ML20065A652

From kanterella
Jump to navigation Jump to search
Requests That Ltr Be Withheld from Public Disclosure,Per 10CFR2.790 & Responds to NRC 790730 Request for Info Re SNM Needs.No SNM Possessed in Excess of Formula Quantity at Any Site.Info Partially Deleted
ML20065A652
Person / Time
Site: 05000142
Issue date: 08/29/1979
From: Catton I
CALIFORNIA, UNIV. OF, LOS ANGELES, CA
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML20065A474 List:
References
FOIA-82-381 NUDOCS 8302220119
Download: ML20065A652 (2)


Text

,

dkn SG-IY2 :

e

,e Je

.N 2

7.

-rN ji y,p,gn 0F CALIFORNIA, ! 05 ANCEl.ES'

.r.n..

..C5').

.----------...-~--.;.;<-j E

    • waas
      • 4st.<>c n C,'...[.J.:.
  • A*

uu-

. t t m ecn ? S

  • Pr 7t*!*s h o s o n *x.

<o

,, c,

s;

[I!E TACTS Ar,D FICURt S Itt:THIS DOCUMEl:T ARE I;0 LC?'GER N5ID'E I

'liMELY OR ACCUY4~TE.

THE.YJ.SHOULD-BEfDjiS-IDER_ED OriLY

" d7 E d ier Hall

-(

D lil A HISTORICAL C0:4 T EXT,.

sc> mot or tsc:sr riusc as, uruto scu. set L DS A s0 elf 3. C A tn oitNIA 90c 24 l-August 29, 1979 0

10 CFR 2.-790 R ob e r t 'a'. Reid, Chief Operating Reactors Branch 14 Civision of Operating Reactors J

l U.S. *1uclear Regulatory Commissian '

i'

'a'ashington, D. C. 20555 License R-71

Subject:

Safeguards Upgrade Rule

Reference:

Letter of 7/30/79 to all nonpq-er reactor licensees i

Dear Mr. Reid:

i Due to the sensitive nature of the contents of this letter, we request that this document be withheld from public disclosure pursuant to Section 2.790 of 10 CFR Port 2.

fiew physical security plans will be submitted with our, license renewal i

application, due in i~ebruary 1980, and hence within the 120 day interval folicwing fiovember 21, 1979, in response to your specific questions regarding our needs for Stim, we submit the following:

1) we require a total of approximately 9.0 kg of SiiM;
2) we require approximately 3.6 kg of Stim in the reactor core;
3) we require approximately 4.7 kg of cold St'M in storage; we possess a further 0.7 kg of irradiated 5;iM in ourffuel ' storage pits awaiting shipment; and
4) none of the above mentioned mater'ial can be exenipled by the 100 rem /hr at 3 feet criterion.

i

'a'e note tha t the Under the above circumstances, we do not possess 5:04 in excess of the formula cuantity at any individual site under our license.'

Accordingly, our physical security plan (s) will be geared to the two non-contiguous sites containing S!C4 of moderate strategic significance. -

s 8302220119 821230 l

PDR FOIA HIRSCH82-381 PDR f

  • Le t e.=. NEGY LM RMORY
  • m.'. N 7 0 N. D.-* r ur a

f o

UNIVERSriT OF CAllFORNIA, LO.S ANGELES

.a

-:n

.., 1
9,. ! if,,I,I e L% rt tv
o :s rast - es.3crtzs m rn<: t + 5 4s na co s e.,1.x :-co se.T r<

a (=A s xT., a

.a. ;w... ---

W.l'.Q

~"

2567 Scelter Hall SCHOOL OF LNC: NEE 3:NC AND Ai PLIED sC:E.NCE LOS LNCE LE.5, CA1_ FCP.'iLt 900:4 Page two August 29, 1979 10 CFR 2.790 ticense R-71 Remotely related to the foregoing, we submitted Amer.dment 4 to our Security Plan under the assumption that 0.7 kg of SNM irradiated fuel was calls Celays by the recipient, now s5cr tly tc be shipped to ICRP, Idaho Exxon Nuclear Ida',io Co., Inc., prohibited the schedule.

Our current target shipping date is December 15, 1979.

Sincerel[

/1d W

I. Catton, Director Nuclear Energy Laboratory IC/jb cc: J. Evraets, Radiation Safety Officer C. Ashbaugh, Nuclear Energy Laboratory N U C LE A R EN E R G Y 1. A :n'_9 A TO R Y_ _ _ _ _ ~ _ _

y g.g c 3 -.y g S, p g.,..o,

_