Ro:On 821201,west Centrifugal Charging Pump Rendered Inoperable Following Mod on East & West Centrifugal Pump Common Mini Flow Line.Caused by Cut Made on Pressurized Portion of Piping.Investigation in Progress
ML20067C625
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/02/1982
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8212100177
Download: ML20067C625 (2)


Text

OO C

O Y(

,,,,,, INDIANA & MICHIGAN ELEC[RIC_ COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridsmas, Michigan 49106 (616) 465-6901 December 2, 1982 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License: DPR-74 Docket No. 50-316

Dear Mr. Keppler:

This letter is to confirm our telephone call made to Mr.

E.R. Swanson, NRC Region III Resident Inspector, at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> on December 1 1982, in accordance with Unit 2 Tech-nical Specification 6.9.1.8 to inform him of the following event.

On December 1, 1982, the Unit 2 West Centrifugal Charging Pump (CCP) was rendered inoperable following a modification performed on the East and West Centrifugal Charging Pump's common mini-flow line. Unit 2 was in Mode 5 at the time and the West Centrifugal Charging Pump was the operable charging pump pursuant to Technical Specification 3.1.2.3.

The scheduled work was to affect only the East Centrifugal Charging Pump and the mini-flow line of the West Centrifugal Charging Pump. The cut was to be made downstream of valve CS-298W which was the isolation point for the West Centri-fugal Charging Pump. The actual cut, however, was made upstream of valve CS-298W which is a pressurized portion of the West Centrifugal Charging Pump outlet piping. This rendered the West Centrifugal Charging Pump inoperable and placed the Plant into Action Statement A of Technical Spe-cification 3.1.2.3.

! Our investigation into this matter is in progress and a followup report will be submitted by December 15, 1982.

Sincerely, o

WG Plant Manager l

8212100177 021202

! /bab PDR ADOCK 05000316 C PDR (DEC 6 082 cc: See Attached Distribution

{_hfhk

.s. l e

! Mr. J.G. Kepplcr December 2, 1982 ,

Page 2 of 2 cc: J.E. Dolan R.S. Hunter M.P. Alexich R.F. Kroeger K.J. Vehstedt E.R. Swanson/N.E. DuBry RO:III R.C. Callen.MPSC G. Charnoff, Esq.

J.M. Hennigan R.O. Bruggee EPRI INPO PNSRC J.F. Stietzel E.L. Townley Dir., IE_(40 copics)

Dir., MIPC (4 copies) l 1

_ _ - _ _ l