_.

-~--

= _ _

_ _ _. _. _. _.. _. ~.

=1....

__._._g__.__..__

.. _ _ _. - - =.

=_--- ;. = =_==,=:.= - -}.:. = : =.=. _:====_ a.: _ : Ea _-.=_ --

:== =.--

= =.

= :-

103

- :: :=_ i___=_ _=_ -a -

.=_1 r.. r__ _i _ _ __

4 _

1

,i 8

~

_. ~. _ _ _ -

_.,..__.__-_y I

E hi 4. l.i.

- : ~3N N N M - '35 5 -i b-E- }- 5-I-E-h-i ' h ~ b 5a

  • j;

~ i

~

i5 g

. - =..-. :..

_: =3 _ =...&._

_ =.=_ -i__-j e_ +.=.-e.

..4 2. =. =..] i =.. - j -...: -

.j

-. j... :

= - =.

3

. =: :-l::: t ::--

= - _ -

x

--t :=== = : :

=. _y 3

=

.= = =-=f _==^=. :. ) :2. i:nh_ = +

L : = -i..

L==-

k-isi1-iii

._===

2

==---

-. -h==:1 -& =

-=..:--

-. = _ _. ; - _= = =: =

.=1:=.::

10

- __._., _=

: : 3 =_.=._=.. _=_ _.3._.:..: : :.

=- --

g g

__+

g w = 5=i -4 = u _w.2.p.u -

4: w.z a n. c-i -;-- ! + = -- m

e. = ? "_w _4 4=__em =N =r += =
.;=s et.

_ =

m.___

, __- n -- :

__-,--:--===---

=-- n.- -.. --:

.. _. _. _ = _ _

.______,____.3-.__.__

2

_ _. 4 - -- -

==

r==_.

=._3 m -

4...23_e3 1

_) --

. ~H==- =. _. =

- = = =.

-- g _

- -:3== a = :..t

=

_=...__

=

=

=

==

==

10

.-+ 1:::

_irm r:nrr~

ni:L - _ -

25 50 75 100 125 250 175 2T 25 250 275 200 325 35r TIfE (MINUTES)

O RM-A9 (Stack Monitor, Reactor Building Purge Duct)

Radioiodine Channel Reading vs. Time 6

Off-scale at T=120 10,.

g e

a

_ _ -.. _ _ _ - _ _ _ _ _ =. = _

- - _ ~.

_= _ - _ _ = _ _ _ _ _, _ -

- _.. - _. __,. _ _ _ = _ _ _ _.

=

a 3

_ _ 3.p ;.c_:.r=.ig. =, - --== _--- - --- -_ _ _ _ _ -

5

- 1.0,

7 7

6 S

______._________._;.___.=_;_;_.;m.

_,.m ; _.m.

_ _ - - _ _ _ = - - =_. _ _ = _----.==.;_=._=--.=_==.-:---=.___..__. _. - - - = _.

=_;

.. =..

-_::_=:_===.--:---_.=.==-----__

_-. _ -~ - =_.=.=. =_ = f_==~._"_.-.._=_

~1*:" * * * *.:.. _ _

=-==.. _.

r....._ _ _~._._..__ _.._.._._._..=... =_

10,

s g

:==~Ei; Y:i^-i~_L=_' W E=- M =-%==^=. Kt3t =T_: i = = =. + = ; -=.........'4 *--
  • W i:#:r=<

~

==_:.: =. ;_.,. a


=1==

n

- - - _==.====-.

. :... _ -. = =.

_._;_.:_=_=__;..=_-;_-==_=._--..-

__. :- - :. - -. - : = : -

CPM 3

= _ - - - -

High (4x10 )

MIN

=.

:r = : : : --
2. 2. __.._._.:._ :. _: : : ___ _. ::-. :

. _ -.. _ _ = _ -.

103 g.

