Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-33796, Informs That Ja Bowlby No Longer Needs License for Facility + (00:40:33, 17 December 2024)
- ML20065J028 + (00:40:34, 17 December 2024)
- ML20065J026 + (00:40:35, 17 December 2024)
- ML20065J013 + (00:40:35, 17 December 2024)
- ML20065J010 + (00:40:36, 17 December 2024)
- ML20065J008 + (00:40:36, 17 December 2024)
- BSEP-94-0127, Monthly Operating Repts for Mar 1994 for Brunswick Steam Electric Plant,Units 1 & 2 + (00:40:37, 17 December 2024)
- ML20065J004 + (00:40:38, 17 December 2024)
- 05000443/LER-1994-002, :on 940210,determined Method for Performing Slave Relay Test Valve Did Not Satisfy Ts.Caused by Omission of Relevent Information from Surveillance Procedures. Procedures Revised + (00:40:39, 17 December 2024)
- ML20065J002 + (00:40:40, 17 December 2024)
- 2CAN109003, Application for Amend to License NPF-6,revising Tech Specs Re Hydraulic Shock Suppressor Insps + (00:40:41, 17 December 2024)
- ML20065H998 + (00:40:42, 17 December 2024)
- ML20065H992 + (00:40:43, 17 December 2024)
- ML20065H994 + (00:40:43, 17 December 2024)
- ML20065H989 + (00:40:44, 17 December 2024)
- ML20065H986 + (00:40:45, 17 December 2024)
- ML20065H984 + (00:40:45, 17 December 2024)
- ML20065H982 + (00:40:46, 17 December 2024)
- ML20065H979 + (00:40:47, 17 December 2024)
- 05000346/LER-1982-041-03, /03L-0:on 820821,setpoints of Three Main Steam Safety Valves Found Out of Tolerance.Caused by Normal Valve Aging.Two Valves Immediately Reset & Third Valve Adjusted at Reduced Main Steam Pressure + (00:40:48, 17 December 2024)
- ML20065H974 + (00:40:49, 17 December 2024)
- ML20065H973 + (00:40:50, 17 December 2024)
- ML20065H970 + (00:40:51, 17 December 2024)
- ML20065H971 + (00:40:51, 17 December 2024)
- ML20065H966 + (00:40:54, 17 December 2024)
- 05000346/LER-1982-041, Forwards LER 82-041/03L-0 + (00:40:55, 17 December 2024)
- 3F1090-18, Responds to NRC Re Violations Noted in Insp Rept 50-302/90-26.Corrective Actions:Procedures Will Be Revised to Clarify That Verification of Eligibility Be Performed on Shift Basis + (00:40:56, 17 December 2024)
- ML20065H962 + (00:40:56, 17 December 2024)
- ML20065H955 + (00:40:57, 17 December 2024)
- ML20065H944 + (00:40:57, 17 December 2024)
- ML20065H943 + (00:40:58, 17 December 2024)
- ML20065H942 + (00:40:59, 17 December 2024)
- ML20065H937 + (00:40:59, 17 December 2024)
- ELV-02196, Forwards Rev 0 to Cycle 2 Core Operating Limits Rept + (00:41:00, 17 December 2024)
- ML20065H928 + (00:41:00, 17 December 2024)
- ML20065H924 + (00:41:01, 17 December 2024)
- ML20065H922 + (00:41:01, 17 December 2024)
- ML20065H918 + (00:41:02, 17 December 2024)
- ML20065H913 + (00:41:03, 17 December 2024)
- ML20065H912 + (00:41:03, 17 December 2024)
- ML20065H911 + (00:41:04, 17 December 2024)
- ML20065H902 + (00:41:12, 17 December 2024)
- ML20065H905 + (00:41:12, 17 December 2024)
- ML20065H900 + (00:41:13, 17 December 2024)
- ML20065H899 + (00:41:13, 17 December 2024)
- ML20065H890 + (00:41:14, 17 December 2024)
- ML20065H884 + (00:41:15, 17 December 2024)
- ML20065H880 + (00:41:16, 17 December 2024)
- ML20065H875 + (00:41:17, 17 December 2024)
- ML20065H864 + (00:41:17, 17 December 2024)
- ML20065H862 + (00:41:18, 17 December 2024)
- ML20065H861 + (00:41:18, 17 December 2024)