Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065R509 + (00:10:34, 17 December 2024)
- 05000296/LER-1982-037-01, During Instrumentation Calibr for Core Standby Cooling Sys Suppression Chamber, Calibr Valve on Level Switch LS-73-57A Found Open Rendering Switches Inoperable.Caused by Open Valve.Valve Closed + (00:10:37, 17 December 2024)
- 05000296/LER-1982-037, Forwards Updated LER 82-037/01X-1 + (00:10:38, 17 December 2024)
- PLA-1362, Application for Amend 13 to License NPF-14,revising License Condition 2.D to Reflect Changes J,K,L & M,Revision to Chapter 11 & Security Training & Qualification Plan Including Revision 1 & Change A.Class II Amend Fee Encl + (00:10:39, 17 December 2024)
- ML20065R469 + (00:10:40, 17 December 2024)
- ML20065R464 + (00:10:40, 17 December 2024)
- ML20065R461 + (00:10:41, 17 December 2024)
- ML20065R460 + (00:10:43, 17 December 2024)
- 05000275/LER-1982-009-01, /01T-0:on 821007,testing on Auxiliary Saltwater Sys Revealed Sys Susceptible to Water Hammer Effects During Anticipated Operational Transients.Caused by Water Column Separation & Recombination at Piping Slope Change + (00:10:45, 17 December 2024)
- ML20065R456 + (00:10:46, 17 December 2024)
- 05000275/LER-1982-009, Forwards LER 82-009/01T-0 + (00:10:47, 17 December 2024)
- ML20065R453 + (00:10:47, 17 December 2024)
- ML20065R451 + (00:10:48, 17 December 2024)
- ML20065R445 + (00:10:54, 17 December 2024)
- AECM-90-0208, Forwards Rev 5 to Updated FSAR for Grand Gulf Nuclear Station & Lists Overview of Key Changes in Rev 5 of FSAR Update.Update to Current Cycle Safety Analysis Will Be Submitted Prior to 910131 + (00:10:55, 17 December 2024)
- ML20065R441 + (00:10:56, 17 December 2024)
- ML20065R439 + (00:10:58, 17 December 2024)
- 05000366/LER-1982-105-03, /03L-0:on 820918,during Selection of Rods to Increase Power,Rod Out Permissive Light Went Out.Caused by Blown Power Fuse.Fuse Replaced + (00:11:04, 17 December 2024)
- ML20065R413 + (00:11:05, 17 December 2024)
- JAFP-94-0240, 1993 Radiological Environ Operating Rept Ja FitzPatrick Nuclear Power Plant + (00:11:06, 17 December 2024)
- 05000366/LER-1982-105, Forwards LER 82-105/03L-0 + (00:11:07, 17 December 2024)
- ML20065R402 + (00:11:07, 17 December 2024)
- ML20065R400 + (00:11:08, 17 December 2024)
- ML20065R395 + (00:11:10, 17 December 2024)
- ML20065R397 + (00:11:10, 17 December 2024)
- 05000269/LER-1982-015-03, /03L-0:on 820917,reactor Protection Sys Trip Pushbutton Declared Technically Inoperable.Caused by Procedure Deficiency Which Did Not Include Required Test. Necessary Procedures Changed + (00:11:12, 17 December 2024)
- 05000269/LER-1982-015, Forwards LER 82-015/03L-0.Detailed Event Analysis Encl + (00:11:13, 17 December 2024)
- NG-94-1147, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-331/94-01.Corrective Actions:Upon Discovery of Missed TS Surveillance,Aprms Declared Inoperable & Plant Entered LCO Until Surveillance Complete + (00:11:13, 17 December 2024)
- 3F1290-11, Monthly Operating Rept for Nov 1990 for Crystal River Unit 3 + (00:11:14, 17 December 2024)
- ML20065R375 + (00:11:14, 17 December 2024)
- ML20065R370 + (00:11:15, 17 December 2024)
- ML20065R363 + (00:11:16, 17 December 2024)
- ML20065R368 + (00:11:16, 17 December 2024)
- RBG-34145, Monthly Operating Rept for Nov 1990 for River Bend Unit 1.W/ + (00:11:17, 17 December 2024)
- ML20065R359 + (00:11:18, 17 December 2024)
- ML20065R348 + (00:11:18, 17 December 2024)
- ML20065R343 + (00:11:19, 17 December 2024)
- ML20065R331 + (00:11:20, 17 December 2024)
- ML20065R333 + (00:11:20, 17 December 2024)
- JAFP-94-0252, Special Rept 94-001 Re Fire Barrier Penetration Seals Not Restored within TS Time Frame.Caused by Scope of Work in Steam Tunnel.Roving Fire Watch Posted in Recirculation Motor Generator Set Room & Floor Plugs Removed + (00:11:21, 17 December 2024)
- ML20065R329 + (00:11:21, 17 December 2024)
- ML20065R315 + (00:11:22, 17 December 2024)
- ML20065R313 + (00:11:23, 17 December 2024)
- ML20065R305 + (00:11:24, 17 December 2024)
- ML20065R297 + (00:11:25, 17 December 2024)
- ML20065R296 + (00:11:26, 17 December 2024)
- RBG-40540, Forwards Endorsements 57-60 to Nelia Policy NF-0286, Endorsements 49-52 to Maelu Policy MF-0119,Endorsements 16 & 17 to Nelia Policy N-0100 & Maelu Policy M-0100 & Endorsement 11 to Nelia Policy NW-0178 + (00:11:27, 17 December 2024)
- ML20065R289 + (00:11:28, 17 December 2024)
- NRC-94-4117, Forwards Current Status of AP600 Testing Program Issues Identified in NRC ,Including Westinghouse Understanding of Mutual Conclusions Reached at 940407 Meeting + (00:11:28, 17 December 2024)
- 05000416/LER-1982-076-03, /03L-0:on 820923,smoke Detectors in Zones 2-06, 2-07,2-17 & 2-20 of Auxiliary Bldg Alarmed & Would Not Clear.No Smoke or Fire Present.Alarms Deactivated.Caused by Dust Accumulation.Detectors Cleaned + (00:11:30, 17 December 2024)
- ML20065R280 + (00:11:31, 17 December 2024)
- ML20065R278 + (00:11:32, 17 December 2024)