^= i4 i--l-3-5 ? '~ 5-

- 4U3 + -- ! 5 3 W-s-r4 t3-i *--@

~

i :T:::-t--i -W =.== if=i-N Lh:-a- = = M-4 = =-! : =

3

..._2_=_-

.=_

- 42_-1.. _%-_.Aler

.:_=._=.===__=---.__. -=_.

._____.:.....:..:.::.... = :

. _ _ = __ _ _

. : 1 = :.: : : :==

2

= = =. - -

_..__....=.::=__:.._=._=..:

2, 0

g.

_~.

_.9

---e

_..___-.e

_. e e. _.. _,...

__.._._e

._e q

' i. M-i -

W~2117
' 5) _i "51a*ff ~:) "? ? d. f= 5H# 5 5 - i ': 4.2_ M W i4 '

_ :=


_1.___.-;

--____-_.=_.:_.:.-=-=;.s.....=~

i-.

x

-- - -- - - : = _: : - : - -

a

_-: _.__: =... ! : 2_:. :==.:.

_-___1._-- - - - : r _ rz. = : r;.: : g. -....:.-.; }. : ; : -.= ---

. -=:

. = =. _ _ _ -

4 ; - - ----

__.....:: : ::.:n...._ =_.

_ - :=_.= _:= :.

i......

._._._.__:=._

1

=.__ - -

y...

10 25 50-75 100 125 150 175 200 225 250 275 300 325 350 -.

.....uu.

1 RM-L1 (Primary Coolant Letdown Monitor-Low Range)

Readings vs. Time 6

10.,

1 i

T=307 f

i

.x

_ _ _ _ __ _.._.,.u.__,___

m

_m___-.-..__

s c

f'+

High (4.57x10' 2

_ _ _. T=275

-w

5 5

e' '- Alert (1.65x10 10 i

e

__f.

1-t

_ - s__

. _ - =- =_.. =... _ _ _

_. - =

=-:-=.. _.

.__ - __ --._=

n____

_.,_=_;._ __

. _ _ - _, = _ _ - - _ - -

_ = _

_______;_.;____2..

_____.g

..=.:

_ = -

10.,

g

't, t...,.

=a - :._:. y - ---

==-.=.=_....=.~=.,:...:,==.'=...._

==Li

.. ~ _= = ^ -! X = ~-Q ~. T_^ -1:. -D._

L~a.. _ J =3 i L===i = = W ?. i ===

+-i i # - - = = +- i

=

- -- - - - _ - = -.

== --

t

. _ _ _ _ _ _ _ _ _........ : :_-.:.: : a.. :..n =.=:

. _ _.= - : :.: - -=-. :

.-4

.:2.:..__._.._____:.:.=_::

_ _ :. _.... _=._... _._. =._ =

=

10J g

t t

,' WiC.-M 1 W-M :EF : W E R :=- ++~i i-M=i : " - - 1 i-e

--i= i=M- -P '_. "#frM-i." ::f =- -----4-i : ~~ ~ i : - : *.__

~ i'

~.'....

3

...a...

...=:. 3 '. :.

= =.= - -__..-_. __._. _ _...._ :.- - -- L:..._. - - _... =_ '.. _. =. _ =.. =. =. ~

10

.'=~= = =. =. = _ =

.:.=_

_ ~ ~ = ~ = _ '_.. _

~

... '......~.,'.

~. '. '..

' ~.

4

.....s..-__._._..

g g.

.. - - -. - + _

_4 6

~

^-Qd j S,_i.~firy r 9 a=- _:-- i ?-i ~~ #~= =[ _--' = = 4 -Ri.=.~4 q ~.4.j.44 444!:iIJ.. a i..;.-4 i

~: '

. a::

.~

~^".:..~. ~~. s : :... *.. u

  • 1 * * * * * * *. ;.. _ ::

6

__'~_'.._._.._._.."..'""3._."..t!"

  • 1

.~:.'_~_.'_=..~_.. ' ' ^ ' '

"'~.'.. ~ ~ ~ ~. _

    • ~~3 7

...-...,_.......~~_

  • * **! 7 7 4 *.... ' "... _...

