Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000458/LER-1990-048, :on 901224,EQ Operability Status of Two H Ingniters Apparently Exceeded Lifetimes.Caused by Temps Higher than Originally Used to Calculate Lifetimes.Six H Igniters & Associated Cables Replaced + (16:31:48, 16 December 2024)
- ML20067C849 + (16:31:49, 16 December 2024)
- ML20067C845 + (16:31:50, 16 December 2024)
- ML20067C835 + (16:31:53, 16 December 2024)
- ML20067C832 + (16:31:54, 16 December 2024)
- ML20067C823 + (16:32:00, 16 December 2024)
- BSEP-82-2734, Forwards Monthly Operating Repts for Nov 1982 + (16:32:01, 16 December 2024)
- ML20067C819 + (16:32:02, 16 December 2024)
- ML20067C821 + (16:32:02, 16 December 2024)
- PY-CEI-NRR-1293, Forwards Clarification of Two Issues Discussed in 901214 Response to Violation Noted in Insp Rept 50-440/90-12,per 910108 Telcon + (16:32:03, 16 December 2024)
- RBG-40146, Responds to Violation Noted in Insp Rept 50-458/93-28 Re Failure to Implement Corrective Actions Which Allowed Entry by Plant Into Condition Prohibited by Ts.Work Control Process Refined to Prevent Nonscheduled Work or Testing + (16:32:04, 16 December 2024)
- JSP-062-94, Responds to 931227 RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers + (16:32:05, 16 December 2024)
- B14713, Nonproprietary Version of Response to NRC Questions on RCS Flow Reduction Evaluation + (16:32:06, 16 December 2024)
- RBG-13-665, Responds to NRC 820708 & 0929 Ltrs Re Violations Noted in IE Insp Rept 50-458/82-03.Corrective Actions:Pipe Supports Designed Per ASME Code Requirements + (16:32:06, 16 December 2024)
- ML20067C807 + (16:32:07, 16 December 2024)
- ML20067C803 + (16:32:16, 16 December 2024)
- ML20067C800 + (16:32:23, 16 December 2024)
- ML20067C795 + (16:32:30, 16 December 2024)
- ML20067C792 + (16:32:31, 16 December 2024)
- ML20067C790 + (16:32:31, 16 December 2024)
- ML20067C785 + (16:32:39, 16 December 2024)
- ML20067C784 + (16:32:39, 16 December 2024)
- ML20067C778 + (16:32:40, 16 December 2024)
- ML20067C779 + (16:32:40, 16 December 2024)
- 05000346/LER-1982-056, Forwards LER 82-056/03L-0 + (16:32:41, 16 December 2024)
- ML20067C774 + (16:32:48, 16 December 2024)
- HL-4509, Responds to NRC Re Violations Noted in Insp Repts 50-321/93-27 & 50-336/93-27.Corrective Actions:Default Flow Rate Values Used in SPDS Reactor Bldg Stacks Revised & Effects of Inaccurate Flow Rates on Effluents Evaluated + (16:32:55, 16 December 2024)
- ML20067C764 + (16:32:55, 16 December 2024)
- 05000425/LER-1994-003, :on 940127,PEO Mistakenly Measured Temp in Two Different Areas of Room A009,rather than Taking Separate Mesurements in Rooms A009 & A008.Caused by Personnel Error. PEO Coached & Reminded of Importance to Detail + (16:33:06, 16 December 2024)
- ML20067C753 + (16:33:07, 16 December 2024)
- ML20067C745 + (16:33:11, 16 December 2024)
- ML20067C744 + (16:33:12, 16 December 2024)
- ML20067C743 + (16:33:12, 16 December 2024)
- ML20067C741 + (16:33:13, 16 December 2024)
- ML20067C740 + (16:33:14, 16 December 2024)
- 05000352/LER-1991-001-01, :on 910107,3 of 4 Reactor Encl HVAC Supply & Exhaust Air Fans Tripped,Resulting in High Positive Air Pressure.Plant Shutdown on 910108.Caused by Failure of Discharge Dampers to Open Fully.Coil Replaced + (16:33:15, 16 December 2024)
- ML20067C734 + (16:33:17, 16 December 2024)
- 05000250/LER-1982-015-03, /03L-0:on 821104,during Normal operation,3A High Head Safety Injection Pump Failed to Start from Manual Operation.Cause Undetermined.Pump Breaker Racked Out & Back In.Repairs Made to Breaker + (16:33:19, 16 December 2024)
- 05000250/LER-1982-015, Forwards LER 82-015/03L-0 + (16:33:20, 16 December 2024)
- ML20067C729 + (16:33:20, 16 December 2024)
- ML20067C723 + (16:33:22, 16 December 2024)
- 05000237/LER-1982-046-03, /03L-0:on 821109,during Normal Operation,High Range Boron Test for Standby Liquid Control,Dcp 1100-4, Revealed Boron Concentration Below Tech Specs.Caused by Inadequate Procedure for Sys Leakage.Procedure Revised + (16:33:23, 16 December 2024)
- 05000237/LER-1982-046, Forwards LER 82-046/03L-0 + (16:33:24, 16 December 2024)
- 05000301/LER-1982-009-01, /01T-0:on 821122,axial Flux Differential Monitoring Program & Alarm Found Inadvertently Halted from 821120-22 W/O Manually Logging Flux Differential.Caused by Operator Diagnosing Backup Computer Problem + (16:33:26, 16 December 2024)
- 05000301/LER-1982-009, Forwards LER 82-009/01T-0 + (16:33:27, 16 December 2024)
- ML20067C697 + (16:33:27, 16 December 2024)
- ML20067C672 + (16:33:31, 16 December 2024)
- SVP-56-825, Final Deficiency Rept Re Conduit & Cable Tray Hanger Insp Repts.Initially Reported on 820721.Commonwealth-Lord Joint Venture Revised Insp Procedures to Clarify Documentation Requirements + (16:33:33, 16 December 2024)
- ML20067C665 + (16:33:33, 16 December 2024)
- ML20067C623 + (16:33:34, 16 December 2024)
- ML20067C625 + (16:33:34, 16 December 2024)