Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064G225 + (01:47:17, 17 December 2024)
- ML20064G223 + (01:47:18, 17 December 2024)
- 05000387/LER-1982-063-03, /03L-0:on 821127,seven Instrument Valves Determined to Have Been Left Closed Which Isolated Instruments.Cause Not Stated.Valves Not Numbered or Clearly Assigned as Operations or I&C Responsibility + (01:47:20, 17 December 2024)
- ML20064G221 + (01:47:21, 17 December 2024)
- ML20064G217 + (01:47:21, 17 December 2024)
- ML20064G215 + (01:47:22, 17 December 2024)
- 05000387/LER-1982-063, Forwards LER 82-063/03L-0 + (01:47:24, 17 December 2024)
- PY-CEI-NRR-1756, Forwards Annual Rept of 10CFR50.59 Safety Evaluations for 1993 + (01:47:24, 17 December 2024)
- ML20064G191 + (01:47:25, 17 December 2024)
- ML20064G189 + (01:47:26, 17 December 2024)
- 05000413/LER-1993-006, :on 930612,Unit 1 Reactor Trip Occurred.Caused by Blown Fuse in Range Channel.Control Room Operators Manually Throttled CA Flow to Control Nc Cooldown + (01:47:27, 17 December 2024)
- 05000338/LER-1978-063-03, /03X-1 on 780728:particulate Filter & Charcoal Filter Were Clogged.Caused by Driving Mechanism of RM-RMS-159 Filter Being Jammed + (01:47:29, 17 December 2024)
- ML20064G173 + (01:47:31, 17 December 2024)
- 05000338/LER-1978-063, Forwards LER 78-063/03X-1 + (01:47:32, 17 December 2024)
- ML20064G167 + (01:47:33, 17 December 2024)
- 05000338/LER-1978-119-03, /03L-0 on 781110:during Critical Steady State Oper Alarms Showed High Steam Line Differential Pressure on Line B.Proper Bistables Tripped,Placing Plant in Safe Condition. Caused by Faulty Instru Loop Pwr Supply Card in Circu + (01:47:34, 17 December 2024)
- 05000362/LER-1993-006, Forwards RCE-94-002, Reactor Coolant Pump 3P002 Mechanical Seal Failure, as Committed in LER 93-006,dtd 940112 + (01:47:35, 17 December 2024)
- ML20064G162 + (01:47:36, 17 December 2024)
- 05000338/LER-1978-119, Forwards LER 78-119/03L-0 + (01:47:37, 17 December 2024)
- ML20064G159 + (01:47:38, 17 December 2024)
- 05000387/LER-1982-066-03, /03L-0:on 821201,rod Block Monitor Channel B Bypassed Due to Improper Indication of Reactor Power & Failure to Set Up to New Power Limit.Caused by 5-volt Dc Power Supply Activating Crowbar Function.Power Supply Reset + (01:47:40, 17 December 2024)
- ML20064G156 + (01:47:41, 17 December 2024)
- ST-HL-AE-4718, Forwards Operations QA Plan Change QA-018 + (01:47:42, 17 December 2024)
- ML20064G153 + (01:47:42, 17 December 2024)
- ML20064G149 + (01:47:43, 17 December 2024)
- 05000325/LER-1978-080, Forwards LER 78-080/03L-0 + (01:47:44, 17 December 2024)
- ML20064G146 + (01:47:45, 17 December 2024)
- 05000387/LER-1982-066, Forwards LER 82-066/03L-0 + (01:47:46, 17 December 2024)
- 2CAN018303, Application to Amend License NPF-6,deleting Requirement for Monthly Channel Functional Tests of Plant Protection Sys for Jan 1983.Access to Plant Protection Sys Cabinets Should Be Limited Prior to Circuit Mods + (01:47:50, 17 December 2024)
- ML20064G124 + (01:47:50, 17 December 2024)
- 05000271/LER-1982-025-03, /03L-0:on 821201,drywell Atmospheric Temp Recorder TR-1-149 Found Inoperable.Caused by Failure of Servo Motor Logic Ground Connection.Ground Restored & Recorder Calibr & Returned to Svc + (01:47:52, 17 December 2024)
- ML20064G108 + (01:47:54, 17 December 2024)
- 05000271/LER-1982-025, Forwards LER 82-025/03L-0 + (01:47:55, 17 December 2024)
- ML20064G099 + (01:47:55, 17 December 2024)
- ML20064G097 + (01:47:56, 17 December 2024)
- ML20064G098 + (01:47:56, 17 December 2024)
- 05000334/LER-1982-055-03, /03L-0:on 821130,Operations Surveillance Test 1.47.3A Not Performed within 25% Max Allowable Extension & ASME Oct & Nov Monthly Valve Restroking Not Conducted.Caused by Human Error.Present Scheduler Trained + (01:47:58, 17 December 2024)
- ML20064G084 + (01:47:59, 17 December 2024)
- ML20064G088 + (01:47:59, 17 December 2024)
- B10638, Advises That Extra Time Needed to Respond to Question 4 of NRC Re Measurement Uncertainties Used in Safety Analyses,Since Final Designs for Several Measurement Channels Not Yet Finalized + (01:48:00, 17 December 2024)
- 05000333/LER-1982-054-03, /03L-0:on 821213,difficulty Experienced in Initiating Trip on DPIS-76 & Venting Low Pressure Side of DPIS-77 During Surveillance Testing.Caused by Incomplete Instrument Surveillance Procedure.Procedure Revised + (01:48:02, 17 December 2024)
- 2CAN018304, Application to Amend License NPF-6,removing Automatic Recirculation Actuation Signal to HPSI mini-recirculation Valves.Safety Evaluation Encl + (01:48:03, 17 December 2024)
- ML20064G063 + (01:48:03, 17 December 2024)
- 05000333/LER-1982-054, Forwards LER 82-054/03L-0 + (01:48:04, 17 December 2024)
- 05000334/LER-1982-055, Forwards LER 82-055/03L-0 + (01:48:04, 17 December 2024)
- ML20064G039 + (01:48:05, 17 December 2024)
- ML20064G036 + (01:48:06, 17 December 2024)
- 05000333/LER-1982-055-03, /03L-0:on 821214,turbine Steam High Flow Containment Isolation Switch 13-DPIS-84 Setpoint Found Less Conservative than Tech Specs.Caused by Instrument Drift. Setpoint Adjusted to within Required Value + (01:48:11, 17 December 2024)
- ML20064G026 + (01:48:12, 17 December 2024)
- ML20064G019 + (01:48:13, 17 December 2024)
- 05000333/LER-1982-055, Forwards LER 82-055/03L-0 + (01:48:14, 17 December 2024)