4 J _"-

.=6

.,y

.:...... ::;a.

_- _c............&y.

...j ;,..

cr _ -

:. := =. : ~.= 2.. a.----.__:

' : :.. : 2 2..j-.

.*-*2-.__

. -........... _....g.pbUN.e.

1

'. _ _ -MW g.w y

4...

10

.P.M M-_.-*

. -... _ _ ' ' _..4b.

6ee 6

... s h

25 50 75 100 125 150 175 200 225 250 275 300 325 350

_ gp.

..n.

.f...._

V RM-L1 (Primary Coolant Letdown Monitor-High Range)

Readings vs. Time 6

10,

g s

=_

a n

e

= _ - ' - - - - _-

3

- - - ~ _ - - _ _

__-~-

__a 5

'1-

-~-

10

-== __.:-52-1 *====I'====_- = d ===# : - '.=. ih= =v = e =_

=__i =
::_._.=+t': z 1 1: 25 _

_= g.

_m___

_ 7_

--( _ _ g_. _ _.

.=

___==

4

-==-:5 T=300 E -j_ __ -- --- E r

_..___._.....__.__.-..._..g_f'._.__=__=__

0 1

m, g

u-A -.

...f1

._-__...../-

High (8000)

=f-

= = =st _

-L

= y==

= 2 i =. = = = =i - = = = -

- j gc-- =-m.s -u =t =_t.2 -

=

.=.=_2-

= = - - - - - - - - - g

. i i : - ! _ y=--

T=285

/ = - = : 2 = =i CPM

_-__.;_.--
---__A-;_--._-----

__ f_-\\.

S

~ _ -... - -

.. - ~ ~ ~ - - - - -..... -

-J_M7 2N=7'![-5.:. j-! Alert (3000)

~7 1

10s

=_==._._=__=_..__=_._.::.::.=..=..__.___-__-

r--

f c

g

..p.

____.__f__._-.._.

j._. _ _....

)

T-5 5 4.H i-I Tf==% t 2 = 03 - ;-~ ~ f1 i ;-

55

; i M5
-~~.i - ' ~ l
  1. -F-i i-is' F: --- -i : C N-3 ' ~ ~ ^

~

7

1...

2

-. a-i _i-Cih 3 = = ;- = = - _~~j = &i:^~i.+ ; H..ssid =_i 1H. :..-.'

~~

... 12.; ;r

-r ;_- :.

-- - = : : : : : : : :

2--r-r = : :===

10

::. :. ::: : _T.: D _ :.: *

' ::-~. :. :.--

g


n--~~_--

- _ _.. - - ~ _ ~......

t

' l ' ' ~' -- ~- l _. _ _ __ _ __ _ _.! -- 2 l-iM i P_

M ~425

"'M+4i2-~-I#- -----

- - + f * ' * - E '

--M

'h N *

  • ? ? ? ' ~ $ ' ^- ? 5 * -5 -' :Y _ _k _ ~

A._$.

-?-
b

. = _. = -..

--- - : _=. _: _ =_..:..: _ _.: __1 : :._.

a.4

_.,....... - - - e --

n

...__,._4

_ _3

- _3 - ;-__. 3 _ g_

J - 3._ j i,:

g...
. :: = -

- - --;_:-.3

_.u

_g._

=: - -t = : :_ : :

1_ _ :r -

1

- __._ _. : 21. ___ ::=::. _. l.:::r : :-. : :.3. :=: =:=: : =r==

r 30 25 50 75 100 125 150 175 200 225 250 275 300 325 350 -

  • I. s.. * ;,* *.i, ;;.

Gamma Exposure Rate As A Function t

Of Distance From The Rdactor Building Wall

?

Turbine Bldg.

Service Bldg.

Control Bldg.

Reactor 7

/

Bldg.

i Fuel Handling i

l sidg. '

\\

Di sel l

+

G n.

