Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1989-017, :on 890624,HPCI Sys,Steam Line Break Delta Pressure High Signal,Channel A,Isolation Occurred.Probably Caused by Spurious Trip of Redundant Div 1 ECCS Trip Unit. Unit Replacd & Original Unit Bench Tested + (20:47:52, 16 March 2025)
- ML20247G108 + (20:48:01, 16 March 2025)
- ML20247G064 + (20:48:12, 16 March 2025)
- ML20247G062 + (20:48:15, 16 March 2025)
- L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 + (20:48:21, 16 March 2025)
- ML20247G028 + (20:48:28, 16 March 2025)
- ML20247G018 + (20:48:36, 16 March 2025)
- IR 05000395/1998001 + (20:48:51, 16 March 2025)
- IR 05000369/1997019 + (20:48:52, 16 March 2025)
- ML20247F971 + (20:48:56, 16 March 2025)
- AECM-89-0058, Responds to 890117 Request for Addl Info Re Type C Testing of Test,Vent & Drain Valves.Encl Valve Lineup Records & Drawings Provide Valve Lineups for Performing Local Rate Tests & Illustrate Components/Barriers Associated W/Test + (20:49:35, 16 March 2025)
- ML20247F773 + (20:49:46, 16 March 2025)
- IR 05000483/1998004 + (20:50:09, 16 March 2025)
- IR 05000232/2008001 + (20:50:19, 16 March 2025)
- ML20247F647 + (20:50:23, 16 March 2025)
- L-98-004, Forwards Proposed Format & Content for License Application Including Regulatory Guidance Used,For NRC Review + (20:50:37, 16 March 2025)
- ML20247F585 + (20:50:42, 16 March 2025)
- 05000423/LER-1998-022, :on 980408,failure to Provide Operable Reactor Coolant Sys Loops in Mode 4 Occurred.Caused by Human Error. Operations Personnel Involved in Event Have Been Counseled + (20:50:57, 16 March 2025)
- TAC:L32067 + (20:51:01, 16 March 2025)
- 05000423/LER-1998-023, :on 980411,ESF Actuation Occurred at Millstone Unit 3.Caused by Failure of CR Operations Personnel to Diagnose S/G C Level Loss Resulting from Abnormal Sampling Blowdown Lineup.Operating Procedure Revised + (20:51:03, 16 March 2025)
- ML20247F497 + (20:51:05, 16 March 2025)
- ML20247F487 + (20:51:12, 16 March 2025)
- ML20247F469 + (20:51:19, 16 March 2025)
- 05000341/LER-1989-017, :on 890810,determined That Consequences of Revised Analysis Are Addl Flooding Beyond That Previously Analyzed.Documentation for Updated FSAR Conclusions Cannot Be Located.Analyses Reviewed for Incorporation + (20:51:29, 16 March 2025)
- 05000346/LER-1997-015, :on 971210,EDG Tachometer Circuit Was Noted Outside 10CFR50 App R Design Basis.Caused by Less than Adequate Development & Review of Mod 84-0183.Established Hourly Fire Watch in Cable Spreading Room + (20:52:08, 16 March 2025)
- 05000346/LER-1997-008-13, Forwards LER 97-008-13 Re Inadequate Testing of Safety Related Logic.Changes Marked W/Rev Bar in Margin + (20:52:38, 16 March 2025)
- IR 05000312/1986015 + (20:52:43, 16 March 2025)
- ML20247F096 + (20:53:15, 16 March 2025)
- ML20247F082 + (20:53:19, 16 March 2025)
- IR 05000338/1988036 + (20:53:52, 16 March 2025)
- IR 05000456/1989021 + (20:54:25, 16 March 2025)
- 05000423/LER-1998-024, :on 980409,failed to Complete Action Statement Associated W/Ts 4/3.3.1 within Required Time Period.Caused by Human Error.Counseled Appropriate Shift Personnel on Efficient Time Mgt Associated W/Active TS LCO Requirements + (20:54:31, 16 March 2025)
- TAC:69526 + (20:54:43, 16 March 2025)
- IR 05000237/1989018 + (20:55:06, 16 March 2025)
- IR 05000277/1988099 + (20:55:59, 16 March 2025)
- ML20247E827 + (20:56:27, 16 March 2025)
- 05000482/LER-1998-002, :on 980409,inadequate Evaluation of RCP LO LCS Nonconforming Condition Was Noted.Caused by Personnel Error. Mod Correcting Nonconformance Has Been Implemented & Evaluations Completed + (20:56:36, 16 March 2025)
- IR 05000170/1988004 + (20:56:42, 16 March 2025)
- ML20247E785 + (20:56:50, 16 March 2025)
- NUREG-0797, Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl + (20:57:41, 16 March 2025)
- ML20247E686 + (20:57:54, 16 March 2025)
- TAC:68102 + (20:57:59, 16 March 2025)
- TAC:69138 + (20:58:34, 16 March 2025)
- IR 05000266/1998010 + (20:58:49, 16 March 2025)
- TAC:67948 + (20:59:31, 16 March 2025)
- IR 05000424/1988061 + (20:59:42, 16 March 2025)
- IR 05000454/1997021 + (21:00:33, 16 March 2025)
- IR 05000245/1989004 + (21:04:26, 16 March 2025)
- ML20247E140 + (21:04:41, 16 March 2025)
- ML20247E096 + (21:04:52, 16 March 2025)
- ML20247E047 + (21:05:08, 16 March 2025)