Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065R698 + (00:09:11, 17 December 2024)
- ML20065R695 + (00:09:14, 17 December 2024)
- 05000336/LER-1994-003, Application for Amend to License DPR-65,incorporating Addl Requirements Into TS Re non-QA Equipment Utilized to Achieve Feedwater Isolation in Response to MSLB Inside Containment, Per Commitment Made in LER 94-003-00 & Listed I + (00:09:15, 17 December 2024)
- ML20065R694 + (00:09:15, 17 December 2024)
- ML20065R691 + (00:09:16, 17 December 2024)
- ML20065R689 + (00:09:17, 17 December 2024)
- ML20065R683 + (00:09:17, 17 December 2024)
- GO2-90-200, Monthly Operating Rept for Nov 1990 for WPPSS Unit 2 + (00:09:18, 17 December 2024)
- ML20065R680 + (00:09:18, 17 December 2024)
- ML20065R671 + (00:09:19, 17 December 2024)
- ML20065R665 + (00:09:20, 17 December 2024)
- ML20065R669 + (00:09:20, 17 December 2024)
- ML20065R663 + (00:09:21, 17 December 2024)
- 05000364/LER-1982-033-03, /03L-1:on 820817,breaker to Containment Isolation Valve Inadvertantly Opened.Caused by Personnel Error While Implementing Tagging Order.Breakers Positioned & Returned to Svc + (00:09:23, 17 December 2024)
- ST-HL-AE-3648, Forwards Proprietary Rev 1 to Unit 1,Cycle 3 Core Operating Limits Rept & Proprietary Rev 0 to Unit 2,Cycle 2 Core Operating Limits Rept. Repts Withheld + (00:09:24, 17 December 2024)
- ML20065R652 + (00:09:25, 17 December 2024)
- ST-HL-AE-3652, Monthly Operating Repts for South Texas Project Electric Generating Station for Nov 1990 + (00:09:25, 17 December 2024)
- ML20065R650 + (00:09:34, 17 December 2024)
- 05000364/LER-1982-033, Forwards LER 82-033/03L-1 + (00:09:35, 17 December 2024)
- ML20065R645 + (00:09:36, 17 December 2024)
- 05000395/LER-1982-006-03, /03L-0:on 820922,several High Range Monitors Failed High.Caused by Moisture Accumulation in Detector Preamp Connections.Plant Completed Initial Fuel Load But Was Not Critical.Monitors Replaced Except RM-G19B + (00:09:37, 17 December 2024)
- ML20065R636 + (00:09:38, 17 December 2024)
- ML20065R635 + (00:09:39, 17 December 2024)
- 05000395/LER-1982-006, Forwards LER 82-006/03L-0.Detailed Event Analysis Encl + (00:09:40, 17 December 2024)
- ML20065R628 + (00:09:47, 17 December 2024)
- 05000280/LER-1982-103-03, /03L-0:on 820927,amp Readings for Heat Tracing Panel 2 Circuit 24D Found Below Acceptance Level.Cause Unknown.Defective Heat Tracing Replaced & Design Change Initiated + (00:09:51, 17 December 2024)
- 05000369/LER-1994-002-02, :on 940406,identified Failure to Comply W/Ts Action Statement for Reactor Coolant Leakage Detection Sys. Caused by Omission of Relevant Info in Design Requirements. Corrective Action:Modifications to Computer + (00:09:55, 17 December 2024)
- ML20065R620 + (00:09:56, 17 December 2024)
- W3P90-1572, Monthly Operating Rept for Nov 1990 for Waterford 3 + (00:09:56, 17 December 2024)
- ML20065R612 + (00:09:57, 17 December 2024)
- 05000327/LER-1982-116-03, /03L-0:on 820916,both Trains of RHR Sys Inoperable Due to Inadvertent Closing of RHR Suction Valve 1-FCV-74-2. Caused by Removal of Power Fuses to Allow Work on Output Relays.Rhr Pump Stopped & Valve Reopened W/Auxiliary Pow + (00:09:59, 17 December 2024)
- 05000327/LER-1982-116, Forwards LER 82-116/03L-0 + (00:10:00, 17 December 2024)
- ML20065R602 + (00:10:00, 17 December 2024)
- LIC-90-0985, Monthly Operating Rept for Nov 1990 for Calhoun Station Unit 1 + (00:10:01, 17 December 2024)
- ML20065R600 + (00:10:01, 17 December 2024)
- 05000325/LER-1994-006-01, :on 940412,discrepancy Had Been Noted on Inputs for APRMs & Irms.Caused by Failure to Follow Standard Conventions for RMCS APRM & IRM Grouping.Corrective Action: Standing Instruction Was Issued + (00:10:04, 17 December 2024)
- 05000280/LER-1982-102-03, /03L-0:on 820923,discovered Pin Attaching Snubber 1-SHP-HSS-35B to Main Steam Line Partially Out & Snubber Cocked.Caused Undetermined.Snubber Straightened & Pins Properly Installed + (00:10:06, 17 December 2024)
- ML20065R595 + (00:10:07, 17 December 2024)
- ML20065R588 + (00:10:08, 17 December 2024)
- ML20065R583 + (00:10:09, 17 December 2024)
- 05000321/LER-1982-086-03, /03L-0:on 820917,attempt to Place Torus Cooling in Svc Failed Due to Lack of Svc Water Flow.Caused by Loose Bolts in Valve Operator Coupling,Allowing Coupling Spring Pin to Break.Pin Replaced & Bolts Tightened + (00:10:14, 17 December 2024)
- ML20065R581 + (00:10:15, 17 December 2024)
- 05000280/LER-1982-100-03, /03L-0:on 820922,pump 1-SWP-10B Became Airbound During Use of Air to Clear Sensing Lines to Water Strainers in Delta P Gauges.Caused by Injecting Air Into Svc Water Lines Upstream of Pump.Personnel Reinstructed + (00:10:17, 17 December 2024)
- ML20065R565 + (00:10:18, 17 December 2024)
- 05000321/LER-1982-086, Forwards LER 82-086/03L-0 + (00:10:22, 17 December 2024)
- PY-CEI-NRR-1228, Forwards Rev 0 to Core Operating Limits Rept for Perry Nuclear Power Plant,Unit 1 Cycle 3 (Reload 2). Nonproprietary 23A6492,Rev 0 & Proprietary 23A6492AA,Rev 0, Suppl 1 Also Encl.Proprietary Rept Withheld (10CFR2.790) + (00:10:23, 17 December 2024)
- ML20065R556 + (00:10:23, 17 December 2024)
- ML20065R550 + (00:10:24, 17 December 2024)
- ML20065R534 + (00:10:25, 17 December 2024)
- 05000368/LER-1990-022, :on 900926,discovered That Coil Unit Mounting Brackets Improperly Installed on Fan Side of Svc Water Sys Coolers.Caused by Inadequate Work Instructions During Coil Replacement.Units Drained + (00:10:26, 17 December 2024)
- ML20065R528 + (00:10:27, 17 December 2024)