0' i

e

s _

/

s g

60' 600 120 s

s 150 180' 70 240' 40 300' 25 360' 20 feet mrem hr w

M 9

3 g

m "

~

n +-,

9 9

3 8

- 0

- 0 0

0 1

1 1

1 I

x x

x x

8, 9

1 l

1 w

~

0 1

E S

Y S

9 9

9 8

8 8

8 0

0 0

- 0 0

0 0

1 1

1 1

1 1

1 I

x x

x x

x x

x 1

2 4

8 1

2 1

1 7

E S

Y S

9 9

9 9

8 8

8 7

7

- 0 0

0 0

0

- 0

- 0

- 0

- 0 1

1 1

1 1

1 1

1 1

l x

x x

x x

x x

x x

1 2

6 7

1 3

6 8

1 3

5 E

S 1

S Y

70 70 90 80 8 0 80 80 80 80 70 1

1

- 1

- 1 1

1 1

1 1

1 I

x x

1 x

x x

x x

x x

x 1

2 3

6 7

1 1

3 6

4 8

E S

S 1

2 Y

90 80 80 0 0 80 80 80 70 70 60 60 1

- 1

- 1 1

- 1

- 1

- 1

- 1

- 1 1

- 1 1

x x

x x

x x

x x

x x

x 1

8 l

2 4

7 8

9 2

4 2

4 3

.c E

S

)

5 0

c

/

S Y

1 cu

=

9 9

8 8

8 8

7 7

6 6

5 0

- 0

- 0

- 0

- 0

- 0

- 0

- 0

- 0

- 0

- 0 1

1 l

1 1

1 1

1 1

1 1

1 8

x x

x x

x x

x x

x x

6 l

l 3

l 1

2 4

3 1

7 8

2 E

1 0

0 0

S 1

2 3

S Y

r h

70 70 60 60 50 50 m

/

r 80 80 80 80 80 70 70 1

1

- 1

- 1

- 1 1

- 1

- 1

- 1

- 1

- 1

- 1 1

1 0

x x

x x

x x

x x

x x

x x

x

=

l l

2 4

6 8

l 2

3 6

2 4

l 2

I N

h E

U 5

S 5

L._

1 1

5 0

0 0

1 3

4 S

y O

R 50 50 40 G

8 8

8 7

7 6

6 6

6 5 0 1 - 1

- 0 0

- 0

- 0

- 0

- 0

- 0 0

- 0

- 1 1

K 1

1 1

1 1

1 1

1 1

x x

x I

x 1

x x

x x

x x

x x

x 3

6 l

2 1

2 2

1 0

C 4

5 3

2 6

E A

S 5

0 0

S Y

B 3

4 5

0 0

0 5

0 1

1 1

4 6

1_

2

. 1 )

l

s RKme 5

5 5

5 5

5 5

5 5

5 5

5 5

A 1

V t

lt T

As i

0 1

2 3

4 5

6 7

8 9

0 1

2 3

I.

1_

iig.

1 t

1 1

l I' Tn(

)

