Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066L470 + (16:43:12, 16 December 2024)
- ML20066L457 + (16:43:13, 16 December 2024)
- ML20066L448 + (16:43:14, 16 December 2024)
- ML20066L456 + (16:43:14, 16 December 2024)
- ML20066L432 + (16:43:17, 16 December 2024)
- ML20066L430 + (16:43:18, 16 December 2024)
- ML20066L423 + (16:43:22, 16 December 2024)
- ML20066L414 + (16:43:23, 16 December 2024)
- 0CAN019108, Reissues Response to Violations Noted in Insp Repts 50-313/90-39 & 50-368/90-39.Corrective Actions:Health Physics Technicians Counseled Re Inadequate Job Performance Associated W/Core Flood Sys Check Valve CF-1B + (16:43:24, 16 December 2024)
- ML20066L401 + (16:43:24, 16 December 2024)
- ML20066L398 + (16:43:25, 16 December 2024)
- ML20066L400 + (16:43:25, 16 December 2024)
- ML20066L368 + (16:43:26, 16 December 2024)
- 05000498/LER-1990-026, :on 901219,Train B Loss of Offsite Power Actuation Occurred While Attempting to Transfer Power to Standby Bus 1G.Caused by Hardened Grease on Feeder Breaker & Friction Between Linkage.Maint Scheduled + (16:43:28, 16 December 2024)
- ML20066L358 + (16:43:29, 16 December 2024)
- ML20066L361 + (16:43:29, 16 December 2024)
- ML20066L353 + (16:43:33, 16 December 2024)
- IR 015000012/2020001 + (16:43:35, 16 December 2024)
- ML20066L350 + (16:43:36, 16 December 2024)
- ML20066L339 + (16:43:37, 16 December 2024)
- ML20066L326 + (16:43:38, 16 December 2024)
- ML20066L317 + (16:43:39, 16 December 2024)
- ML20066L279 + (16:43:41, 16 December 2024)
- ML20066L306 + (16:43:41, 16 December 2024)
- ML20066L269 + (16:43:42, 16 December 2024)
- ML20066L267 + (16:43:43, 16 December 2024)
- ML20066L260 + (16:43:44, 16 December 2024)
- ML20066L262 + (16:43:44, 16 December 2024)
- ML20066L259 + (16:43:45, 16 December 2024)
- ML20066L256 + (16:43:49, 16 December 2024)
- ML20066L255 + (16:43:50, 16 December 2024)
- ML20066L252 + (16:43:50, 16 December 2024)
- ML20066L251 + (16:43:51, 16 December 2024)
- ML20066L237 + (16:43:53, 16 December 2024)
- ML20066L245 + (16:43:53, 16 December 2024)
- ML20066L234 + (16:43:54, 16 December 2024)
- ML20066L232 + (16:43:55, 16 December 2024)
- ML20066L219 + (16:43:55, 16 December 2024)
- RBG-27301, Suppl to 10CFR21 Deficiency Rept Re Failure of Rotor Winding on Transamerica Delaval/Nei Peebles Electric Products Diesel Generator.Initially Reported on 871116.Electrical Testing Instituted & Surveillance Continues.W/Two Oversize Drawings + (16:43:57, 16 December 2024)
- 05000244/LER-1982-023-03, /03L-0:on 821016,nipple to Discharge Pipe of 1B Component Cooling Water Pump Broke Off While Investigating Leakage.Caused by Personnel Error.Failed Pipe Replaced W/ Steel Schedule 80 Nipple + (16:44:00, 16 December 2024)
- ML20066L202 + (16:44:02, 16 December 2024)
- 05000334/LER-1982-045-03, /03L-0:on 821017,1A Containment Vacuum Pump Drive Belt Broke.Caused by Aging.Drive Belt Replaced + (16:44:03, 16 December 2024)
- 05000244/LER-1982-023, Forwards LER 82-023/03L-0 + (16:44:04, 16 December 2024)
- ML20066L191 + (16:44:05, 16 December 2024)
- 05000334/LER-1982-045, Forwards LER 82-045/03L-0 + (16:44:06, 16 December 2024)
- ML20066L186 + (16:44:06, 16 December 2024)
- 05000249/LER-1982-041-03, /03L-0:on 821021,discovered That Monthly Fire Protection Surveillances Dfpp 411-2 Were Partially Finished & Exceeded 31 Day Completion Requirement.Caused by Operating Shift Oversight + (16:44:08, 16 December 2024)
- ML20066L183 + (16:44:10, 16 December 2024)
- ML20066L181 + (16:44:10, 16 December 2024)
- 05000334/LER-1982-046-03, /03L-0:on 821023,shutdown Bank B Rod E-11 Declared Inoperable When Rod & Primary Voltage Readings Indicated Misalignment.Caused by Primary Voltage Power Supply Drift. Supply Adjusted + (16:44:12, 16 December 2024)
- ML20066L169 + (16:44:13, 16 December 2024)
- 05000255/LER-1982-039-01, /01T-0:on 821105 & 07,sample from Safety Injection Tank B (T-82B) Showed Boron Concentration Below Tech Spec Limit.Caused by Minor Leakage Past Loop Check Valve & SIT Check Valve or Fill & Drain Valve.Valves Will Be Inspecte + (16:44:15, 16 December 2024)