- ML20065A652 + (01:08:07, 17 December 2024)
- 05000352/LER-1994-005, :on 841026,determined That Main Steam Valve Did Not Have Proper Seismic Interference Clearance Which Could Cause Electrical Fault.Caused by Installation Error.Mov Power,Control Cable & Conduit Were re-routed + (01:08:13, 17 December 2024)
- ML20065A643 + (01:08:14, 17 December 2024)
- 05000278/LER-1983-006-01, /01T-0:on 830131,during Local Leak Rate Testing of B Containment Atmosphere Dilution Nitrogen Injection Penetration,Determined Valve Leaking Excessively.Caused by Scored Seat & Foreign Matl.Bonnet,Stem & Plug Replaced + (01:08:15, 17 December 2024)
- ML20065A633 + (01:08:16, 17 December 2024)
- ML20065A630 + (01:08:17, 17 December 2024)
- ML20065A628 + (01:08:18, 17 December 2024)
- NRC-94-4082, Forwards Nonproprietary & Proprietary Versions of Wind Tunnel Phase 4B Test Plan,Investigation of Effects of Siting on Wind Behavior of Westinghouse AP600 Sys. Proprietary Version Withheld,Per 10CFR2.790 + (01:08:18, 17 December 2024)
- ML20065A625 + (01:08:19, 17 December 2024)
- 05000278/LER-1983-006, Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted + (01:08:20, 17 December 2024)
- ML20065A617 + (01:08:21, 17 December 2024)
- ML20065A608 + (01:08:23, 17 December 2024)
- ML20065A611 + (01:08:23, 17 December 2024)
- ML20065A599 + (01:08:24, 17 December 2024)
- ML20065A594 + (01:08:25, 17 December 2024)
- ML20065A589 + (01:08:25, 17 December 2024)
- ML20065A587 + (01:08:26, 17 December 2024)
- ML20065A586 + (01:08:27, 17 December 2024)
- ML20065A583 + (01:08:28, 17 December 2024)
- ML20065A578 + (01:08:28, 17 December 2024)
- ML20065A568 + (01:08:29, 17 December 2024)
- ML20065A566 + (01:08:29, 17 December 2024)
- 05000373/LER-1982-087-03, /03L-0:on 820808,discovered That Source Range Monitor Rod Block Calibr & Functional Test & Intermediate Range Monitor Rod Block & Reactor Scram Calibr & Functional Test Performed 10 Days Apart,Violating Tech Specs + (01:08:31, 17 December 2024)
- ML20065A560 + (01:08:32, 17 December 2024)
- ML20065A556 + (01:08:33, 17 December 2024)
- ML20065A558 + (01:08:33, 17 December 2024)
- 05000373/LER-1982-087, Forwards LER 82-087/03L-0 + (01:08:34, 17 December 2024)
- ML20065A553 + (01:08:34, 17 December 2024)
- ML20065A546 + (01:08:35, 17 December 2024)
- 05000317/LER-1982-045-03, /03L-0:on 820805,control Element Assembly 33 Dropped to Bottom of Core.Caused by Erratic Upper Gripper Latch Action.High Voltage to Magnetic Jack Upper Gripper Coil Increased.Assembly Satisfactorily Retested + (01:08:36, 17 December 2024)
- ML20065A535 + (01:08:37, 17 December 2024)
- ML20065A531 + (01:08:38, 17 December 2024)
- SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b) + (01:08:39, 17 December 2024)
- ML20065A522 + (01:08:39, 17 December 2024)
- 05000317/LER-1982-045, Forwards LER 82-045/03L-0 + (01:08:43, 17 December 2024)
- ML20065A508 + (01:08:43, 17 December 2024)
- ML20065A499 + (01:08:44, 17 December 2024)
- SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station + (01:08:44, 17 December 2024)
- ML20065A497 + (01:08:45, 17 December 2024)
- ML20065A490 + (01:08:46, 17 December 2024)
- ML20065A487 + (01:08:46, 17 December 2024)
- ML20065A485 + (01:08:47, 17 December 2024)
- ML20065A482 + (01:08:48, 17 December 2024)
- ML20065A483 + (01:08:48, 17 December 2024)
- ML20065A476 + (01:08:49, 17 December 2024)
- ML20065A473 + (01:08:50, 17 December 2024)
- PY-CEI-NRR-1772, Responds to Insp Followup Item Discussed in Insp Rept 50-440/93-18 on 930917.Corrective Actions:Instuction Pei/Spi Revised to Remove Requirement to Open roll-up & Security Doors & Requirement to Secure Open Personnel Door + (01:08:54, 17 December 2024)
- 05000331/LER-1982-052-03, /03L-0:on 820809,during Normal Operation Surveillance Testing,Drywell Pressure Switch PS-4312C Tripped & Would Not Reset Properly Upon Decreasing Pressure. Caused by Instrument Drift.Switch Recalibr + (01:08:56, 17 December 2024)
- 05000317/LER-1982-046, Forwards Corrected 820826 Cover Ltrs Transmitting LER 82-046/03L-0 & LER 82-037/03L-0 + (01:08:57, 17 December 2024)
- ML20065A450 + (01:08:58, 17 December 2024)
- 05000331/LER-1982-052, Forwards LER 82-052/03L-0 + (01:09:03, 17 December 2024)
- ML20065A426 + (01:09:03, 17 December 2024)