E 1 I 0

0 0

0 0

0 0

0 0

0 0

0 0

g 0

2 4

6 8

0 2

4 6

8 0

2 4

6 t I i I =

3_

3 1

1 1

1 2

2 2

2 2

3 3

e THT h

(

,E l

~

~

90 90 90 8 0 1

1 1

1 I

x x

x x

7, 8,

9 2

1 0

1 E

S E

Y 8

8 8

8 9_0 b

- 0

- 0

- 0

- 0 g

_ 0 1

1 1

1 1

1 1

I x

x x

x x

x x

p 6

8 1

2 3

4 1

m 7

E S

Y E

80 80 70 70 90 9 0 g0 80 0

- 1 1

- 1 1

1 1

1 1

- 1 x

x x

x x

x x

x x

I 5

8 1

3 3

r, 8

1 3

1 5

E 5

1_

S Y

E

_7 9

9 9

8 8

8 7

7

- 0

- 0

- 0

- 0 0

h

- 0

- 0

- 0

- 0 1

1 1

1 1

1 1

1 1

1 I

x x

x x

x x

x x

x x

1 7

4 a

1 2

5 8

l 3

3 4

8 2

E S

E f

0_ 6 9

9 8

0 8

8 7

7 6

- 0 0

0 0

- 0 0

0 0

- 0

- 0 1

1 1

1 1

1 1

1 I

x x

x x

x x

x x

1 1

1 x

x x

2 4

6 8

1 5

l 4

1 7

9 1

3 c

2 3

2 c

E S

1 1

/

V E

cu 0

7 0

7 7

6 6

6

=

1 0

70 0

- 0

- 0

- 0

- 0 90 8

8 0 80 8

1 x

1

- x 1

1 1

1 1

1 I

x 5

0 1

1 I

x x

x x

x 5

x x

h 1

8 1

l 2

7 2

i l

2 l

3 6

E 5

0 2

5 1

2 S

5 E

1 r

h

/

r L7 0 70 0

60 6 0 50 50 m

80 80 80 80 70 7

- 1

- 1

- 1 f

1 k

1 I

- 1 1

1

- 1

- 1 1 x

x x

x x

x x

x x

x x

x x

=

1 1

2 l

2 3

3 4

l D

3 5

6 8

r 1

)

l N

E 0_

0 0

5 8

8 1_

S U

3 4

1 4

E Y

0 R

8 8

7 7

7 7

6 6

6 5

5

_5 0

0

- 0

- 0

- 0

- 0

- 0

- 0

- 0 b

- 0

- 0 0 -

1 1

G 1

1 1

1 1

1 1

1 1

1 1

t x

l x

x x

x x

x x

x x

x x

b 7

1 K

3 5

1 3

6 8

l 2

3 G

2 0

C E

5 5

5 5

0 0

0 0

5 0

S A

Y 5

E 1

1 2

3 4

2 5

1 2

B E)

. : s l

H EEr e 5

5 5

5 5

5 5

5 5

5 5

5 5

MV A O

l T

i 1

2 3

4 5

6 7

8 9

0 1

2 3

A S II.

1 1

1 1

l RI M l' TI (

)

)

E MN 0

0 0

0 0

0 0

0 0

0 0

0 0

=

2 4

6 8

0 2

4 6

8 0

2 4

6 I I TMT O

1 1

1 1

2 2

2 3

3 3

3 e

2_

a 2

(

,g' l

ll

I Y

W 9

8 _" 0 7

1

~

- 0 0

n x

1 1

i 5

x W

I x

v 2

7 i

1 C

Y

?

r 8

8 8

7 7

~

1 5

- 0

- 0 0

0 0

x 1

1 1

1 1

1 5

h5 v

x x

x x

I W

1 2

3 6

1 2

5 8

L.

1 Y

6 7

7 7

6 0

7

- n 0

7_ n 0

0 n

0 n

8 8

7 1

n i

v 1

i i

1 i

1 1

i v

I E

h w

r x

v x

x w

6 M

1 p

3 a

5 r

z t

i 5

2 5

a n

2 a

2 1

Y 1

1 1

0 0

0 0

0 n

0 7

1 71 6 i 61 6

5 8

8 7

1 71 7

1

- 0

- 0

~

x

- x x

~

x

- x v

- x 0

- 0 1

1 2

1 4

4 6

4 1

1 4

x x

l x

x 7

3 3

s 5

1 1

4 9

4 M

2 5

c 5

2 2

2 a

0 c

1 1

1 3

2

/

]

Y 1

cu 0

[

0 0

0 D

0 0

0 l

0 0

1

=

61 61 61 6 15 x 5 x 50 8

7 71 7 1 1

71 1

- x

- x

- x x - 7

- B 1

x

- x

- x

- x x

I x

I 4

6 3

5 4

M 4

R.

