Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065R762 + (00:08:35, 17 December 2024)
- RBG-40541, Forwards Rev 15 to Physical Security Plan.Rev Withheld,Per 10CFR50.54(p) + (00:08:36, 17 December 2024)
- 05000321/LER-1982-084-03, /03L-0:on 820916,channel B Main Steam Line Radiation Monitoring Instrument Failed.Cause Unknown.Spare Instrument Installed,Calibr & Tested + (00:08:38, 17 December 2024)
- ML20065R755 + (00:08:39, 17 December 2024)
- 05000321/LER-1982-084, Forwards LER 82-084/03L-0 + (00:08:40, 17 December 2024)
- ML20065R745 + (00:08:45, 17 December 2024)
- 1CAN129005, Advises of Deferral of Design Change Package 85-1050, Remote Operation of MU-13 Valve, Per Commitments in Re Hed VR:1-1.031.HED Will Be Corrected During Special Outage + (00:08:46, 17 December 2024)
- ML20065R744 + (00:08:46, 17 December 2024)
- ML20065R741 + (00:08:47, 17 December 2024)
- ML20065R734 + (00:08:52, 17 December 2024)
- ML20065R731 + (00:08:52, 17 December 2024)
- ML20065R724 + (00:08:57, 17 December 2024)
- 05000272/LER-1982-050-04, Atlantic Loggerhead Turtle Found Impinged on Circulating Water Sys Intake Trash Bars.Caused by Inability of Turtle to Actively Avoid Approach Velocities to Intake Due to Weakened State + (00:08:59, 17 December 2024)
- ML20065R722 + (00:09:00, 17 December 2024)
- ML20065R721 + (00:09:01, 17 December 2024)
- ML20065R719 + (00:09:02, 17 December 2024)
- 05000287/LER-1982-010-01, /01T-0:on 821004,discovered That Weekly Boron Waste Storage Tank Boron Sample Not Taken as Scheduled, Contrary to Tech Spec 4.1.3.Caused by Personnel Not Having Access to Posted Schedule Board.Board Replaced + (00:09:03, 17 December 2024)
- B14823, Application for Amend to License NPF-49,modifying Monthly Operational Test of Reactor Trip Bypass Breakers to Monthly Staggered Such That Each Breaker Tested Every 62 Days + (00:09:04, 17 December 2024)
- 05000302/LER-1982-045, Informs That Special Rept Supposedly Encl in 821001 Submitted LER 82-045 Determined to Be More Useful as Basis of Tech Spec Change Request to Be Submitted at Later Date + (00:09:05, 17 December 2024)
- 05000416/LER-1982-089, Forwards LER 82-089/03L-0 + (00:09:06, 17 December 2024)
- LIC-90-0909, Reqeuests Withdrawal of 891201 Application for Amend to License DPR-40 + (00:09:07, 17 December 2024)
- ML20065R707 + (00:09:07, 17 December 2024)
- 05000272/LER-1982-050, Forwards Corrected LER 82-050/04L-0.Detailed Event Analysis Encl + (00:09:08, 17 December 2024)
- B14818, Application for Amend to License DPR-65,modifying LCOs for TS 3.8.2.3 & 3.8.2.4 & SR of TS 4.8.2.3.2.c.3 to Permit Facility to Take Advantage of Recent Reevaluation of Design of 125 Volt Dc Sys + (00:09:09, 17 December 2024)
- ML20065R703 + (00:09:09, 17 December 2024)
- 05000287/LER-1982-010, Forwards LER 82-010/01T-0.Detailed Event Analysis Encl + (00:09:10, 17 December 2024)
- ML20065R698 + (00:09:11, 17 December 2024)
- ML20065R695 + (00:09:14, 17 December 2024)
- 05000336/LER-1994-003, Application for Amend to License DPR-65,incorporating Addl Requirements Into TS Re non-QA Equipment Utilized to Achieve Feedwater Isolation in Response to MSLB Inside Containment, Per Commitment Made in LER 94-003-00 & Listed I + (00:09:15, 17 December 2024)
- ML20065R694 + (00:09:15, 17 December 2024)
- ML20065R691 + (00:09:16, 17 December 2024)
- ML20065R689 + (00:09:17, 17 December 2024)
- ML20065R683 + (00:09:17, 17 December 2024)
- GO2-90-200, Monthly Operating Rept for Nov 1990 for WPPSS Unit 2 + (00:09:18, 17 December 2024)
- ML20065R680 + (00:09:18, 17 December 2024)
- ML20065R671 + (00:09:19, 17 December 2024)
- ML20065R665 + (00:09:20, 17 December 2024)
- ML20065R669 + (00:09:20, 17 December 2024)
- ML20065R663 + (00:09:21, 17 December 2024)
- 05000364/LER-1982-033-03, /03L-1:on 820817,breaker to Containment Isolation Valve Inadvertantly Opened.Caused by Personnel Error While Implementing Tagging Order.Breakers Positioned & Returned to Svc + (00:09:23, 17 December 2024)
- ST-HL-AE-3648, Forwards Proprietary Rev 1 to Unit 1,Cycle 3 Core Operating Limits Rept & Proprietary Rev 0 to Unit 2,Cycle 2 Core Operating Limits Rept. Repts Withheld + (00:09:24, 17 December 2024)
- ML20065R652 + (00:09:25, 17 December 2024)
- ST-HL-AE-3652, Monthly Operating Repts for South Texas Project Electric Generating Station for Nov 1990 + (00:09:25, 17 December 2024)
- ML20065R650 + (00:09:34, 17 December 2024)
- 05000364/LER-1982-033, Forwards LER 82-033/03L-1 + (00:09:35, 17 December 2024)
- ML20065R645 + (00:09:36, 17 December 2024)
- 05000395/LER-1982-006-03, /03L-0:on 820922,several High Range Monitors Failed High.Caused by Moisture Accumulation in Detector Preamp Connections.Plant Completed Initial Fuel Load But Was Not Critical.Monitors Replaced Except RM-G19B + (00:09:37, 17 December 2024)
- ML20065R636 + (00:09:38, 17 December 2024)
- ML20065R635 + (00:09:39, 17 December 2024)
- 05000395/LER-1982-006, Forwards LER 82-006/03L-0.Detailed Event Analysis Encl + (00:09:40, 17 December 2024)
- ML20065R628 + (00:09:47, 17 December 2024)