NRC FORM 591M PART 1 U.S. NUCLEAR REGULATORY COMMISSION (07-2012}

10 CFR2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1 LICENSEE/LOCATION INSPECTED:

GeoLog Well Services, In West Smith Street Wayne, City. IL 62895 Location Inspected: Job Site near Union, IN REPORT NUMBER(S) 2020-00 J 3. DOCKET NUMBER(S)

]50-00012 LICENSEE:

2. NRG/REGIONAL OFFICE Region m U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 4. LICENSE NUMBER(S)

5. DATE($) OF INSPECTION GL per IO CFR 150.20 / IL-02277-01 January 29, 2020 The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRG) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records. interviews with personnel, and observations by the inspector. The inspection findings are as follows: Based on the inspection findings, no violations were identifie.

Previous violat1on(s) close.

The violations(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise

,/ discretion, were satisfie Non-cited violation(s) were discussed involving the following requirement(s):

During this inspection, certain of your activities, as described beiow and!or attached, were in violation of NRC requirements and are being cited in accordance with NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with10CFR19.1 '

,

'

(Violations and Corrective Actions)

Contrary to 10 CFR 39.65(a), on January 29, 2020, a logging supervisor employed by GeoLog Well Services, Inc. did not wear a personnel dosimeter while handling two sealed sources containing licensed materia As corrective action for this Severity Level IV violation, the logging supervisor wore a calibrated electronic dosimeter for the remainder of the work. The licensee also revised its pre-trip vehicle/ equipment checklist to include extra steps instructing crews to confirm the presence of dosimetry, a survey meter and long-handled tools before leaving the sho Statement of Corrective Actions l hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which wili be taken, date when full compliance will be achieved). I understand that no further written response to NRG will be required, unless specifically requeste TITLE I

PRINTED NAME

_stGNATURE DATE LICENSEE'S i

/

/

/..la-/

REPRESENTATIVE i (;rZ.f &D-R'f \\~ _ i?.::iT'fORPP L,t::::::;,,,,.,,!'ft l.:f/JIH/J

"J/tu"/2..n...:i I

NRG INSPECTOR J Ryan Craffey BRANCH CHIEF I Robert Ruiz. Acting Chief i

.

-

NRG FORM 591M PART 1 (07-2012)

y.,L {, /' (/

Digitaiiyfigned by Ryan J. Craffey

  • ,

"f-1 Date: 2020.03.04 12:27:14 -07'00'

Christine A. Lipa Digitally signed by Christine A Lipa Date: 2020.03.05 07:54:i 7 -06'00'

NRC FORM 591M PART 3 (07-2012)

10 CFR2.201 U.S. NUCLEAR REGULATORY COMMISSION Docket File Information SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LICENSEE/LOCATION INSPECTED:

Geo Log Well Services, In West Smith Street Wayne, City, IL 62895 Location Inspected: Job Site near Union, IN REPORT NUMBER(S) 2020-001 3. DOCKET NUMBER(S)

150-00012 6. INSPECTION PROCEDURES USED 87123 2. NRG/REGIONAL OFFICE Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 4. LICENSE NUMBER(S)

5. DATE(S) OF INSPECTION GL per IO CFR 150.20 / IL-02277-01 January 29, 2020 7. INSPECTION FOCUS AREAS FE 1-6 SUPPLEMENTAL INSPECTION INFORMATION 1. PROGRAM CODE(S)

03111 2. PRIORITY

D Main Office Inspection D Field Office Inspection 3. LICENSEE CONTACT Greg Pottorff - President, RSO Next Inspection Date:

~~~~---------~---~~

.. --

4. TELEPHONE NUMBER (618) 895-2140 TBD

[ZJ Temporary Job Site Inspection CR 750 Nat Cutoff Road, Washington Township, IN PROGRAM SCOPE This was an announced field inspection of a well services company authorized by the State of Illinois to store byproduct material at its facility in Wayne City, Illinois, and to use that material for well logging at temporary job sites in Illinois jurisdiction. The licensee conducted those activities at temporary job sites in NRC jurisdiction under the terms of a reciprocity request filed and approved in January 2020 for the calendar year. The scope of this inspection was limited to an evaluation of licensed activities (logging a wildcat natural gas well using Cs-137 and Am--241 sealed sources) in a rural area of southwestern Indiana, approximately a half mile west of the unincorporated community of Union, Indian PERFORMANCE OBSERVATIONS The inspector observed the conduct of well logging activities at the temporary job site near Union. The inspector observed the logging supervisor and his assistant assemble, use, and dismantle the tool string containing both sealed sources of licensed material, noting the use oflong-handled tools and other ALARA practices throughout. The inspector observed the logging supervisor perform surveys of the tools and job site using a calibrated survey meter, and conducted independent surveys to confirm the absence of residual contamination on or in the vicinity of the tools and the wellhea The inspector also conducted independent surveys of the sources in their locked, blocked and braced safes to verify compliance with DOT limits for radiation levels during transport on public highways. The inspector reviewed a selection of records available on the job site, including shipping papers, operating and emergency procedures, radiation surveys and instrument calibration records, current leak tests for both sources, and a copy of the company's State of Illinois radioactive materials license. The inspector did note that the job site coordinates on the lic~nsee's reciprocity change report were inaccurate; however this was because the client initially gave the licensee inaccurate informatio While observing the conduct of well logging activities, the inspector discovered that the logging supervisor was not wearing a personnel dosimeter while handling licensed material, contrary to IO CFR 39.65(a). The logging supervisor was initially unsure of where his badge had gone. Upon returning to the shop he discovered that it had fallen off his person while preparing to leave for the job sit [ continued on next page ]

NRC FORM 591M PART 3 (07-2012)

NRC FORM 591M PART 3 (07-2012)

10 CFR2.201 U.S. NUCLEAR REGULATORY COMMISSION Docket File Information SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LICENSEE/LOCATION INSPECTED:

Geo Log W eU Services, In West Smith Street Wayne, City, IL 62895 Location Inspected: Job Site near Union, IN REPORT NUMBER(S) 2020-001 3. DOCKET NUMBER($)

150-00012 6. INSPECTION PROCEDURES USED 87123 2. NRG/REGIONAL OFFICE Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 4. LICENSE NUMBER($)

5. DATE(S) OF INSPECTION GL per 10 CFR 150.20 I IL-02277-01 January 29, 2020 7. INSPECTION FOCUS AREAS FE 1-6 SUPPLEMENTAL INSPECTION INFORMATION 1. PROGRAM CODE(S)

03111 2. PRIORITY

D Main Office Inspection D Field Office Inspection 3. LICENSEE CONTACT 4. TELEPHONE NUMBER Greg Pottorff - President, RSO (618) 895-2140 Next Inspection Date:

TBD

[Z] Temporary Job Site Inspection CR 750 Nat Cutoff Road, Washington Township, IN PROGRAM SCOPE

[ continued from previous page ]

The inspector detennined that the root cause of the violation was an oversight. As corrective action, the logging supervisor wore a calibrated electronic dosimeter for the remainder of the work, collecting approximately 0.04 millrem of dose during disassembly of the tool string and return of both sources to storage. The licensee also revised its pre-trip vehicle/ equipment checklist to include extra steps instructing crews to confirm the presence of dosimetry, a survey meter and long-handled tools before leaving the shop. The licensee forwarded a copy of the revised checklist template to the inspector on February 26, 202 NRG FORM 591M PART 3 (07-2012)