4 J.

1 L

8 1

?

5 i

1 1

1 3

]

W 0

0 5

5 5

5 5

5 0

0 5

0 1

2 r

1 2

3 4

2 5

Y h

0_

/

[4 p

0 0

0 0

0 0

r 80 70 7

7 0 70 6

6 1_ 61 615 1

5 1

1x m

i 1 x

- x-x

- x

- 1

- y 1

1 x

- 1 2

3 1

l x

5 4

7 f

x

=

l x

x n

x 1

8 6

6 L

3 L

1 3

9 L

1 D

7 L

)r 1

i i

l C

f 5

0 0

0 D_

0 U

q 5

9_

1 4_

1 3

4 0

0 0

5 l.

Y 1

2 O

0 0

0 0

0 0

0 0

0 D

0 0

0 F

1 1

1 10 1

5] 51 5 ].5 4

4x 4 x x

1 7

7 6

61 6

1 1

x - x x

- x x

G 1

- x

- x 6

8 7

x x

l 2

7 K

4 8

4 8

4 3

6 7

1 4

6 1

3 1

2 1

3 l

1 1

3 m

6_

0 0

A 2

4 4

0 0

0 0

0 v

Y 1

2 4

8 1

2 1

4 5

0 0

5 0

B 2

5 2

1 g)

. es 5

5_

5 5

5 5

5 5

l EEgl 5

5 e

5 5

G L

1 2

3 i M i. i 1

2 3

4 5

6 7

8 9

0 t

]

1 1

1 ll.

3 R: M.

I l' T9(

)

E l l l f 0

0 0

0 0

0 0

0 0

0 0

0 0

W

=

2 4

6 8

0 2

4 6

8 0

2 4

6 i l 1

1 1

1 2

2 2

2 2

3 3

3 3

Tf T 0

i

(

4?

)

i e

s

.~

es t

i e

i 7-e e-e Y

1 i

a e

,e m,C m.

n.a v.

w w

w 6

<\\

'/\\

3, m,

,C C

C C

C C

o o

e e

'o O

C X

x X

x X

y.

y.

.x 39 CC e

CC C

tr N

CP F

x x

x r

m N

N C

C Cf a

C f

C W

C

[

E O

C C

C C

e C

C Gw w

a w

a

~

s e

C C

C 7

v v,

N 7

T T

T Ln C anl so

'O C

C C

C

'Q

'C

'O C

C D

N X

H

)

N X

w C

x x

N'

~

X x

x X

3 a

e e

m m

w v

a C

C W

C C

e C

y C

C O

C tr' C

C y

C tr:

o C

C CN C

g q

m gj If N

N W

CN M

C N

m w

v v

v v

v m

g g

g g

I e

3 1

N Ln '

W q.

c C

C C

C C

C C

e e

e i

e C

C C

C C

C x

x x

X

=

x, x

x X

X

>l X

CN CN F

(C k

n ye

~-

M n

1W C

C C

C C

m C

C C

C C

C tr C

C C

N C

C C

C C

C g

N v

CC F

W C

(c CC M

n_

m is aw w

Q O

Q Ln "g#

5 T

$1 4

I e

a e

C C

C C

C to a

a e

e e

a j

C O

C C

Cl O

C C

r-x x

y y

x x

i g

X X

X X

X X

QF C

o V

W N

CN CD C

g g

g N

m C

Cl el Cl Cl a

z z,

o qg g

C4 C

C C

C C

C N

m C

m

=

m; C

q m

N v

I t

t e

o i i vl i

in i C

N, s,

e, e,

e.

e, e,

e, 6n, m.

m.

i i

Cr er C

C C

C C

C o

CM O

O C

C C

C C

,C e

r-X X

X X

X X

X e

N e

F N-O M

N e

t N

P M

M M

x x

x x

W w

w h

o C

4 4

W W

W O

C m

o c

w M

V e

~

m

~

m a

o Z^

-' 'J D*.

