Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000416/LER-1993-010-02, :on 931004,automatic Closure of GGNS Residual Heat Removal Sys Containment Isolation Valve 1E1F008 Occurred While RHR B in Shutdown Mode.Caused by Failure in Battery Charger.Faulty Limiting Card Replaced + (02:42:28, 17 December 2024)
- 05000244/LER-1982-016, Forwards LER 82-016/03L-0 + (02:42:29, 17 December 2024)
- ML20063K016 + (02:42:30, 17 December 2024)
- ML20063K015 + (02:42:31, 17 December 2024)
- TXX-3563, Interim Deficiency Rept Re Pacific Pump multi-vane Diffusor Cracking.Initially Reported on 820414.Evaluation Should Be Completed by 821108 + (02:42:32, 17 December 2024)
- ML20063K011 + (02:42:33, 17 December 2024)
- ML20063K007 + (02:42:36, 17 December 2024)
- 05000413/LER-1994-001-01, :on 940111,Unit 1 Reactor Trip Occurred Due to Main Turbine Trip on Low Condenser Vaccum.Caused by Fatique Failure.B Heater Extraction Line & Examination of Other Extraction Lines on Both Units + (02:42:38, 17 December 2024)
- RBG-40059, Monthly Operating Rept for Jan 1994 for River Bend Station + (02:42:39, 17 December 2024)
- TXX-9400, Proposed Tech Specs Replacing Existing Spec & Bases Re QPTR W/Spec & Bases Consistent W/Improved Stds TS for Westinghouse Plants (NUREG-1431) + (02:42:40, 17 December 2024)
- ML20063J993 + (02:42:41, 17 December 2024)
- ML20063J997 + (02:42:41, 17 December 2024)
- 05000373/LER-1994-003-01, :on 940120,LCO for RPS Instrumentation Exceeded Due to Freezing Weather.Caused by Unstable Grid Sys Combined W/Extremely Low Reserve on Comm Ed Distribution Sys.Ts Surveillances Completed on 940122 + (02:42:43, 17 December 2024)
- ML20063J979 + (02:42:44, 17 December 2024)
- ML20063J974 + (02:42:45, 17 December 2024)
- ML20063J973 + (02:42:46, 17 December 2024)
- ML20063J971 + (02:42:46, 17 December 2024)
- 05000322/LER-1994-001, :on 940121,determined That Violation of Tech Spec 6.7.3.c Occurred.Caused by Failure to Follow Administrative Procedure on Control of Station Procedures. Temporary Procedure Change Reviewed & Approved + (02:42:48, 17 December 2024)
- ML20063J965 + (02:42:50, 17 December 2024)
- ML20063J946 + (02:42:57, 17 December 2024)
- 05000325/LER-1982-091-03, /03L-0:on 820802,review of Surveillance Testing Procedure for Calculating Drywell Average temp,PT-16.2, Determined That One of Five Points Used to Obtain Temp at Plus/Minus 90 Ft Was at 86 Ft Level.Procedures Revised + (02:42:58, 17 December 2024)
- ML20063J940 + (02:42:59, 17 December 2024)
- 05000325/LER-1982-091, Forwards LER 82-091/03L-0 + (02:43:00, 17 December 2024)
- ML20063J936 + (02:43:00, 17 December 2024)
- 05000324/LER-1982-091-03, /03L-0:on 820727,several Relays in Logic Trains for Group 6 Isolation Valves Were Not Time Response Tested as Required.Caused by Personnel Error Due to Inadequate Review of Plant Mods in Jan 1980.Procedures Will Be Revised + (02:43:02, 17 December 2024)
- 05000324/LER-1982-091, Forwards LER 82-091/03L-0 + (02:43:03, 17 December 2024)
- ML20063J923 + (02:43:04, 17 December 2024)
- ML20063J921 + (02:43:05, 17 December 2024)
- ML20063J919 + (02:43:05, 17 December 2024)
- 05000416/LER-1982-030-03, /03L-0:on 820730,no Documentation Found to Verify Secondary Containment Integrity as Required Per Tech Specs. Caused by Lack of Procedures to Conduct Surveillance Test. Temporary Signoff List Used for Verification + (02:43:07, 17 December 2024)
- ML20063J915 + (02:43:09, 17 December 2024)
- ML20063J916 + (02:43:09, 17 December 2024)
- ML20063J914 + (02:43:10, 17 December 2024)
- ML20063J905 + (02:43:10, 17 December 2024)
- ML20063J896 + (02:43:11, 17 December 2024)
- 05000416/LER-1982-030, Forwards LER 82-030/03L-0 + (02:43:12, 17 December 2024)
- ML20063J890 + (02:43:12, 17 December 2024)
- ML20063J887 + (02:43:13, 17 December 2024)
- NRC-94-4062, Forwards Proprietary Quick Look Rept for Large Scale Pccs Test 221.1,AP60 Program, PCS-T2R-023.Rept Withheld,Per 10CFR2.790.Rept Describes Results of Test Performed at AP600 Pccs Large Scale Test Facility + (02:43:17, 17 December 2024)
- ML20063J879 + (02:43:17, 17 December 2024)
- GO2-94-040, Forwards Editorial Rev 25 to WNP-2 Physical Security Plan Per 10CFR50.54(p).Withheld Plan Per 10CFR73.21 + (02:43:18, 17 December 2024)
- ML20063J851 + (02:43:19, 17 December 2024)
- ML20063J853 + (02:43:19, 17 December 2024)
- ML20063J850 + (02:43:20, 17 December 2024)
- ML20063J844 + (02:43:21, 17 December 2024)
- ML20063J825 + (02:43:21, 17 December 2024)
- ML20063J810 + (02:43:22, 17 December 2024)
- ML20063J817 + (02:43:22, 17 December 2024)
- ML20063J792 + (02:43:23, 17 December 2024)
- ML20063J808 + (02:43:23, 17 December 2024)
- ML20063J790 + (02:43:24, 17 December 2024)