Ln.

sn D.

g y <-,

Ln.

an

'L 'sC

  • )

D.

D.

D D.

w D.

tn.

w sn o

e o

N m

v in e

N cc e

o N

m c-

. y d

O *.- O V j i

i i

i

^

'0-l o

e e

e e

o o

o o

e o

e' o

o o

o.

0 -.r' Ch C

N 4

c CO O

N v

c CC' C

N v.

W.

~-

c-N N

N N

N m

m M

M-Q~

l e

f I

Y l

Y I

Y f

f b

6 50 5

40 4

4 3l

~

- 1

- 1 6

n

- x 0

0 0

n 0

n x

0 0

x 0

5 1

i s.

5 1

1 1

1 1

1 i

1 i

x x

I x

x x

x x

x x

x x

5 1

1 7

3 7

9 2

4 7

2 7

l 1

?

E 0

0 S

5 0

0 0

0 0

0 0

n c

s 0

0 5

0 0

5 0

2 1

1 3

r, i

9 7

2 3

3 5

8 Y

1 2

0 0

4 4D 0

3

~

7 6

6 5n S 4

'0 0

0 1

- 0 D1 0

- 1 0

g i

x x

x 0

0 1

l 1

1 1

1 s

5 I

1 1

x r

x 5

1 j

u x

x x

x x

x x

x 7

5 1

2 4

1 1

2 3

4 1

?

6 7

?

E 0

0 Q

0 c

S 0

g 5

n 0

0 0

0 0

0 3

0 c

Y 2

5 1

j 2

s 5

0 5

5 0

5 0

0

/

1 4

1 1

1 1

2 3

cu 3

3

d. 4 4

4 4

b b

b 6

50 5 0

- 0 0

0 0

=

~

- 1 1

0 0

0 0

0 0

0 x

1 1

1 1

x 1

1 1

1 x

x x

x 5

s 1

I 1

1 1

1 x

x x

x 8

2 3

4 x

x x

x 1

7 9

3 1

3 l

2 4

8 5

0 0

n E

S 0

0_

0 0

0 n

5 0

0 n

0 0

0 Q

0 0

0 n

i 1

3 5

o 0

0 0

f 0

1 5

A r

Y 4

8 3

3 1

I

?

h

^

4 3

l

/

h_ 3 0

4

~

r 7

6 0

6 6

5 1 h

0 0

0 0

0 0

x m

0 0

x 0

0 0

1 1

1 1

1 1

1 x

x x

x x

x J

1 5

I 1

x

=

1 1

1 L.

x x

5 1

2 3

4 1

l 2

x x

x 3

5 4

J D

7 l

)r E

N N

0 0

n 0

0 0

0 0

Q Q

0 1

2 s

5 5

0 0

0 R

Q 0

S 2

4 8

3 5

7 0

5 5

0 Y

U U

1_

1 1

2 3

Q J

0

. 3 7

7 6

60 5

6 5Q5 4

41 4- 0 k0 d-R R

~

1 6

- x 1

0 0

0 x

0 n

x 0

1 1

l 1

5 1

x x

x x

G G

1 1

1 5

2 5

1 I

1 1

x x

2 5

l 2

x x

x x

l 1

K K

4 5

l 1

3 7

?

l 3

C C

0 0

E 0

n 0

0 0

5 0

0 0

0 S

Y A

A 1

2 3

4 1

a 7

0 5

2 0

5 5

0 2

2 3

5 7

1 2

B B

.i )

,gs l

EE;e MV.3i l 5

5 5

5 I Ag 5

s 5

5 5

5 i

0 0

5 5

5 5

I.

0 1

2 3

rim I Tn(

0 1

2 3

4 s

6 7

8 9

1 1

1 1

l

)

E MN 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0

=

9 0

2 4

6 8

0 2

4 6

8 0

2 4

6_

I I 2

2 2

3 3

3 3_

R_

TMT 1

1 1

1 1

2

(

,E' i'

l

!l